MONTHYEARML23090A2012023-03-31031 March 2023 Purdue Univ., Submittal of 2022 Annual Report ML21118A0232021-03-31031 March 2021 Purdue University - Report on Reactor Operations for the Period January 1, 2020 to December 31, 2020 ML18116A4472018-03-30030 March 2018 Purdue Univ., Submittal of 2017 Annual Report ML16102A1192016-03-31031 March 2016 Purdue Univ., Submittal of 2015 Annual Report for PUR-1 ML15092A1602015-03-30030 March 2015 Purdue University, Annual Operating Report for January 1,2014 Through December 31, 2014 ML14154A1232014-05-22022 May 2014 Purdue University Submission of 2013 Annual Report for PUR-1 ML13203A0822013-07-18018 July 2013 Purdue University - Report of Reactor Operations for January 1, 2012 to December 31, 2012 ML13203A0812013-07-18018 July 2013 Purdue University - Report of Reactor Operations for January 1, 2011 to December 31, 2011 ML0909103512009-03-30030 March 2009 Submission of 2008 Annual Report for PUR-1 ML0809201382008-03-28028 March 2008 Purdue University Reactor - Transmittal of Two Copies of the 2007 Annual Report ML0708900852007-03-28028 March 2007 Submittal of 2006 Annual Report for the Purdue University Reactor (PUR-1) ML0609002662006-03-31031 March 2006 Report on Reactor Operations for the Period January 1, 2005 to December 31, 2005 ML0409203982004-03-31031 March 2004 Purdue University Reactor - 1 Report on Reactor Operations ML0409703732003-12-31031 December 2003 Report on Reactor Operations, January 1 - December 31, 2003, Purdue University Reactor. 2023-03-31
[Table view] Category:Letter
MONTHYEARML23268A0752023-09-18018 September 2023 Purdue Univ., Submittal of Revised License Renewal Request ML23227A2462023-08-16016 August 2023 Examination Confirmation Letter No. 50-182/OL-24-01, Purdue University ML23171B0272023-06-13013 June 2023 Purdue Univ., Reply to Notice of Violation in NRC Inspection Report 05000182/2023201 IR 05000182/20232012023-05-23023 May 2023 Purdue University - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000182-2023201 and Notice of Violation ML23090A2012023-03-31031 March 2023 Purdue Univ., Submittal of 2022 Annual Report ML22238A2492022-09-0808 September 2022 Examination Confirmation Letter No. 50-182/OL-23-01, Purdue University IR 05000182/20212042021-12-0202 December 2021 Purdue University U.S. Nuclear Regulatory Commission Follow-Up Safety Inspection Report 05000182/2021204 ML21306A1602021-11-11011 November 2021 Examination Confirmation Letter No. 50-182/OL-22-02, Purdue University ML21267A4272021-09-21021 September 2021 Purdue Univ., Reply to Notice of Violation in NRC Special Inspection Report No. 05000182/2021202 ML21267A4052021-09-14014 September 2021 Purdue Univ., Reply to Notice of Violation in NRC Special Inspection Report No. 05000182/2021203 IR 05000182/20212032021-07-29029 July 2021 Purdue Safety HP - Safety Inspection Report No. 05000182/2021203 and Notice of Violation IR 05000182/20212022021-07-28028 July 2021 Purdue University Nuclear Regulatory Commission Security Inspection Report No. 05000182/2021202 (Cover Letter) ML21173A3102021-06-25025 June 2021 Purdue University Additional Training Preformed in Lieu of Annual Operating Test ML21153A4272021-06-24024 June 2021 Examination Confirmation Letter No. 50-182/OL-21-01, Purdue University ML21172A1562021-06-0303 June 2021 Request to Compensate for a Missed Annual Operating Test by Utilizing 10 CFR 55.59(b) for SOP-70830 at Purdue Univ ML21148A1132021-05-0707 May 2021 Update to Facility Personnel at Purdue University Reactor, PUR-1, Docket 50-182 ML21139A1242021-05-0707 May 2021 Update to Facility Personnel at Purdue University Reactor, PUR-1, Docket 50-182 IR 05000182/20212012021-05-0606 May 2021 Purdue University, Routine Safety Inspection 050182/2021201 ML21118A0232021-03-31031 March 2021 Purdue University - Report on Reactor Operations for the Period January 1, 2020 to December 31, 2020 IR 05000182/20202012021-02-16016 February 2021 Purdue University Reactor Notice of Violation and Special Inspection Report 05000182/2020-201 ML21029A0562021-01-21021 January 2021 Purdue University Reactor, Update to Facility Personnel ML21035A0142021-01-0606 January 2021 Response to Apparent Violations in NRC Special Inspection Report 05000182/2020201 ML20336A3242020-12-11011 December 2020 Purdue University - Issuance of Amendment No. 16 to Renewed Facility Operating License No. R-87, for the Purdue University Research Reactor to Modify the Technical Specifications to