ML24155A061

From kanterella
Revision as of 18:34, 28 August 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Kairos Power LLC, Presentation Materials for the Kairos Power Meeting with the Nuclear Regulatory Commission on the Hermes Foundation Design
ML24155A061
Person / Time
Site: Hermes, 99902069  File:Kairos Power icon.png
Issue date: 06/03/2024
From: Hastings P
Kairos Power
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML24155A060 List:
References
KP-NRC-2405-009
Download: ML24155A061 (1)


Text

KP-NRC-2405- 009

June 3, 2024 Docket No. 50- 7513

US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Kairos Power LLC Presentation Materials for the Kairos Power Meeting with the Nuclear Regulatory Commission on the Hermes Foundation Design

This letter transmits the presentation slides for th e June 5, 2024, meeting to discuss foundation design for the Kairos Power Fluoride Salt-Cooled, High Temperature Non -Power Reactor (Hermes). Enclosure 1 provides the non-proprietary slides. Kairos Power authorizes the Nuclear Regulatory Commission to reproduce and distribute the submitted content, as necessary, to support the conduct of their regulatory responsibilities.

If you have any questions or need any additional information, please contact Marty Bryan at bryan@kairospower.com or (704) 317- 7278, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226.

Sincerely,

Peter Hastings, PE Vice President, Regulatory Affairs and Quality

Enclosure:

1) Presentation Slides for the June 5, 2024, Hermes Foundation Design Meeting (Non-Proprietary)

xc (w/enclosure):

Joshua Borromeo, Chief, NRR Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR Advanced Reactor and Licensing Branch Samuel Cuadrado de Jesus, Project Manager, NRR Advanced Reactor Licensing Branch Matthew Hiser, Project Manager, NRR Advanced Reactor Licensing Branch Cayetano Santos, Project Manager, NRR Advanced Reactor Licensing Branch

Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211