ML20147C321

From kanterella
Revision as of 01:27, 26 July 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 78-070/03L-0
Date released: 06/09/2020 Download: ML20147C321


/03L-0 on 781115:procedure HNP-2-5202 Took Over 2 Hours Because 2B21-NO17C Could Not Be Calibr.Instru Was Replaced
ML20147C334
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 11/22/1978
From: Nix R
GEORGIA POWER CO.
To:
References
Download: ML20147C334 (1)
Forwards LER 78-070/03L-0
ML20147C317
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 11/22/1978
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20147C317 (1)