Letter Sequence Other |
---|
EPID:L-2021-LLM-0000, Order Extending the Effectiveness of the Approval of the Transfer of the License for the Zion Nuclear Power Station from Zionsolutions, LLC to Exelon Generation Company, LLC (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement
Results
Other: ML21076A439, ML21102A065, ML21102A075, ML21145A014, ML21154A011, ML21154A013, ML21154A014, ML21165A196, ML21229A027, ML21294A376, ML21309A507, ML21309A508
|
MONTHYEARRS-20-070, Defueled Safety Analysis Report Update, Revision 102020-06-22022 June 2020 Defueled Safety Analysis Report Update, Revision 10 Project stage: Request RS-20-107, Certification of Permanent Cessation of Power Operations for Byron Station, Units 1 and 22020-09-0202 September 2020 Certification of Permanent Cessation of Power Operations for Byron Station, Units 1 and 2 Project stage: Request RS-20-116, License Amendment Request - Proposed Changes to Unit 1 Technical Specifications Section 6.1, Responsibility, and Units 2 and 3 Technical Specifications 1.1, Definitions, and 5.0, Administrative2020-09-24024 September 2020 License Amendment Request - Proposed Changes to Unit 1 Technical Specifications Section 6.1, Responsibility, and Units 2 and 3 Technical Specifications 1.1, Definitions, and 5.0, Administrative Project stage: Request RS-20-109, Renewed Facility Operating License, Request for Approval of Certified Fuel Handler Training and Retraining Program2020-09-24024 September 2020 Renewed Facility Operating License, Request for Approval of Certified Fuel Handler Training and Retraining Program Project stage: Request ML20259A4692020-10-21021 October 2020 Order Extending the Effectiveness of the Approval of the Transfer of the License for the Zion Nuclear Power Station from Zionsolutions, LLC to Exelon Generation Company, LLC Project stage: Request RS-20-140, Proposed Changes to Decommissioning Trust Agreements2020-10-30030 October 2020 Proposed Changes to Decommissioning Trust Agreements Project stage: Request RS-21-030, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2021-02-24024 February 2021 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Project stage: Request ML21057A2732021-02-25025 February 2021 Application for Order Approving License Transfers and Proposed Conforming License Amendments Project stage: Request ML21076A4392021-03-17017 March 2021 Attachment 1 - Requests for Exemptions from Portions of 10 CFR 50.47(b), 10 CFR 50.47(c)(2) and 10 CFR 50, Appendix E Project stage: Other ML21084A2532021-03-24024 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Transfer Application Project stage: Acceptance Review RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments Project stage: Supplement ML21084A1352021-04-0505 April 2021 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML21102A0652021-04-28028 April 2021 Notice of Consideration of Approval of Transfer of Licenses and Conforming Amendments and Opportunity for a Hearing Project stage: Other ML21102A0752021-04-28028 April 2021 Fleet - Notice of Consideration of Approval of Transfer of Licenses and Conforming Amendments and Opportunity for a Hearing (FRN) Project stage: Other ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application Project stage: RAI ML21145A0142021-05-26026 May 2021 Fleet and the Associated Independent Spent Fuel Storage Installations - Extension of Comment Period for Notice of Consideration of Approval of Transfer of Licenses and Conforming Amendments and Opportunity to Request a Hearing EPID L-2021-L Project stage: Other ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application Project stage: Other ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application Project stage: Other ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application Project stage: Other ML21165A1962021-06-14014 June 2021 Petition of Epstein TMI-Alert for Leave to Intervene Exelon'S Proposed Holdco and Spinco License Transfer Application Project stage: Other ML21165A2952021-06-14014 June 