NUPIC Joint Utilities Audit Perspective on 10CFR Part 21 June 13, 2024 E. Mayhorn

Discussion Topics

  • Introduction
  • What is covered in NUPIC Joint Utility Audits
  • Reporting Avenues
  • Common Audit Findings related to Part 21
  • Tidbits
  • References

Introduction & Background

  • We are noticing an uptick in the number of issues being identified in the area of 10CFR Part 21

What is covered during NUPIC Joint Utilities Audits

  • Verification of Part 21 process including time frames for evaluations, notification and reporting timeframes per 10CFR21.21 (a), (b) and (d).

What is covered during NUPIC Joint Utilities Audits Verification of Record Requirements

  • Retain evaluations of all deviations and failures to comply for a minimum of five years after the date of the evaluation;
  • Suppliers of basic components must retain any notifications sent to purchasers and affected licensees for a minimum of five years after the date of the notification.

What is covered during NUPIC Joint Utilities Audits Verification of Record Requirements (continued)

  • Applicants for standard design certification under subpart B of part 52 of this chapter and others providing a design which is the subject of a design certification, during and following Commission adoption of a final design certification rule for that design, shall retain any notifications sent to purchasers and affected licensees for a minimum of 5 years after the date of the notification, and retain a record of the purchasers for 15 years after delivery of design which is the subject of the design certification rule or service associated with the design.
  • Applicants for or holders of a standard design approval under subpart E of part 52 of this chapter and others providing a design which is the subject of a design approval shall retain any notifications sent to purchasers and affected licensees for a minimum of 5 years after the date of the notification, and retain a record of the purchasers for 15 years after delivery of the design which is the subject of the design approval or service associated with the design.

What is covered during NUPIC Joint Utilities Audits Verification of Record Requirements continued

  • Each individual, corporation, partnership, dedicating entity, or other entity subject to the regulations in this part shall permit the Commission the opportunity to inspect records pertaining to basic components that relate to the identification and evaluation of deviations, and the reporting of defects and failures to comply, including (but not limited to) any advice given to purchasers or licensees on the placement, erection, installation, operation, maintenance, modification, or inspection of a basic component.

What is covered during NUPIC Joint Utilities Audits

  • Verification that there is a connection between the 10CFR Part 21 process and nonconformance program and verification that there is a connection between the Part 21 process and corrective action process.

Part 21 Reporting Avenues Interim Report - addressed to the NRC's Document Control Desk, and sent by mail to the U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; by hand delivery to the NRC's offices at 11555 Rockville Pike, Rockville, Maryland; or, where practicable, by electronic submission, for example, Electronic Information Exchange, or CD-ROM.

Initial Notification - Facsimile which is the preferred method of notification, to the NRC Operations Center at (301) 816 - 5151 or by telephone at (301) 816 - 5100 within two days following receipt of information by the director or responsible corporate on the identification of a defect or a failure to comply. Verification that the facsimile has been received should be made by calling the NRC Operations Center. This paragraph does not apply to interim reports described in § 21.21(a)(2).

Written Communications and reports Written communications and reports concerning the regulations in this part must be addressed to the NRC's Document Control Desk, and sent by mail to the U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; by hand delivery to the NRC's offices at 11555 Rockville Pike, Rockville, Maryland; or, where practicable, by electronic submission, for example, Electronic Information Exchange, or CD-ROM.

Part 21 Reporting Avenues Electronic submissions Electronic submissions must be made in a manner that enables the NRC to receive, read, authenticate, distribute, and archive the submission, and process and retrieve it a single page at a time. Detailed guidance on making electronic submissions can be obtained by visiting the NRCs Web site at http://www.nrc.gov/site-help/e-submittals.html; by e-mail to MSHD.Resource@nrc.gov; or by writing the Office of Information Services, U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001. The guidance discusses, among other topics, the formats the NRC can accept, the use of electronic signatures, and the treatment of nonpublic information. In the case of a licensee or permit holder, a copy of the communication must also be sent to the appropriate Regional Administrator at the address specified in appendix D to part 20 of this chapter.

Common NUPIC Joint Utilities Audit Findings

  • Suppliers procedures do not address the applicable requirements of 10CFR Part 21 including:

- Discovery of a Deviation

- Interim Reports

- Customer notification when supplier is not capable of performing the evaluation of deviations

- Performing evaluations of deviations

- Reporting

  • Failing to perform evaluation of deviations to determine if they represent defects as soon as practical.

Common NUPIC Joint Utilities Audit Findings

  • Failing to meet the record retention requirements of 10CFR Part 21
  • Not entering Part 21 Incidents into Corrective Action Program
  • Suppliers of basic components making blanket statement that they do not have the capability to evaluate deviations

Tidbits Electronic/Computer Postings are allowed for remote workers Users can register for Part 21 Subscription for updates Access NRC Part 21 Inspection Procedure and inspection reports can be obtained at:

https://www.nrc.gov/reactors/new-reactors/how-we-regulate/oversight/quality-assurance.html

Questions ???

Resources and References

  • NRC Inspection Procedure IP 36100, Inspection of 10 CFR Part 21 and Programs for Reporting Defects and Noncompliance
  • NUPIC Joint Utilities Audit Checklist, Revision 22