Interim Deficiency Rept Re Vendor Installed HVAC Sys. Initially Reported on 830301.Evaluation Continuing. Completion of Evaluation Anticipated by 830516
ML20072R006
Person / Time
Site: Comanche Peak  
Issue date: 03/29/1983
From: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, TXX-3651, NUDOCS 8304050406
Download: ML20072R006 (1)


Text

TEXAS UTILITIES GENEIMTING COMIRNY 2f M H littY \N Tt1% Ett 11\f.l W. TEX W 7.TJot4p G)

R. J. GARY "lM'L:::.""L'?

March 29, 1983 TXX-3651 G @ }l ')\\lll V %

7 Mr. G. L. Madsen, Chief j\i l lE . \ ,

Reactor Projects Branch 1 U. S. Nuclear Regulatory Commission JJ Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket Nos.: 50-445 Arlington, TX 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION VENDOR INSTALLED HVAC SYSTEM SDAR-106 CP-83-06 FILE NO.: 10110

Dear Mr. Madsen:

On March 1, 1983, we verbally informed your Mr. R. G. Taylor of a deficiency identified regarding HVAC hangers which were fabricated at variance with design documents.

We are continuing our evaluation and anticipate completion of our evaluation by May 16, 1983.

Very truly yours, RJG:eaq cc: NRC Region IV - (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, DC 20555 4

8304050406 830329 PDR ADDCK 05000445 S PDR