2021 Petition of Edf Inc. for Leave to Intervene and Request for a Hearing Project stage: Request ML21174A3202021-06-23023 June 2021 Petition to Intervene and Hearing Request of the Environmental Law and Policy Center, Declaration of Robert Vogl, and Declaration of Peter Bradford Project stage: Request ML21193A3262021-07-12012 July 2021 People of the State of Illinois'S Non-Confidential Request for Leave to Intervene and for a Hearing Regarding Exelon Generation Company, Llc'S Facility Operating License Transfer Application Project stage: Request ML21221A1532021-08-0909 August 2021 Edf Inc.'S Notice of Withdrawal of Edf Inc.'S Petition for Leave to Intervene and Hearing Request Project stage: Request NMP1L3419, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, R. E. Ginna, Notification of Closing of Sale of Ownership Interest in Constellation Energy Nuclear Group, LLC2021-08-11011 August 2021 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, R. E. Ginna, Notification of Closing of Sale of Ownership Interest in Constellation Energy Nuclear Group, LLC Project stage: Request ML21229A0272021-08-30030 August 2021 Order Extending the Effectiveness of the Approval of the Transfer of Licenses and Conforming Amendments Project stage: Other ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application Project stage: RAI RS-21-096, Withdrawal of Certification of Permanent Cessation of Power Operations for Byron Station, Units 1 and 2, and Previously Submitted Licensing Actions in Support of Decommissioning2021-09-15015 September 2021 Withdrawal of Certification of Permanent Cessation of Power Operations for Byron Station, Units 1 and 2, and Previously Submitted Licensing Actions in Support of Decommissioning Project stage: Request RS-21-097, Withdrawal of Certification of Permanent Cessation of Power Operations for Dresden Nuclear Power Station, Units 2 and 3, and Previously Submitted Licensing Actions in Support of Decommissioning2021-09-15015 September 2021 Withdrawal of Certification of Permanent Cessation of Power Operations for Dresden Nuclear Power Station, Units 2 and 3, and Previously Submitted Licensing Actions in Support of Decommissioning Project stage: Request ML21279A0062021-10-13013 October 2021 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML21309A5082021-11-0505 November 2021 Notification of Significant Licensing Action Project stage: Other ML21277A2472021-11-0505 November 2021 Notification of Significant Licensing Action - Proposed Issuance of Order Approving the Transfer of Licenses for Which a Hearing Has Been Requested - Exelon Generation Company, LLC; Et. Al Project stage: Approval ML21309A5072021-11-0505 November 2021 Commission Notification Regarding Notification of Significant Licensing Action Project stage: Other ML21277A2452021-11-16016 November 2021 Approval of Indirect Transfer of Licenses and Draft Conforming License Amendments Project stage: Request ML21277A2482021-11-16016 November 2021 Letter with Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (Public Version) Project stage: Draft Approval ML21277A1922021-11-16016 November 2021 Enclosure 1, Order Approving Transfer of Licenses and Draft Conforming License Amendments Project stage: Draft Other ML21294A3762021-11-16016 November 2021 Federal Register Notice for Order Approving Indirect Transfer of Licenses Project stage: Other 2021-03-25
[Table View] |
Similar Documents at Zion |
---|
Category:Federal Register Notice
