ML20245L364

From kanterella
Revision as of 00:44, 2 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of Significant Licensee Meeting on 890713 in North Omaha,Nb for SALP Presentation
ML20245L364
Person / Time
Site: Fort Calhoun 
Issue date: 06/29/1989
From: Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 8907050466
Download: ML20245L364 (2)


Text

l-

}

[

l cN

'e UNITED STATES

(

a

'h 4

NUCLEAR REGULATORY COMMISSION -

>l 7

.f hO 1

REGloN IV.

' k, g,

8 611 RYAN PLAZA oRIVE, SUITE 1000 ARLINGTON, TEXAS 76011 l

1 June 29, 1989 1

i a

NOTICE OF SIGNIFICANT LICENSEE MEETING 1

I Name of Licensee: Omaha Public Power District Name of Facility:

Fort Calhoun-Station Docket:

50-285

.]

Date and Time July 13, 1989, at 9 a.m.

of Meeting:

I Location of Meeting: Fort Calhoun Emergency Operations facility, North Omaha l

Purpose of Meeting:

SALP Presentation ij NRC Attendees:

R. Martin, Regional Administrator.

j J. Milhoan, Director, Division of Reactor Projects T. Gwynn, Deputy Director, Division of Reactor Projects J. Jaudon, Acting Director, Division of Reactor Safety A. Beach, Director, Division of Radiation Safety and Safeguards I

T. Westennan, Chief, Project Section B

]

i J. Sharkey, Regional Coordinator for Region IV A. Bournia, Project Manager, Project Directorate IV

.P. Harrell, Senior Resident Inspector, Fort Calhoun Station 1

T. Reis, Resident Inspector, Fort Calhoun Station j

1 Licensee Attendees:

W. Jones, Senior Vice President K. Morris, Division Manager, Nuclear Operations S. Gambhir, Division Manager, Production Engineering R. Andrews, Division Manager, Quality.ano Environmental 1

Affairs J. Fisicaro, Supervisor, Nuclear Licensing and Industry Affairs G. Peterson, Manager, Fort Calhoun Station a

Note: Attendance by NRC personnel at the NRC/ licensee meeting should be made l

knt,wn by COB on July 11, 1989, via telephone call to T. F. Westerman (FTS728-8145).

E 890705046kh$hohhgS PDR ADOC ames L. MHhoan,. Director

,g PNU Division of Reactor Projects

+g, G

I fl

i 1

4.,. :.

j

. i 4.'

-2.

]

a i

l

\\

L Distribution:

J. ; M. Taylor,. DEDR i

.H. L. Thompson, DEDS i

T.. E. Murley, D/NRR

- F. J. Miraglia, ADT/NRR.

J. G.'Partlow, ADP/NRR J. Lieberman, D/0E.

i

~L.. J. Chandler, Asst. GC for Enf.

A. Bouinia, Project Manager, NRR 1

~J. M. Sharkey, OED0 Staff R. D. Martin, RIV R. : E.. Hall, RIV G. F.'Sanborn, EO-

' I C. A. Hackney. RSLO l

1 J. Gill'lans, PAO, RIV NRC Attendees -

IDMB;1E45j7 J!).

1 Licensee Addrdss List l

a i

I 1

3 i

' l i,

\\..

i

.__m.___.________._.__