ML20238E885

From kanterella
Revision as of 05:22, 2 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 22 to UFSAR for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.Annual Rev Will Be Submitted IAW 10CFR50.71(e) in Dec 1998
ML20238E885
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 08/28/1998
From: Cruse C
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20238E887 List:
References
NUDOCS 9809020270
Download: ML20238E885 (2)


Text

', - ' - '

1'

'

  • l..f

-.c e Q 2.ef

..c..<

e C

5-'

' g g.% ' ' 4. ' '- .. i,' h

\\.ll k l-( ). h.,){.; $,; &.-l:',0lllY 'd$i,k.0k;i%.(*-h &fllf!k,[h.))N?k$$iff j

7 s.t CH ARLES II. CR USE

.]

Baltimore Gas and Electric Company Vice President Calvert Cliffs Nuclear Power Plant Nuclear Energy 1650 Calven Cliffs Parkway Lusby, Maryland 20657 410 495-4455 August 28,1998 U. S. Nuclear Regulatory Commission Washington,DC 20555 ATTENTION:

Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Uodated Final Safety Analysis Reoort. Revision 22 Enclosed for your use is one original and ten copies of Revision 22 of our Updated Final Safety Analysis Report (UFSAR). This is a non-routine update to the UFSAR to incorporate the Technical Requirements Manual in support of the Calvert Cliffs Improved Technical Specifications. The List of Effective Pages is included. Please replace the appropriate pages ofyour copies of the UFSAR with the enclosed pages.

The annual revision will be submitted in accordance with 10 CFR 50.71(e) in December 1998.

n

(>-l 3

m

{ N 20270 980828ADOCK 05000317

{U DR PDR

\\\\

p m. a.

Document Control Desk August 28,1998 Page 2 Should you have questions regarding this matter, we will be pleased to discuss them with you.

Very truly yours,

/

/

p dol-STATE OF MARYLAND

TO WIT:

COUNTY OF CALVERT I, Charles H. Cruse, being duly sworn, state that I am Vice President, Nuclear Energy Division, Baltimore Gas and Electric Company (BGE), and that I am duly authorized to execute and file this response on behalf of BGE. To the best of my knowledge and belief, the statements contained in this document are true and correct. To the extent that these statements are not based on my personal knowledge, they are based upon information provided by other BGE employees and/or consultants. Such information has been reviewed in accordance with company practice and I believe it to be reliable, y

ur M 4%w

/

Subscribed and sworn before me, a Notary Public in and for the State of Maryland and County of l

Celtxet

.this 28 day of

/h=ust.1998.

u WITNESS my Hand and Notarial Seal:

Notary Public My Commission Expires:

W g

Date CHC/MRC/bjd

Enclosure:

Updated Final Safety Analysis Report, Revision 22 cc:

R. S. Fleishman, Esquire H. J. Miller, NRC J. E. Silberg, Esquire Resident Inspector, NRC S. S. Bajwa, NRC R.1. McLean, DNR A. W. Dromerick, NRC J. H. Walter, PSC i

__