ML21291A182

From kanterella
Revision as of 13:23, 18 January 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
HEAF - NEI
ML21291A182
Person / Time
Issue date: 10/20/2021
From: Lingham S
NRC/NRR/DORL/LPL4
To:
Lingham S
Shared Package
ML21291A179 List:
References
EPID: L-2021-NFO-0007
Download: ML21291A182 (1)


Text

Does Al HEAF Require a Change to Modeled ZOI?

It is a safety concern warranting action It is not a safety concern

  • OECD non-prototypic test but no ZOI
  • Cables very robust measured
  • 100,000s of component operating years with Al widespread
  • No op ex shows an increased ZOI
  • Actual ZOI bounded by modeled ZOI
  • Cables in ZOI functional
  • Robinson within modeled ZOI
  • Appendix R separation - change in ZOI would have to be very large