TXX-6136, Interim Deficiency Rept CP-86-66 Re Vertical Rebar Exposed During Insp of Core Bores in Auxiliary Bldg That Did Not Satisfy Criteria of Code Defined Lap Splice.Initially Reported on 860926.Next Rept Will Be Submitted by 870218
| ML20215D772 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 12/05/1986 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| CP-86-66, TXX-6136, NUDOCS 8612170030 | |
| Download: ML20215D772 (1) | |
Text
_ - _ _ _ _ _ _ _ _ _
4' '
Log # TXX-6135 File # 10110 903.8 TEXAS UTILITIES GENERATING COMPANY SEYWAY TOWER . 4ee NORT94 OR.IVE STREET. I.B. SB . DAI.LAS. TEXAS 753D1 December Si, 1986 . ' i
[N 'N OE**.hB2."Uk i DEC _ 91986 Mr. Eric H. Johnson, Director Y y Division of Reactor Safety and Projects '
U. S. Nuclear Regulatory Commission - .
611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011
,s
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 NON-CONTACT LAP SPLICES IN;THE AUXILIARY BUILDING.
SDAR: CP-86-66 (INTERIM REPORT)
Dear Mr. Johnson:
s On September 26, 1986, we verballysnotified your Mr. I. Barnes' of a deficiency regarding vertical rebar exposed during the inspection of core' bores in the Auxiliary Building that apparently do not satisfy the criteria'of a code defined lap splice. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). We have submitted an. interim report logged TXX-6061, dated October 27,; 1986.. s t
Previous calculations and quality"documentstion are, currently under review to evaluate the structural adequacy of the wall identiffed in this deficiency.
This review will precede formal calculations required to assess the effects of l
this condition on the safety of plant operations. These activities are scheduled for completion January 28, 1987.
Our next report will be submitted no later than February 18, 1987.
Very truly yours, f, & '7kk W. G. Counsil JCH/amb ,
c - NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D. C. 20555 S
061205 pog050004 g PD a anustav or sms emu urres mcrate nnumv