PY-CEI-NRR-0771, Forwards Reactor Internals Vibration Testing at Perry Unit 1, Preliminary Rept,Per Reg Guide 1.20

From kanterella
Revision as of 19:54, 22 July 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Reactor Internals Vibration Testing at Perry Unit 1, Preliminary Rept,Per Reg Guide 1.20
ML20148H536
Person / Time
Site: Perry 
Issue date: 01/15/1988
From: Kaplan A
CLEVELAND ELECTRIC ILLUMINATING CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20148H541 List:
References
RTR-REGGD-01.020, RTR-REGGD-1.020 PY-CEI-NRR-0771, PY-CEI-NRR-771, NUDOCS 8801270248
Download: ML20148H536 (1)


Text

..

> THE CLEVELAND ELECTRIC ILLUMIN ATING COMPANY PO DOX 97 e PEARY. OHIO 44081 e TELEPHONE (216) 259 3737 e ADDR E sS - 10 CENTER ROAD Serving The Best Location in the Nation PERRY NUCLEAR POWER PLANT Al Kaplan VICE PRESIDENT NUCLEAR GROUP Janua ry 15, 1988 PY-CEI/NRR-0771 L Doc ume nt Control Desk U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Perry Nuclear Power Plant Docket No. 50-440 Preliminary Vibration Analysis Report

Dear Sir:

Attached is the Preliminary Vibration Analysis Report for Perry Unit 1. This report is submitted in accordance with Regulatory Guide 1.20, "Comprehensive Vibration Assessment Program for Reactor Internals during Preoperational and Initial Startup Testing".

Please feel free to contact me if you have any questions.

Very truly yours ,

Al Kaplan Vice President Nuclear Group AK: c ab Attachment cc: T. Colburn K. Connaughton USNRC Region III 8801270248 880115 PDR ADOCK 05000440 1 P PDR I

lL l