MONTHYEARRS-24-104, Nuclear Radiological Emergency Plan Document Revision2024-11-0101 November 2024 Nuclear Radiological Emergency Plan Document Revision RS-24-098, Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality2024-10-23023 October 2024 Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality ML24297A2702024-10-23023 October 2024 Notification of NRC Baseline Inspection and Request for Information: Inspection Report 05000455/2025002 ML24291A0012024-10-17017 October 2024 Submittal of Core Operating Limits Report, Cycle 25 RS-24-095, Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals2024-10-10010 October 2024 Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24281A1502024-10-0707 October 2024 Request for Information for NRC Commercial Grade Dedication Inspection Report 05000454/2025010 and 05000455/2025010 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A1272024-09-23023 September 2024 – Request for Additional Information (EPID 2023-LLA-0136) - Non-Proprietary BYRON 2024-0046, Cycle 27 Core Operating Limits Report2024-09-19019 September 2024 Cycle 27 Core Operating Limits Report RS-24-088, Relief Requests Associated with the Fifth Inservice Inspection Interval2024-09-13013 September 2024 Relief Requests Associated with the Fifth Inservice Inspection Interval IR 05000456/20240112024-09-12012 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000456/2024011 and 05000457/2024011 ML24164A0032024-09-10010 September 2024 Issuance of Amendment Nos. 235 and 235 Revision of Technical Specifications for the Ultimate Heat Sink ML24250A1182024-09-0606 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information 05000454/LER-2024-001, Both Trains of Control Room Ventilation Temperature Control System Inoperable2024-09-0505 September 2024 Both Trains of Control Room Ventilation Temperature Control System Inoperable ML24227A0522024-08-29029 August 2024 Audit Plan for LAR to Remove ATWS Mtc Limit IR 05000456/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2024005 and 05000457/2024005) IR 05000454/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Byron Station, Units 1 and 2 (Report 05000455/2024005 and 05000454/2024005) ML24225A1112024-08-13013 August 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000454/20240112024-08-0808 August 2024 Phase 2 Post- Approval License Renewal Report 05000454/2024011 IR 05000456/20240022024-08-0808 August 2024 Integrated Inspection Report 05000456/2024002 and 05000457/2024002 ML24172A1252024-07-26026 July 2024 Environmental Assessment and Finding of No Significant Impact Related to a Requested Increase in Ultimate Heat Sink Temperature (EPID L-2024-LLA-0075) - Transmittal Letter IR 05000454/20240022024-07-26026 July 2024 Integrated Inspection Report 05000454/2024002 and 05000455/2024002, and Exercise of Enforcement Discretion ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) RS-24-064, Nuclear Radiological Emergency Plan Document Revisions2024-06-28028 June 2024 Nuclear Radiological Emergency Plan Document Revisions RS-24-066, Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller2024-06-25025 June 2024 Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller ML24163A3922024-06-25025 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, & Opportunity for a Hearing (EPID L-2024-LLA-0075)- Letter ML24170A7652024-06-19019 June 2024 Confirmation of Initial License Examination RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24164A2132024-06-13013 June 2024 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Braidwood Nuclear Plant RS-24-057, License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink2024-06-0404 June 2024 License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink IR 05000456/20240102024-05-31031 May 2024 License Renewal Phase 1 Report 05000456/2024010 RS-24-044, License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed2024-05-28028 May 2024 License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed RS-24-043, Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications2024-05-24024 May 2024 Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report BYRON 2024-0031, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-05-16016 May 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation ML24136A0132024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report ML24136A2452024-05-15015 May 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000457/2024004 IR 05000454/20240012024-05-10010 May 2024 Integrated Inspection Report 05000454/2024001; 05000455/2024001 and 07200068/2024001 BYRON 2024-0028, Annual Radiological Environmental Operating Report (AREOR)2024-05-0909 May 2024 Annual Radiological Environmental Operating Report (AREOR) ML24128A1212024-05-0707 May 2024 Response to Braidwood and Dresden FOF Dates Change Request (2025) BYRON 2024-0022, 2023 Regulatory Commitment Change Summary Report2024-05-0202 May 2024 2023 Regulatory Commitment Change Summary Report ML24122A6522024-05-0101 May 2024 Submittal of 2023 Annual Radioactive Effluent Release Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000456/20243012024-04-29029 April 2024 NRC Initial License Examination Report 05000456/2024301; 05000457/2024301 ML24116A0052024-04-25025 April 2024 Transmittal of Braidwood Station, Unit 1, Core Operating Limits Report, Braidwood Unit 1 Cycle 25 ML24116A1192024-04-25025 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) 2024-09-06
[Table view] |
Text
Date: 1/17/2024
To: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 Fax Number (301) 816-5151
10CFR Part 21 Final Notification: P21 -12182023-FN, Rev. 0
Subject:
Defect with Detroit Diesel/MTU Fuel Injectors P /N R5229660 Cat ID# 0001390618
Pursuant to §10CFR 21.21 (d)(3)(ii), Paragon Energy Solutions, LLC is providing this final notification of a potential defect associated with the Auxiliary Feedwater Pump Diesel Engine fuel injectors supplied to Constellation.This condition, if left uncorrected, could potentially cause a substantial safety hazard.