Allow Startup of the Purdue University Reactor to Calibrat ML20332A0832020-12-0707 December 2020 Purdue University, Special Inspection Report 05000182/2020201 ML20330A2312020-11-27027 November 2020 Purdue University - Acceptance of the Application for a License Amendment Modification of Technical Specifications to Allow Startup of the Purdue University Reactor to Calibrate Nuclear Instrumentation (EPID A11010//L-2020-PPM-0000) ML20337A1042020-11-24024 November 2020 Purdue University Submission of License Amendment Request, PUR-1, Docket 50-182 ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards ML20311A2642020-11-0303 November 2020 Purdue Univ. School of Nuclear Engineering - Written Conveyance of 14-Day Special Report, PUR-1 ML20045E4522020-02-18018 February 2020 Purdue University - Acknowledgement of Withdrawal of the Application for a License Amendment Request for Management Chain Change ML20038A2872020-02-0606 February 2020 Purdue University - Withdrawal of License Amendment Request, PUR-1, Docket 50-182 - Management Chain ML20017A2632020-01-17017 January 2020 Purdue University, Indiana - Letter Regarding Dean Mung Chiang New Position Assignment as a Science and Technology Adviser to the Secretary of State ML19345F3782019-12-11011 December 2019 Examination Confirmation Letter No. 50-020/OL-20-01, Massachusetts Institute of Technology ML19345F2712019-12-11011 December 2019 Examination Confirmation Letter No. 50-182/OL-20-01, Purdue University IR 05000182/20192022019-10-30030 October 2019 Purdue University U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000182/2019-202 ML19274C4472019-10-0808 October 2019 Examination Report No. 50-182/OL-19-01, Purdue University ML19142A2722019-05-24024 May 2019 Purdue University - Issuance of Amendment No. 15 Regarding Implementation Date Change for Licensing Amendment No. 14 for Facility Operating License No. R-87 ML19143A3842019-05-21021 May 2019 LAR Implementation Extenstion - PUR1 - 20190521 ML18262A4342019-04-0101 April 2019 Purdue University Transmittal Letter for Issuance of Amendment No. 14 to Renewed Operating License No. R-87 for the Purdue University Research Reactor Digital Instrumentation Control Upgrade IR 05000182/20192012019-03-20020 March 2019 Purdue University - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000182/2019-201 ML18282A1912018-10-0505 October 2018 Purdue University - Interlock Language Retention in Technical Specification Submission Supporting License Amendment Request, PUR-1, Docket 50-182 IR 05000182/20184102018-09-26026 September 2018 Purdue University - Transmittal Letter Regarding U.S. Nuclear Regulatory Commission Security-Related Inspection Report No. 05000182/2018-410 ML18263A1572018-09-20020 September 2018 Purdue University - Revisions to Technical Specification Submission Supporting License Amendment Request, PUR-1, Docket 50-182 ML18134A1612018-05-14014 May 2018 Purdue University - Notification of Level 1 Personnel Change ML18116A4462018-04-20020 April 2018 Purdue Univ., Special Report-Event Notification #53321 - Technical Specification 6.7.b.1.c.vi ML18116A4472018-03-30030 March 2018 Purdue Univ., Submittal of 2017 Annual Report ML18061A1392018-03-0202 March 2018 Purdue University - Augmented Request for Additional Information Response for Digital Control and Instrumentation Upgrade License Amendment Request ML17321B0662017-12-20020 December 2017 Purdue University - Regulatory Audit Report for Digital Control and Instrumentation Up-Grade License Amendment Request ML18010A8952017-12-18018 December 2017 Purdue University - Request for Additional Information Response for Digital Control and Instrumentation Upgrade License Amendment Request ML17272A0392017-10-0303 October 2017 Purdue University Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request for Management Chain Change ML17241A0312017-08-28028 August 2017 Submission of License Amendment Request, PUR-1, Docket 50-182-Management Chain Change 2023-09-18
[Table view] |
Text
REPORT ON REACTOR OPERATIONS For the Period January 1, 2020 to December 31, 2020 PURDUE UNIVERSITY REACTOR-1 (PUR-1)
Facility Docket No. 50-182 PURDUE UNIVERSITY West Lafayette, Indiana 47907 March 2021 Prepared by Clive Townsend, Reactor Supervisor
- 1. INTRODUCTION This report is submitted to meet the requirements set forth in the Technical Specifications of the Purdue University Reactor (PUR-1) and 10 CFR 50.59 for the period January 1, 2020 to December 31, 2020.
