Template:System actuation summary
Jump to navigation
Jump to search
System Actuation Reporting Summary
Valid | Invalid | |
---|---|---|
Moved | ENS + LER | LER (as 60 day ENS) |
Not moved | ENS + LER | None |
4-hour (ENS)
While Critical or RPS (ie Scram)
8-hour (ENS)
60-day (LER)
60-day (ENS)
Allowance for invalid signals which actuated a system
System actuation list
System Actuation Reporting contains a list of applicable systems
Both list include:
- (1) Reactor protection system (RPS) including: Reactor scram and reactor trip.
- (2) General containment isolation signals affecting containment isolation valves in more than one system or multiple main steam isolation valves (MSIVs).
- (3) Emergency core cooling systems (ECCS) for pressurized water reactors (PWRs) including: High-head, intermediate-head, and low-head injection systems and the low pressure injection function of residual (decay) heat removal systems.
- (4) ECCS for boiling water reactors (BWRs) including: High-pressure and low-pressure core spray systems; high-pressure coolant injection system; low pressure injection function of the residual heat removal system.
- (5) BWR reactor core isolation cooling system; isolation condenser system; and feedwater coolant injection system.
- (6) PWR feedwater system or emergency feedwater system.
- (7) Containment heat removal and depressurization systems, including containment spray and fan cooler systems.
- (8) Emergency ac electrical power systems, including: Emergency diesel generators (EDGs); hydroelectric facilities used in lieu of EDGs at the Oconee Station; and BWR dedicated Division 3 EDGs.
Only 50.73: (9) Emergency service water systems that do not normally run and that serve as ultimate heat sinks.