TXX-4139, Interim Deficiency Rept SDAR-131 Re Defective Lug Crimps on Field Routed Cable.Equipment Supplied by Reliance Will Be Inspected for Proper Terminal & Connector Pin Crimping. Equipment Rework Will Be Completed by 840531

From kanterella
Revision as of 14:17, 25 July 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Interim Deficiency Rept SDAR-131 Re Defective Lug Crimps on Field Routed Cable.Equipment Supplied by Reliance Will Be Inspected for Proper Terminal & Connector Pin Crimping. Equipment Rework Will Be Completed by 840531
ML20087P689
Person / Time
Site: Comanche Peak  
Issue date: 03/29/1984
From: Clements B
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
SDAR-131, TXX-4139, NUDOCS 8404090280
Download: ML20087P689 (2)


Text

.

4

r. .

TEXAS UTILITIES GENERATING COMPANY MKYWAY TOWEN

  • 400 NORTH OI.IVE MTHEET. t..II. Mt
  • DAI.LAN. TEXAM 73208

- mca ens osart a one ficoes March 29,1984 TXX-4139 Mr. E.H. Johnson,' Chief Reactor Project Branch 1 U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement-

. 611 Ryan Plaza Drive, Suite 1000 Docket Nos.: 50-445 o

Arlington, TX 76012 50-446 3

COMANCHE PEAK STEAM ELECTRIC STATION 9IM@M]\V/M

'Yg DEFICIENT LUG CRIMPING ~

l QA FILE: CP-84-07, SDAR-131 '

APR - 219M FILE N0.: 10110 g

Dear Mr. Johnson:

In accordance with-10CFR50.55(e), we are submitting the enclosed report of actions taken to-correct a deficiency regarding deficient lug crimping.

Supporting documentation is available at the.CPSES site for your Inspectors review.

Very truly yours, p - B.R. Clements I

BRC:mm

' cc: ~ NRC' Region IV - (0 + 1 copy)

- . Director, Inspection. & Enforcement (15 copies)

U.S. Nuclear Regulatory Commission Washington, DC 20555 a

r. 8404090280 840329 o .PDR ADOCK 05000445 S PDR.

. . . . - - . - . . . . . . . ~ . , ,

f~L-97ii e .

N .

i STXX-.4139 ,

March 29, 1984 3,gc.

s x .

b' -

ATTACHMENT DEFICIENT LUG CRIMPING

-  : Description -

During routine 1 inspection by quality-control,- several site nonconformance Jreports:have been issued due to deficient lug crimps on field routed cable.

In the process of assessing the concern, additional lugs were. observed to

. be deficient in the termination cabinets. These terminations were provided 1by thelsupplier.f(Reliance).

Reinspection by supplier quality inspection personnel identified the follow-ing nonconforming conditions in terminal and connector pin crimps:

a): Insufficient insertion into the terminal due to inadequate 4

stripping of the conductor insulation; '

^

- b)' Insufficient insertion of the conductor / terminal into the 4 crimping tool to allow full crimping; c) Excessive insulation removal on connector. pins; and, s . d)oInadequate: crimps which could be pulled loose with minimal

' force.

2 .Duelto extent of the concern in the termination cabinets, the reinspection

-" -effort was expanded.to include more Class 1E equipment provided by the sup-plier. Similar concerns were observed for the control boards and handswitches, the Unit 1-alternate shutdown panel, and assorted vertical _ panels and local HVAC' control _ panels. The Class -1E. equipment examined performs an interface cfor. control and operation' of the; plant.

Subse'quent. engineering evaluations have concluded lug crimping activities

-performed!in the field do not_ adversely impact plant safety. The scope of this conceETslimited to vendor crimping only.

Safety Implication-

~In the event theLvendor termina11and pin crimping concerns had remained

~

-undetected, the reliability of the Class 1E equipment' could not be assured .i 1 ~ '

during plant operation.-

Corrective-Action AlllClassf1E. equipment provided by Reliance on the jobsite will be in-a -spected for proper terminal and connector' pin crimping. Deficiencies will O^i ~

ibeidocumented and reworked per; the' vendorf.s_ program for control'of non -

conforming items; Efforts'for Unit.1cand 2 equipment should be completed

" by March 30,.1984 and-May.31, 1984 respectively.

~ During. routine rele'se~ a inspections at the vendors facility, _TUGCO: QA personnel

!williprovide additionalLemphasis on the terminal and' pin crimping in termination JcabinetsLwhich 'have .not.yet been -shipped to CPSES.

^