Interim Deficiency Rept CP-86-08 Re Installation of Super Hilti Kwik Bolts.Initially Reported on 870205.Evaluation Continuing.Next Rept Will Be Submitted by 880224
ML20237A519
Person / Time
Site: Comanche Peak  
Issue date: 12/09/1987
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-86-08, CP-86-8, TXX-7072, NUDOCS 8712150058
Download: ML20237A519 (1)


Text

~

... kk i

M

== Log # TXX-7072 L 2 File # 10110 E E 903.9 1UELECTRIC

" # IU "O' ("}

waa.m c. counsu December 9, 1987 Emutne Var Pirmukrit U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555

SUBJECT:

COMANCHE PEAK SlEAM ELECTRIC STA110N (CPSES)

DOCKET NOS. 50-445 AND 50-446 INSTALLATION OF SUPER HILTI KWIK BOLTS SDAR: CP-86-08 (INTERIM REPORT)

Gentlemen:

On February 5,1987, we verbally notified your Mr. T. F. Westennan of a deficiency involving the control of stamps used to identify Super Hilti Kwik Dolts (llKB). This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). Our previous report was logged TXX-6889 dated October 19, 1987.

We are continuing our evaluation of this issue and will submit our next report by February 24, 1988.

Very truly yours,

' 4%

i W. G. Counsil CBC/grr l

c - Mr. R. D. Martin, Region IV '

Resident Inspectors, CPSES (3) 8712150058 871209 PDR ADOCK 05000445 d) y s DCD D 400 Mrth Olne Street LB BI Dallas. Texas 75201 0