MONTHYEARML24183A2342024-07-12012 July 2024 FRN: Issuance of Multiple Exemptions Regarding Security Notifications, Reports, and Recordkeeping ML21294A3762021-11-16016 November 2021 Federal Register Notice for Order Approving Indirect Transfer of Licenses ML21229A0282021-09-0202 September 2021 License Transfer Order Third Extension FRN ML21229A0272021-08-30030 August 2021 Order Extending the Effectiveness of the Approval of the Transfer of Licenses and Conforming Amendments ML21145A0152021-05-26026 May 2021 FRN Exelon License Transfer - Extend Comment Period ML21145A0142021-05-26026 May 2021 Fleet and the Associated Independent Spent Fuel Storage Installations - Extension of Comment Period for Notice of Consideration of Approval of Transfer of Licenses and Conforming Amendments and Opportunity to Request a Hearing EPID L-2021-L ML21110A6102021-05-25025 May 2021 FRN for Issuance of 2nd Order Extension ML21102A0752021-04-28028 April 2021 Fleet - Notice of Consideration of Approval of Transfer of Licenses and Conforming Amendments and Opportunity for a Hearing (FRN) ML20259A4672020-10-21021 October 2020 FRN for Issuance of Order ML20259A4692020-10-21021 October 2020 Order Extending the Effectiveness of the Approval of the Transfer of the License for the Zion Nuclear Power Station from Zionsolutions, LLC to Exelon Generation Company, LLC ML20098C9852020-06-22022 June 2020 FRN for Issuance of Exemptions ML19228A1282019-12-0303 December 2019 License Transfer FRN Issuance of Order ML18277A2672018-11-0707 November 2018 Federal Register Notice: Issuance for Zionsolution, LLC, Zion Nuclear Power Station, Unit 1 and 2, Independent Spent Fuel Storage Installation NRC-2018-0243, Federal Register Notice: Issuance for Zionsolution, LLC, Zion Nuclear Power Station, Unit 1 and 2, Independent Spent Fuel Storage Installation2018-11-0707 November 2018 Federal Register Notice: Issuance for Zionsolution, LLC, Zion Nuclear Power Station, Unit 1 and 2, Independent Spent Fuel Storage Installation ML18172A1822018-06-26026 June 2018 Federal Register Notice - Finding of No Significant Impact Regarding the Zion License Termination Plan ML16285A1412016-12-15015 December 2016 Environmental Assessment and Finding of No Significant Impact for Zion Emergency Plan Amendment ML15238B7782015-08-21021 August 2015 EnclosuDraft-FRN Exemption (Letter to J. Sauger Response to Request for Exemption from Portions of Title 10 of the Code of Federal Regulations Sections 72.212(a)(2), 72.212(b)(5), 72.212(b)(11), and 72.214) ML15238B6452015-08-21021 August 2015 EnclosuFRN- Notice of Availability of Exemption for Zionsolutions, LLC, Zion Nuclear Power Station Independent Spent Fuel Storage Installation ML15190A1772015-07-16016 July 2015 Federal Register Notice: Zion License Termination Plan Comment Period Reopening ML15140A3802015-07-0808 July 2015 FRN Environmental Assessment and Finding of No Significant Impact; Issuance NRC-2015-0168, FRN Environmental Assessment and Finding of No Significant Impact; Issuance2015-07-0808 July 2015 FRN Environmental Assessment and Finding of No Significant Impact; Issuance ML15168A0702015-07-0707 July 2015 Federal Register Notice: Zion License Termination Plan Comment Period Reopening ML15148A3762015-06-0101 June 2015 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Published June 9, 2015 ML14272A2802015-03-30030 March 2015 EP Exemption ML14273A3092015-03-30030 March 2015 Federal Register Notice: Environmental Assessment and Finding of No Significant Impact; Issuance NRC-2015-0087, Federal Register Notice: Environmental Assessment and Finding of No Significant Impact; Issuance2015-03-30030 March 2015 Federal Register Notice: Environmental Assessment and Finding of No Significant Impact; Issuance ML15084A1142015-03-26026 March 2015 Bladey Memo Request for Comment and Public Meeting - Zion Nuclear Power Station, Units 1 and 2 ML15084A1182015-03-26026 March 2015 Federal Register Notice Request for Comment and Public Meeting - Zion Nuclear Power Station, Unit Nos. 1 and 2 ML15008A4172015-01-30030 January 2015 10 CFR Part 20, Appendix G, Section Iii. E for Zion Nuclear Power Station NRC-2015-0024, 10 CFR Part 20, Appendix G, Section Iii. E for Zion Nuclear Power Station2015-01-30030 January 2015 10 CFR Part 20, Appendix G, Section Iii. E for Zion Nuclear Power Station ML14342A1482014-12-11011 December 2014 Enclosufederal Registered Notice, Exemption Issuance (Draft) NRC-2014-0199, Enclosufederal Registered Notice, Exemption Issuance (Draft)2014-12-11011 December 2014 Enclosufederal Registered