WEEKMONTHYEARENS 568462023-11-10T08:14:00010 November 2023 08:14:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Scram ENS 564302023-03-23T21:36:00023 March 2023 21:36:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Emergency Diesel Generator Actuation ENS 559092022-05-23T21:16:00023 May 2022 21:16:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Automatic Reactor Scram ENS 556162021-11-30T17:54:00030 November 2021 17:54:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unit 1 Automatic Scram ENS 555142021-10-11T17:21:00011 October 2021 17:21:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Automatic Reactor Scram After Main Turbine Trip ENS 541372019-06-27T13:37:00027 June 2019 13:37:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Loss of Power Resulted in a Valid Isolation Signal ENS 527952017-06-08T19:27:0008 June 2017 19:27:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Automatic Reactor Scram After Main Turbine Control Logic Loss of Power ENS 518382016-03-31T10:03:00031 March 2016 10:03:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Valid Isolation Signal Due to a Human Performance Error ENS 515322015-11-12T16:32:00012 November 2015 16:32:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram ENS 509732015-04-11T03:46:00011 April 2015 03:46:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram Caused by Main Turbine Trip Due to Degrading Main Condenser Vacuum ENS 493422013-09-14T07:30:00014 September 2013 07:30:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Scram Due to Feedwater Transient During Shutdown ENS 490992013-06-07T16:03:0007 June 2013 16:03:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Scram Due to a Reactor Water Level Transient During Startup ENS 486072012-12-19T22:31:00019 December 2012 22:31:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram Due to Low Reactor Pressure Vessel Level ENS 485982012-12-16T06:56:00016 December 2012 06:56:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Reactor Scram from 98% Power During Turbine Control Valve Testing ENS 485002012-11-09T09:20:0009 November 2012 09:20:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Rps Actuation Resulting from Low Reactor Water Level ENS 484962012-11-09T06:18:0009 November 2012 06:18:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Unit 2 Manual Scram Due to Loss of the Integrated Control System ENS 480552012-06-28T17:53:00028 June 2012 17:53:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Loss of One of Two Offsite Power Sources ENS 471722011-08-19T14:46:00019 August 2011 14:46:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Scram During Quarterly Surveillance Test ENS 465692011-01-25T11:10:00025 January 2011 11:10:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Scram Due to an Unisolable Extraction Steam System Leak ENS 461032010-07-16T20:41:00016 July 2010 20:41:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Scram Due to Unisolable Circulating Water System Leak ENS 459302010-05-15T03:01:00015 May 2010 03:01:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Scram Due to Increasing Reactor Water Level ENS 458662010-04-22T14:51:00022 April 2010 14:51:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Scram on Low Reactor Vessel Water Level During Feedwater Integrated Control System Testing ENS 430112006-11-26T01:42:00026 November 2006 01:42:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Scram from Full Power Due to Generator Load Reject ENS 426422006-06-15T07:00:00015 June 2006 07:00:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Reactor Scram While Shifting Power Supplies ENS 417462005-06-06T16:33:0006 June 2005 16:33:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram Due to Apparent Generator Load Rejection ENS 416462005-04-28T11:19:00028 April 2005 11:19:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unit 2 Manual Reactor Scram Due to Loss of Main Transformer Cooling ENS 406952004-04-21T20:35:00021 April 2004 20:35:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Scram in Response to High Main Turbine Vibration During Startup ENS 405742004-03-07T07:01:0007 March 2004 07:01:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Start of the "a" Emergency Diesel Generator During Emergency Service Supply Bus Outage ENS 401962003-09-24T04:53:00024 September 2003 04:53:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Automatic Scram at Susquehanna on Low Water Level 2023-03-23T21:36:00
[Table view] |