During the reporting period of 2020, the reactor operated very little due to the onset of the COVID-19 pandemic. Moderate teaching activity was perfonned in the early portion of the year and the facility spent much of 4th quarter resolved power calibration issues.
There were 235 visitors across 70 groups to the facility including Purdue facilities staff, students, general tours, and VIPs.
- 2. PLANT DESIGN AND OPERATIONAL CHANGES 2.1 Facility Design Changes There were no facility design changes in the operations year.
2.2 Perfonnance Characteristics The overall status of the PUR-1 facility was sustained satisfactorily during the reporting period. The facility maintained all required surveillances except as noted below. Monthly surveillances of process water showed no fission product contamination, thereby verifying fuel integrity.
2.3 Changes in Operating Procedures Concerning Safety of Facility Operations Following significant review, changes were identified to be necessary in the power calibration procedure to reduce "skill of the craft" on the part of operators.
These changes were proposed in 2020 and would be further approved in 2021.
2.4 Results of Surveillance Tests and Inspections 2.4.1" Reactivity Limits The reactivity worth measurements and visual inspection of the control rods was not perfonned during 2020. The rods were last calibrated in August 2019 and are due for inspection and calibration again in 2021.
2.4.2 Reactor Safety Systems
Purdue was given notice of a probable violation for not performing appropriate surveillance testing before considering the nuclear instrument system operable following the replacement of the NI system and detectors. Staff incorrectly considered the system operable through the currently calibrated range when the entire system's calibration should have been completed first All other surveillances regarding the Reactor_ Safety ~m-were completed-~ * -
- 2.4.3 P~rriarv *coolant System :
- During the checks the* conductivity of the primary ~lant was *measured ..
- 3 a*nd the values never exceeded micromhos/crri.
- Monthly samples of the primary-coolant were col_lected.and analyzed by*
. personnel from_ Radiological _and Environmental Management for gross *
-* alpha and beta activity.. No activity which W()Uld in_dicate ~ilure of tile.:
fuel plates wa~*idijntified in the samples.* **
- No qperation or fuel.handling was performed while the air p~ure was*
- bek>w -0.05 inches' of water. .
The air system isolation was tested and correct operation of 1he louvres wa~ observed; The Condensate Valve was. also.Inspected at this time.
. . 2.4-:s Experiments Or:ie irradiation experiment was began in 2020 but was-terminated early-due to power calibratl9n issues. *
.: A special inspection was perf'.oimed October 27 - Novetn~r 6 foilowing a; -
notification to_ the Headquait~rs- Operations Officer of an overpower in reactor
. power due to an incorrect calibration~* Th~ results :*of that inspectioh are available as ML21035A348~ * *
- 2.5 .Changes. Tests and Experiments Requiring Commission Authorization On~ change was made: to the' ~c;:ility Technical Specification in 2020 which clarified when *certain surv~illances must be performed .following change or .
modification to equipment the cilange allows for reactor operation to perform * -
the.requisite work when applicable..
- 2.6 Changes* in *Facility St.aff
There were no changes in facility staff in 2020.
- 3. POWER GENERATION There were 20 total runs in 2020 which generated an indicated value of 27 .9 kWh of thermal heat. The total operations time was *38.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> giving ari average indicated power level of 730 Watts. Due to potential issues in the power calibration, this varue is most likely an average of 2.2 kW and a total power generation of not more than 83.7 kWh.
The total core energy. produced is approximately 83 kWh since installation in 2007.
- 4. UNSCHEDULED SHUTDOWNS There were one
. . unscheduled
. shutdown in 2020 due to a high radiation level reading on the Pool Top Scram monitorof43 mRem/hour. Corrective actions were reviewed and set for implementation in 2021 following restart after errors in power calibration.
- 5. MAINTENANCE' The HEPA filter for the room supply and exhaust air was checked upon during normal maintenance checks quarterly. Filters were replaced as needed. *
- 6. RADIOACTIVE EFFLUENT RELEASES No measurable amount of radioactive effluent was _released to the environs beyond our-effective.control, as measured at_or prior to the point of such release.
- 7. OCCU~ATIONAL PERSONNEL RADIATIO.N EXPOSURE .
No radiation exposures greater than 25% of the appropria_ te *limits of 10 CFR 20 .
were received dJring the reporting period.
- 8.. EN\/IRONMENTALSUR VEYS :PERFORMED OUTSIDE THE FACILITY
.There were additional envi~onmental.surveys performed outside the facility beyond. .
license *and regulatory requfrements. * . . . .