ML16111A831
From kanterella
Revision as of 07:38, 27 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML16111A831 | |
Person / Time | |
---|---|
Site: | Pilgrim |
Issue date: | 04/13/2016 |
From: | NRC Region 1 |
To: | |
Burritt A L | |
References | |
Download: ML16111A831 (10) | |
Similar Documents at Pilgrim | |
---|---|
Category:- No Document Type Applies
MONTHYEARML21230A2902021-09-0202 September 2021
[Table view]Pilgram-QA Enclosure Response to Questions from David Lochbaum Regarding U.S. Nuclear Regulatory Commission Inspection Report No. 05000293/2020002 & 2020003, Holtec Decommissioning International, LLC, Pilgrim Nuclear Power Station, Plymouth ML20008D2232020-01-0808 January 2020 NRC Region I Twitter Feeds 10-1 to 12-31-2019 ML19339D3572019-09-0909 September 2019 Nuclear Energy Liability Insurance Association - Amendatory Endorsement ML19198A2832019-08-13013 August 2019 Notification of Significant Licensing Action - Proposed Issuance of Order Approving a License Transfer Application for Which a Hearing Has Been Requested ML19050A1932019-02-11011 February 2019 Enclosuletter of Concurrence from the Town of Plymouth and Commonwealth of Massachusetts on the Proposed 30-Minutes Declaration Time and 60-Minute Timeframe for Notification ML17100A8482017-04-13013 April 2017 Statement from the Office of U.S. Senator Elizabeth Warren - NRC Annual Meeting, Plymouth, Ma ML17101A4122017-03-21021 March 2017 3/21/2017 - Annual Assessment/95003 Inspection Exit Meeting for Pilgrim Nuclear Power Station - Speaker Sign-Up Sheets ML17045A5762017-02-14014 February 2017 1/31/2017 - Category 3 Public Meeting - Preliminary Findings and Status of 95003 Inspection at Pilgrim - Speaker Sign-Up Sheets ML17055A6992017-02-0707 February 2017 Petition Received at Pilgrim 95003 Public Meeting from Pilgrim Legislative Advisory Coalition #46 Janet Azarovitz CNRO-2016-00024, Entergy - Form 10-K for Fiscal Year Ended December 31, 20152016-12-20020 December 2016 Entergy - Form 10-K for Fiscal Year Ended December 31, 2015 ML16117A0572016-04-25025 April 2016 P. Berry Letter Operation of Pilgrim Nuclear Power Station ML16111A8312016-04-13013 April 2016 4/13/2016 - Pilgrim Nuclear Power Station Annual Assessment Meeting - Sign-in Sheets ML15231A3642015-05-27027 May 2015 FOIA/PA-2014-0204 - Resp 1 - Final, Group a ML15084A0452015-03-18018 March 2015 3/18/2015 - Pilgrim 2014 Annual Assessment Meeting Sign-In Sheets ML15020A7362015-01-20020 January 2015 LTR-15-0021-1 Oedo Ticket - Safety and Evacuation Planning Concerns for Truro Elementary School Children and Decommissioning of the Pilgrim Nuclear Power Plant ML14203A4402014-07-24024 July 2014 Certification from the Secretary of the Commission ML14203A4342014-07-0303 July 2014 Document Order - Design and Analysis Report Vol. 1 ML14127A4282014-04-25025 April 2014 LTR-14-0265-Ticket - Representative William R. Keating Ltr. Safety of the Pilgrim Nuclear Power Station and Calls for the Closing of the Station ML14113A0582014-04-18018 April 2014 LTR-14-0224-Ticket - Senator Edward J. Markey and Senator Elizabeth Warren Ltr. Measures Needed to Protect Pilgrim Nuclear Power Station and the Seabrook Station Against Seismic Vulnerability ML13364A2832013-12-30030 December 2013 Announcement of 2014 Generic Fundamentals Examination Administration Dates-Letter Dated Dec 30, 2013 ML13318A8222013-11-11011 November 2013 G20130808/LTR-13-0883-Ticket - Meg Sheehan, Earthrise Law Center, Et Al., Ltr. Pilgrim Nuclear Power Station: Endangered Species Act Compliance ML13210A4542013-07-26026 July 2013 LTR-13-0641 - Mary Lampert, Ltr. Pilgrim Watch'S Follow-up to PRB Meeting of 07/19/13, Pilgrim Watch 2.206 Petition to Immediately Suspend the Operating License of Pilgrim Station Until the Provisions of EA-12-050 & EA-13-109 Fully Implemen ML13143A3312013-06-0606 June 2013 Operating Boiling-Water Reactor Licensees with Mark 1 and Mark 2 Containments Addresses List - Enclosure 2 ML12101A3082012-04-10010 April 2012 Annual Assessment Meeting Attendee List ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML11238A1192011-08-26026 August 2011 Certificate of Service for Pilgrim Watch Petition for Review of Memorandum and Order (Denying Pilgrim Watch Requests for Hearing on Certain New Contentions) ML1118104962011-06-30030 June 2011 Aam Attendance Sheets ML1002209382009-03-30030 March 2009 Data Sheet 1 for Pilgrim Nuclear Power Station, Checklist for Step 1 Review ML0901402852008-07-21021 July 2008 U.S. NRC Invoices to Entergy Nuclear Operations, Inc for Pilgrim ML0806704192008-03-0707 March 2008 CDBI Findings ML0732400242007-10-25025 October 2007 Examples of Max Thermal Power License Conditions ML0726303192007-09-14014 September 2007 P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List ML0726301142007-09-14014 September 2007 / P. Paquin Ltr Amendment to Certificate of Compliance No. 9208 for the Model No. 10-142B Package (TAC L24117)/S121170 ML0715602322007-06-0404 June 2007 Redacted Page (1) from: Follow Up to CR-PNP-2005-05471 - Outstanding Questions (License Document) ML0713701512007-05-18018 May 2007 Feedback Form for Pilgrim Annual Assessment Meeting 2006-07 ML0713706552007-03-10010 March 2007 LTR-07-0346 - Nancy M. Oates Re Annual Town Meeting on 03/10/2007on Articles 38 & 39, Pilgrim Aging Management Plan & Pilgrim Plume Transport Model ML0703305602006-12-14014 December 2006 Open House Information Sheet, Associated with the Environmental Review for the Proposed Licensed Renewal of Pilgrim Nuclear Power Station ML0634103562006-12-0505 December 2006 Enclosure 4, Plant Mailing List ML0627804602006-10-0505 October 2006 Meeting Attendees Signatures ML0707801352006-09-21021 September 2006 CR-PNP-2006-03497, During the Nrc'S Walkdown of the Torus Compartment as Part of License Renewal Review, the Inspectors Noted the Presence of Combustible Material. ML0626803612006-09-20020 September 2006 Acceptability Review of Licensee Shift Staffing/Augmentation Time Change Request ML0707901302006-09-20020 September 2006 CR-PNP-2006-03479, Torus Anchor Bolt Baseplate Assemblies in Bays 9, 10, & 15 Found to Be Corroded ML0707901362006-09-19019 September 2006 CR-PNP-2006-03469, B Core Spray Suction Pipe Support H-14-1-8 in Torus Room Found to Be Corroded ML0707901432006-09-19019 September 2006 CR-PNP-2006-03468, a & B Aux Bay to Torus Loop Seal Piping (Secondary Containment Boundary Found with Heavy Corrosion) ML0707901562006-09-19019 September 2006 CR-PNP-2006-03467, Evidence of Past (Non-Active) Leakage Found on Torus Room Bay 1 Wall ML0704404792006-05-18018 May 2006 CR-PNP-2006-01914 - Pilgrim ML0707801972006-03-0808 March 2006 CR-PNP-----------, CR Just Entered, Operability of Refuel Bellows Seal Rupture Drain Leakage Alarm Switch ML0633406932005-07-29029 July 2005 FOF ML0626803482005-07-29029 July 2005 Exercise Week ML0626803532005-07-28028 July 2005 Condition Report List 2021-09-02 |
Retrieved from "https://kanterella.com/w/index.php?title=ML16111A831&oldid=382254"