EPID:L-2023-LLA-0122
From kanterella
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
EPID - L-2023-LLA-0122, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology (Approved, Closed) 30 August 2023 - 3 June 2024 | |
|---|---|
Request for: - License Amendment Approved, Closed | |
Initiation
| |
| From: | |
MONTHYEARRA-22-0290, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology2023-08-30030 August 2023
[table view]Title: License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology ML23262B4502023-09-19019 September 2023 Title: NRR E-mail Capture - H. B. Robinson Steam Electric Plant, Unit 2 - Acceptance of License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures Based on Leak-Before-Break Methodology ML24002A7382024-01-0202 January 2024 Title: NRR E-mail Capture - Request for Additional Information Regarding Dukes August 20, 2023, License Amendment Request for Robinson, Unit 2 ML24033A0592024-02-0202 February 2024 Title: Response to Request for Additional Information License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology ML24114A0152024-06-0303 June 2024 Title: Unit 2 – Issuance of Amendment No. 279 Regarding Application of Leak-Before-Break Methodology for Auxiliary Reactor Coolant System Piping 2024-01-02 | |