TXX-4916, Interim Deficiency Rept CP-86-48 Re Adequacy of Nonconformance Dispositions.Initially Reported on 860616. Assessments Re Adequacy of Nonconformance Dispositions Underway.Next Rept Will Be Submitted by 860829
| ML20212B233 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 07/16/1986 |
| From: | Counsil W, Keeley G TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| CP-86-48, TXX-4916, NUDOCS 8608060269 | |
| Download: ML20212B233 (1) | |
Text
,
Log # TXX-4916 File # 10110 10110.1 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWEM . 400 NORTH OLIVE NTREET. L.H. El . DAIJ.Afs. TEXAM 78308 July 16, 1986
.7A%7Aff.f.".*.h Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects fi ,Ih ]{%)K I l M 2 l l986 U. S. Nuclear Regulatory Commission [i 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012 L
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 ADEQUACY OF NONCONFORMANCE DISPOSITIONS SDAR: CP-86-48 (INTERIM REPORT)
Dear Mr. Johnson:
On June 16, 1986, we verbally notified your Mr. C. Hale of a deficiency involving the adequacy of nonconformance dispositions. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e).
The specific issue involves the revision of the disposition of a nonconformance report (NCR). Assessments regarding the adequacy of NCR dispositions are currently underway. We are continuing our evaluation and anticipate submitting our next report by August 29, 1986.
Very truly yours, Wikib W. G. Co sil By: /
G. S. Keeley -
Manager, Nuclear censing JCH/arh c - NRC Region IV (0 + 1 Copy)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D.C. 20555 8608060269 860716 PDR ADOCK 05000445 S PDR A DIY1510N OF TEXAN UTILITIEN ELECTitic(MMPANY
@-7 SP, . fez 7 .
. . . -.