Notice, Exemption Issuance (Draft) ML14030A5952014-07-21021 July 2014 Enclosure 1 - Decommissioning Trust Exemption for Zion NRC-2011-0145, Enclosure 1 - Decommissioning Trust Exemption for Zion2014-07-21021 July 2014 Enclosure 1 - Decommissioning Trust Exemption for Zion NRC-2014-0028, Biweekly Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: February 18, 20142014-02-10010 February 2014 Biweekly Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: February 18, 2014 ML14037A4142014-02-10010 February 2014 Biweekly Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: February 18, 2014 ML13310B9942013-12-13013 December 2013 FRN - Zion Nuclear Power Station Units 1 and 2 Exemption NRC-2013-0096, Zion Indirect License Transfer Order2013-05-0808 May 2013 Zion Indirect License Transfer Order ML13122A0632013-05-0808 May 2013 Indirect License Transfer Order ML13017A1462013-02-11011 February 2013 Notice of Consideration of Indirect Transfer NRC-2011-0244, Federal Register Notice - Zion Nuclear Power Station Exemption from 10 CFR Part 732011-11-10010 November 2011 Federal Register Notice - Zion Nuclear Power Station Exemption from 10 CFR Part 73 ML1120102252011-11-10010 November 2011 Federal Register Notice - Zion Nuclear Power Station Exemption from 10 CFR Part 73 ML1120004912011-10-12012 October 2011 FRN - Zion Environmental Assessment for Exemption from 73.55 ML0922205062009-09-0101 September 2009 FRN: Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities, Salem, Three Mile Island, Zion, and South Texas Project - Notice of Withdrawal of Application for Indirect Transfer of Control of Operating ML0908607992009-07-0101 July 2009 Notice of Consideration of Approval of Application Regarding Proposed Meger and Opportunity for a Hearing (Cover Letter) ML0814408752008-06-0202 June 2008 U.S. NRC Notice of Public Meeting on Proposed Zion License Transfer and Draft Post Shutdown Decommissioning Activities Report ML0805002612008-05-15015 May 2008 Michael Lesar Memo Federal Register Notice of Notice of Consideration of Approval of Transfer of Facility Operating License and Conforming Amendment, and Opportunity for a Hearing - Zion Nuclear Power Station, Units 1 and 2 ML0214202882002-05-23023 May 2002 Order Modifying Licenses for Interim Safeguards and Security Compensatory Measures 2024-07-12
[Table view] Category:Order
MONTHYEARML22021B6602022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000)-Enclosure 1 ML22021B6592022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000) (Letter) ML21277A1922021-11-16016 November 2021 Enclosure 1, Order Approving Transfer of Licenses and Draft Conforming License Amendments ML21229A0272021-08-30030 August 2021 Order Extending the Effectiveness of the Approval of the Transfer of Licenses and Conforming Amendments ML21110A6062021-05-12012 May 2021 2nd Order Extending the Effectiveness of the Approval of the Transfer of the License for the Zion Nuclear Power Station from Zionsolutions, LLC to Exelon Generation Company, LLC ML0909300392009-05-0404 May 2009 Enclosure 1- Order Approving the Transfer of Licenses and Conforming Amendment ML0214202882002-05-23023 May 2002 Order Modifying Licenses for Interim Safeguards and Security Compensatory Measures ML0037643732000-10-0505 October 2000 Order Approving Application Regarding Proposed Corporate Restructuring ML0037597272000-10-0505 October 2000 Letter Transmitting Orders Approving Application Regarding Proposed Corporate Restructuring ML0037382762000-08-0303 August 2000 Order Approving Transfer of Licenses and Conforming Amendments 2022-02-01
[Table view] |
Text
[7590-01-P]
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION
[NRC-2019-0236]
In the Matter of )
)
ZionSolutions, LLC and ) Docket Nos.: 50-295, 50-304, Exelon Generation Company, LLC ) and 72-1037
)
Zion Nuclear Power Station, Units 1 and 2 ) License Nos.: DPR-39 and DPR-48
)
EA-19-125 )
)
ORDER EXTENDING THE EFFECTIVENESS OF THE APPROVAL OF THE TRANSFER OF LICENSES AND CONFORMING AMENDMENTS I.