The following information is required per §10CFR 21.21 (d) (4).
(i) Name and address of the individual or individuals informing the Commission.
Richard Knott, Vice President Quality Assurance Paragon Energy Solutions, LLC 7410 Pebble Drive Ft. Worth, TX 76118
(ii) Identification of the facility, activity, or the basic component supplied for such facility or such activity within the United States which fails to comply or contains a defect.
Plant Client PO# Project Serial # QTY Supplied Number Braidwood 01389979 PR23000356 2302008*, 16 2304001 thru 2304015 Byron 01384756 PR23000189 2302001 thru 2302016* 16
- S/N 2302008 was refurbished under both 01384756 and 0138979 Constellation purchase orders, but was ultimately installed at Braidwood
The Detroit Diesel/MTU Fuel Injectors P/N R5229660 Cat ID# 0001390618 were supplied as indicated in the table above.
Paragon Energy Solutions 7410 Pebble Drive*Fort Worth, Texas*76118 817-284-0077 *Fax 817-590-0484
(iii) Identification of the firm constructing or supplying the basic component which fails to comply or contains a defect.
Components were originallysupplied by:
Paragon Energy Solutions, LLC 7410 Pebble Drive, Fort Worth Texas 76118
(iv) Nature of defect or failure to comply and the safety hazard which is created or could be created by such defect or failure to comply.
On November 17, 2023, Constellation provided Paragon with Constellation/Braidwood Root Cause Report associated with Issue Report # 4703982 and the associated failure analysis report documenting potential defects with some fuel injectors (Detroit Diesel/MTU Fuel Injectors PN R5229660 Cat ID# 0001390618) supplied to Braidwood. The defects identified included degraded sealing surfaces on some injectors at the fuel line connection points and a disintegrated body O -ring which allowed fuel oil to leak into the diesel lubricating oil system.
The injectors were provided to Paragon for refurbishment in accordance with the customer purchase orders referenced in section (ii) above with included scope to employ the use of the OEM Service Manual. The root cause investigation identified lack of clarity and detail in Paragons mechanical repair process procedures when using OEM or other third-party vendors.
This led the project team to incorrectly determine the procedure did not apply to the scope of these projects. While the OEM Service Manual was u sed to develop the Paragon repair and inspection procedures conducted at the third-party vendor, the procedures were only focused on critical parts replacement and inspection. A detailed as found condition inspection was not specified which would have identified the deficiencies in the sealing surfaces as a condition requiring repair in accordance with the acceptance criteria contained in the OEM Service Manual. Testing was focused on validating spray nozzle pressure criteria and did not consider any leakage criteria at the fuel line connections or body sealing surface (sealed via O -ring). The failure to identify and repair these deficiencies on the affected injectors allowed excessive fuel oil leakage, resulting in diesel lubricating oil system contamination levels above specified limits.
On December 18, 2023, Paragon concluded our evaluation which determined this condition, if left uncorrected, could contribute to a substantial safety hazard and is reportable in accordance with 10CFR Part 21.
(v) The date on which the information of such defect or failure to comply was obtained.
12/18/2023
P21-12182023-FN, Rev. 0 (vi) In the case of a basic component which contains a defect or fails to comply, the number and location of these components in use at, supplied for being supplied for, or may be supplied for, manufactured or being manufactured for one or more facilities or activities subject to the regulations in this part.
See section (ii) above.
(vii) The corrective action which has been, is being, or will be taken; the name of the individual or organization responsible for the action; and the length of time that has been or will be taken to complete the action.
- 1) Paragon has issued a return material authorization to Braidwood and has received all affected injectors supplied to them as stated above. - Complete
- 2) Paragon has informed Byron and recommended they monitor the affected diesel engine for symptoms of fuel oil contamination in the diesel lubricating oil per plant procedures. Paragon has not been notified of any similar problems associated with the injectors supplied to Byron as indicated above. - Complete
- 3) Paragon has provided awareness briefings to Mechanical Engineering and Quality Engineering teams on the issues associated with the refurbishment of these injectors. -
Complete
- 4) A detailed review of in process and past mechanical repairs identified no repair plan issues or gaps, and each was reviewed and conformed to the customer PO requirements. - Complete
- 5) Paragon has investigated other areas of our core business (i.e., I&C and Electrical component repair processes) for similar weaknesses and determined the procedures governing these processes are very robust and adequately control the use of OEM or other third-party vendors performing repair services. - Complete
- 6) Mechanical Engineering will revise programmatic procedures to improve control over mechanical repair/refurbishment activities of safety related customer supplied items including detailed guidance necessary when using third party vendors in support of the process. -ECD 2/ 17/2024
- 7) Mechanical Engineering will conduct training on the revised procedure from action 4 above.
-ECD 2/28/2024
P21-12182023-FN, Rev. 0 (viii) Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees.
It is recommended that Constellation Byron continue monitoring lubricating oil samples from the diesel engine having the affected injectors installed per plant procedures.
Sincerely,
Richard Knott Vice President Quality Assurance Paragon Energy Solutions LLC 817-284-0077 rknott@paragones.com