WBL-24-028, Emergency Plan Implementing Procedure Revisions
| ML24184B978 | |
| Person / Time | |
|---|---|
| Site: | Watts Bar |
| Issue date: | 07/02/2024 |
| From: | Reneau W Tennessee Valley Authority |
| To: | Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, Document Control Desk |
| References | |
| WBL-24-028 | |
| Download: ML24184B978 (1) | |
Text
Post Office Box 2000, Spring City, Tennessee 37381 WBL-24-028 July 2, 2024 10 CFR 50.54(q)(5) 10 CFR 72.44(f)
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Units 1 and 2 Facility Operating License Nos. NPF-90 and NPF-96 NRC Docket Nos. 50-390, 50-391, and 72-1048
Subject:
Emergency Plan Implementing Procedure Revisions Pursuant to Title 10, Code of Federal Regulations (10 CFR) 50.54(q)(5), and 10 CFR 72.44(f),
Tennessee Valley Authority (TVA) is submitting a description of changes to the Watts Bar Nuclear Plant (WBN) Radiological Emergency Plan (REP). The affected documents are the WBN Emergency Plan Implementing Procedures (EPIP) listed below:
EPIP Revision Title Effective Date 5
64 General Emergency 06/04/2024 Description of Changes EPIP-5 Revision 64 enacted the following changes:
Revised a procedure attachment guidance for notification software, Vaporstream, setup instructions.
1\\14 TENNESSEE VALLEY AUTHORITY
U.S. Nuclear Regulatory Commission WBL-24-028 Page2 July 3, 2024 The aforementioned changes were evaluated in accordance with 10 CFR 50.54(q)(3) and 10 CFR 72.44(f). TVA determined that the changes did not reduce the effectiveness of the WBN REP. The WBN REP, as revised, continues to meet the requirements in Appendix E to 10 CFR 50 and the planning standards of 10 CFR 50.47(b).
There are no new regulatory commitments in this letter. Please direct all questions concerning this matter to Michael White, Emergency Preparedness Manager, at mrwhite@tva.gov.
Respectfully,
~
Site Vice President Watts Bar Nuclear Plant cc:
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Watts Bar Nuclear Plant NRC Project Manager - Watts Bar Nuclear Plant NRC Director - Division of Fuel Management, NMSS