Sheet 1 of 1 NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS WATERFORD 3 NOVEMBER 1985 The unit started the month at 100% power. On November 4 at 0416, the generator was taken off line to repair damage to the main generator exciter. The reactor remained critical at approximately 20% power during the outage. On November 4 at 1440, the generator was back on line. On November 5. the unit teached 100%
power. The unit continued operation at approximately 100% power for the remainder of the month.
SBA2qggg gghtygg2 a
ze x+
, 'l'
PRESSURIZER SAFETY VALVE FAILURES AND CllALLENGES WATERFORD 3 During the month of November 1985, there were no pressurizer safety valve failures or challenges, k.___-_______________ _ _ _ . _ _ _ - - _ . _
1 -
OPERATIhG DATA REPORT UNIT NAME: WATERFORD 3 CITY / STATE: KILLONA/LA DATE: DECEMBER 1985 OPERATING STATUS
- 1. Docket: 50-382 Notes (1) Maximum Dependable
- 2. Reporting Period: NOVEMBER 1985 Capacity (Gross and Net MWe) will be
- 3. Utility
Contact:
GEORGE MILLER [*"[g*gf# "
Phone. Number: (504) 467-8211
- 4. Licensed Thermal Power (HWt): 3390
- 5. Nameplate Rating (Gross Mwe): '1153
- 6. Design Electrical Rating (Net MWe): 1104
- 7. Maximum Dependable Capacity (Gross MWe): (Note 1)
- 8. Maximum Dependable Capacity (Net MWe): (Note 1)
- 9. If Changes Occur in Capacity Ratings- (Items Number 4 Through 8) Since Last Report, Give Reasons: N/A
- 10. Power Level To Which Restricted, if Any (Net MWe): NONE
- 11. Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative
- 12. Hours In Reporting Period 720.0 1633.0 1633.0
- 13. Number Of Hours Reactor Was Critical 720.0 __1406.6 1406.6
- 14. Reactor Reserve Shutdown Hours 15 Hours Generator On-Line 709.6 1350.5 1350.5
- 16. Unit Reserve Shutdown Hours . _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _
+ .
OPERATING DATA REPORT (Continued)
This Month Yr.-to-Date Cumulative
- 17. Gross Thermal Energy Generated (MWH) 2,319,818 4,218,964 4,218,964
- 18. Gross Electrical Energy Generated (MWH) 781,120 1,419,580 1,419,580
- 19. Net Electrical Energy Generated (MWH) 748,338 1,354,459 1,354,459
- 20. Unit Service Factor 98.6 02.7 82.7
- 21. Unit Availability Factor 98.6 82.7 82.7
- 22. Unit Capacity Factor (Using MDC Net) (NOTE 1) (NOTE 1) (NOTE 1)
- 23. Unit Capacity Factor (Using DER Net) 94.1 75.1 75.1
- 24. Unit Forced Outage Rate 0.0 16.8 16.8
- 25. Unit Forced Outage Hours 0.0 272.1 272.1
- 26. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Unit shutdown scheduled in March 1986 to perform Technical Specification surveillances requiring a unit shutdown, duration: approximately 28 days.
- 27. If Shut Down At End of Report Period, Estimated Date Of Startup:
- 28. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 3/4/85 INITIAL ELECTRICITY 3/18/85 COMMERCIAL OPERATION 9/24/85
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-382 UNIT WATERFORD 3 DATE DECEMBER 1985 COMPLETED BY GEORGE MILLER TELEPHONE 504-467-8211 l
MONTH NOVEMBER 1985 l
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1097 17 1080 2 1099 18 1083 3 1075 19. 1099
'4 100 20 1097 5 665 21 1093 6 1091 22 1085 7 1097 23 1081 8 1053 24 1084 9 1086 25 1083 10 1092 26 1061 1
11 1092 27 1061 12 1081 28 1084 l
l 13 1097 29 1093
! 14 1096 30 1091 15 1094 31 16 '1091 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the-reporting month. Compute to the nearest whole megawatt.
i (9/77) l l
i
- - - _ _ _ _ - - . - - - - _ . _ - _ _ _ . _ _ . - _ _ _ . - - _ . - _ - - _ _ _ _ _ _ - - - _ . . - - - - . _ . _ _ _ _ , . _ . - - _ _ _ - - - - _ _ . . - - _ . - _ _ - . - _ - - - - _ . _ _ - _ _ . - - - - _ . u
[
UNIT SHUTDOWNS AND POWER REDUCTIONS -
REPORT FOR NOVEMBER 1985
- l l DOCKET NO 50-382 l UNIT NAME WATERFORD 3 DATE DECEMBER 1985 COMPLETED BY GEORGE MILLER ~~
TELEPHONE 504-467-8211 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No. Date Type l (HOURS) REASON 2 Down Reactor 3 Report # Code 4 Codes Prevent Recurrence i 85-022 851104 S 10.4 B 9 N/A TL FU The generator was taken off line to repair damage to the main generator exciter. The reactor remained critical at approximately 20% power during the outage.
l l
l l
l 1 2 3 F: Forced Reason: Method S: Scheduled A-Equipment Failure (Explain) 1-Manual l B-Maintenance or Test 2-Manual Scram.
C-Refueling 3-Automatic Scram.
D-Regulatory Restriction 4-Continuation 4 j E-Operator Training & 5-Load Reduction IEEE Std. 805-1984 License Examination 9-Other 5 F-Administrative IEEE Std. 803A-1983 G-Operational Error (Explain)
H-Other (Explain)
__ J
e.
- s. *%
Louisiama ,4 oe<- e~oe.mee.
P O W E R & L I G H T f New onteAs,a toVIStANA G -e eo eeO.
70174-8000 G [504)368-934S
$N$IYS December 13, 1985 W3P85-3295 A4.05 QA Mr. Ronald M. Scroggins Controller and Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Mr. Scroggins:
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 MONTHLY OPERATING REPORT Enclosed is the subject monthly report which covers the operating statistics for the month of November 1985. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Very truly yours.
Y b K.W. Cook Nuclear Support & Licensing Manager KWC:GEW:sms Enclosure cc: R.D. Martin, NRC Region IV NRC, Director, Office of I&E G.W. Knighton, NRC-NRR NRC Resident Inspectors Office INPO Records Center (J.T. Wheelock)
B.W. Churchill W.M. Stevenson M ht h