TXX-7072, Interim Deficiency Rept CP-86-08 Re Installation of Super Hilti Kwik Bolts.Initially Reported on 870205.Evaluation Continuing.Next Rept Will Be Submitted by 880224

From kanterella
Revision as of 08:35, 2 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Interim Deficiency Rept CP-86-08 Re Installation of Super Hilti Kwik Bolts.Initially Reported on 870205.Evaluation Continuing.Next Rept Will Be Submitted by 880224
ML20237A519
Person / Time
Site: Comanche Peak  
Issue date: 12/09/1987
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-86-08, CP-86-8, TXX-7072, NUDOCS 8712150058
Download: ML20237A519 (1)


Text

. _ _ _ _ _ _ _ _ _ _ _ _ _ _

~

kk i

M==

Log # TXX-7072 L

2 File # 10110 E

E 903.9

" # IU "O'

("}

1UELECTRIC waa.m c. counsu December 9, 1987 Emutne Var Pirmukrit U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.

20555

SUBJECT:

COMANCHE PEAK SlEAM ELECTRIC STA110N (CPSES)

DOCKET NOS. 50-445 AND 50-446 INSTALLATION OF SUPER HILTI KWIK BOLTS SDAR: CP-86-08 (INTERIM REPORT)

Gentlemen:

On February 5,1987, we verbally notified your Mr. T. F. Westennan of a deficiency involving the control of stamps used to identify Super Hilti Kwik Dolts (llKB).

This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). Our previous report was logged TXX-6889 dated October 19, 1987.

We are continuing our evaluation of this issue and will submit our next report by February 24, 1988.

Very truly yours,

' 4%

i W. G. Counsil CBC/grr l

c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) 8712150058 871209 d)

PDR ADOCK 05000445 y

s DCD D

400 Mrth Olne Street LB BI Dallas. Texas 75201 0