OIG-20-A-11, Status of Recommendations: Audit of the NRCs Nuclear Power Plant Surveillance Test Inspection Program Dated August 31, 2021
ML21243A309 | |
Person / Time | |
---|---|
Issue date: | 08/31/2021 |
From: | Rivera E NRC/OIG/AIGA |
To: | Margaret Doane NRC/EDO |
References | |
OIG-20-A-11 | |
Download: ML21243A309 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
OFFICE OF THE INSPECTOR GENERAL August 31, 2021
MEMORANDUM TO: Margaret M. Doane Executive Director for Operations
FROM: Eric Rivera /RA/
Acting Assistant Inspector General for Audit
SUBJECT:
STATUS OF RECOMMENDATIONS: AUDIT OF THE NRCS NUCLEAR POWER PLANT SURVEILLANCE TEST INSPECTION PROGRAM (OIG-20-A-11)
REFERENCE:
DIRECTOR, OFFICE OF NUCLEAR REACTOR REGULATION (NRR), MEMORANDUM DATED JUNE 1, 2021
Attached is the Office of the Inspector Generals (OIG) analysis and status of recommendations as discussed in the agencys response dated June 1, 2021. Based on this response, recommendations one and two are closed. All recommendations from this audit are now closed.
If you have questions or concerns, please call me at (301) 415-5915, or Paul Rades, Team Leader, at (301) 415-6228.
Attachment:
As stated
cc: C. Haney, OEDO S. Miotla, OEDO J. Jolicoeur, OEDO S. Mroz, OEDO RidsEdoMailCenter Resource OIG Liaison Resource EDO_ACS Distribution
Audit Report AUDIT OF THE NRC'S NUCLEAR POWER PLANT SURVEILLANCE TEST INSPECTION PROGRAM OIG-20-A-11 Status of Recommendations
Recommendation 1: Implement policies and procedures to periodically review the completeness and accuracy of data generated from the Replacement Reactor Program System (RRPS).
Agency Response Dated June 1, 2021: On July 16, 2020, On July 16, 2020, the staff agreed with the recommendation and proposed to enhance the non-publicly available Inspection Procedure (IP) Lead Desktop Guide referenced in Section 05.02 of Inspection Manual Chapter (IMC) 0307, Appendix B, Reactor Oversight Process Self-Assessment Baseline Inspection Program Monitoring and Comprehensive Review (ADAMS Accession No. ML19289A965). The proposal was solely focused on data generated from RRPS Report IP 28, Inspection Procedure Analysis.
However, subsequent to this decision, and as the lead for IMC 0307, NRR decided that the IP Lead Desktop Guide would be retired in 2021 and more formally incorporated into the body of IMC 0307. Therefore, to better address the recommendation from OIG, and not limit the focus to only Report IP 28, the staff decided to modify the IMC that governs RRPS. Specifically, the staff decided to augment NRRs Division of Reactor Oversight (DRO) Responsibilities and Authorities in IMC 0306, Planning Scheduling, Tracking, and Reporting of the Reactor Oversight Process (ROP) (ADAMS Accession No. ML19191A101) to include periodic sampling of the various RRPS report outputs for completeness and accuracy. The findings from the sampling will be reported to DRO management will be reported to DRO management.
The staff has completed all actions in response to the OIGs audit and believes that the completed actions for Recommendation 1 are responsive to OIGs analysis.
Specifically, on February 24, 2021, Inspection Manual Audit Report AUDIT OF THE NRC'S NUCLEAR POWER PLANT SURVEILLANCE TEST INSPECTION PROGRAM OIG-20-A-11 Status of Recommendations
Recommendation 1 (cont.):
chapter (IMC) 0306, Planning, Scheduling, Tracking and Reporting of the Reactor Oversight Process, was revised (ADAMS Accession No. ML20302A345) and added an action to, Periodically sample data found in various standard RRPS reports (such as IR 8, Baseline Inspection Complete, and IR 10, ROP Sample Completion by Inspection Report) for accuracy, and provide results to DRO management.
CONTACT: Eric Duncan, NRR/DRO (931) 248-0074
OIG Analysis: The OIG reviewed the updated responsibilities in IMC 0306 and determined that these actions meet the intent of this recommendation. This recommendation is now closed.
Status: Closed
Audit Report AUDIT OF THE NRC'S NUCLEAR POWER PLANT SURVEILLANCE TEST INSPECTION PROGRAM OIG-20-A-11 Status of Recommendations
Recommendation 2: Periodically test data generated from the Replacement Reactor Program System for completeness and accuracy.
Agency Response Dated June 1, 2021: On July 16, 2020, the staff agreed with the recommendation and proposed to develop an Acceptance Testing Guide that would have been referenced in IMC 0306, to assist the Nuclear Regulatory Commission staff in the independent verification and validation process of RRPS modifications to ensure accuracy of RRPS data generation. However, in lieu of a single generic testing guide, the staff, supported by the RRPS program contractors, developed non-publicly available RRPS report guides that detailed the assumptions and logic used to derive the RRPS reports. These guides have and will assist the periodic sampling of RRPS report outputs, as stated in response to Recommendation 1. The findings from the sampling will be periodically reported to DRO management. This action is now considered complete with the completion of the action associated with Recommendation 1.
OIG Analysis: The OIG reviewed IMC 0306, non-publicly available RRPS report guides, and data test results from staff showing that they test RRPS data periodically. The OIG determined that these actions meet the intent of the recommendation. This recommendation is now closed.
Status: Closed