ML22230D063

From kanterella
Revision as of 08:15, 12 November 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Kairos Power LLC, Transmittal of Changes to Preliminary Safety Analysis Report Chapter 4
Date released: 08/19/2022 Download: ML22230D063


Kairos Power LLC, Changes to Preliminary Safety Analysis Report Chapter 4
ML22230D065
Person / Time
Site: Hermes
Issue date: 08/18/2022
From:
Kairos Power
To:
Office of Nuclear Reactor Regulation
References
KP-NRC-2208-004
Download: ML22230D065 (3)
Kairos Power LLC, Transmittal of Changes to Preliminary Safety Analysis Report Chapter 4
ML22230D064
Person / Time
Site: Hermes
Issue date: 08/18/2022
From: Hastings P
Kairos Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
KP-NRC-2208-004
Download: ML22230D064 (2)