ZionSolutions, LLC is the holder of U.S. Nuclear Regulatory Commission (NRC, the Commission) Facility Operating License Nos. DPR-39 and DPR-48 for the Zion Nuclear Power Station, Units 1 and 2, respectively (ZNPS), and the associated general license for the ZNPS independent spent fuel storage installation (ISFSI), which are located in Lake County, Illinois.
ZionSolutions, LLC is authorized to possess and maintain ZNPS and the ZNPS ISFSI.
Operation of ZNPS is no longer authorized under these licenses.
II.
By Order dated November 26, 2019 (Transfer Order), the Commission consented to the direct transfer of the ZNPS licenses from ZionSolutions, LLC to Exelon Generation Company, LLC and approved draft conforming administrative license amendments in Enclosure
accordance with Sections 50.80, Transfer of licenses, 72.50, Transfer of license, and 50.90, Application for amendment of license, construction permit, or early site permit, of Title 10 of the Code of Federal Regulations (10 CFR). By its terms, the Transfer Order becomes null and void if the transfer is not completed within one year (i.e., by November 26, 2020); provided, however, that upon written application and for good cause shown, such date may be extended by order. By letter dated August 27, 2020, ZionSolutions, LLC submitted a written application to extend the effectiveness of the Transfer Order by six months, until May 26, 2021. That request was approved by Order (First Extension Order) dated October 21, 2020. Subsequently, by letter dated April 15, 2021, ZionSolutions, LLC submitted a written application to extend the effectiveness of the Transfer Order by an additional six months, until November 26, 2021. That request was approved by Order (Second Extension Order) dated May 12, 2021.
III.
By letter dated August 17, 2021, ZionSolutions, LLC submitted a written application to extend the effectiveness of the Transfer Order by an additional twelve months, until November 26, 2022. As stated in the application, responses to requests for additional information regarding ZNPS Final Status Survey Final Reports and their associated Release Records are currently under review by the NRC staff. The extension would provide the NRC staff with additional time to assess the responses provided by ZionSolutions, LLC and make a final determination regarding the release of land for unrestricted use.
Based on the above, the NRC has determined that ZionSolutions, LLC has shown good cause for extending the effectiveness of the Transfer Order by an additional twelve months, as requested.
IV.
Accordingly, pursuant to Sections 161b, 161i, and 184 of the Atomic Energy Act of 1954, as amended, 42 U.S.C. Sections 2201(b), 2201(i), and 2234; and 10 CFR 50.80 and 10 CFR 72.50, IT IS HEREBY ORDERED that the expiration date of the Transfer Order, as extended by the Second Extension Order, is further extended until November 26, 2022. If the subject license transfer from ZionSolutions, LLC to Exelon Generation Company, LLC is not completed by November 26, 2022, the Transfer Order shall become null and void; provided, however, that upon written application and for good cause shown, such date may be extended by order.
This Order is effective upon issuance.
For further details with respect to this Order, see the written application for extension dated August 17, 2021, which is available electronically through the NRCs Agencywide Documents Access and Management System (ADAMS) in the NRC Library at https://www.nrc.gov/reading-rm/adams.html under Accession No. ML21230A322. Persons who encounter problems with ADAMS should contact the NRCs Public Document Room reference staff by telephone at 1-800-397-4209 or 301-415-4737 or by e-mail to pdr.resource@nrc.gov.
Dated this 30th day of August 2021.
FOR THE NUCLEAR REGULATORY COMMISSION Signed by Lubinski, John on 08/30/21 John W. Lubinski, Director, Office of Nuclear Material Safety and Safeguards.