Requests That W Provide Update to 921215 Submittal,Providing Comparison of AP600 Design,Including Pra,To NRC-reviewed Version of EPRI Urd for Passive Plants
ML20141B874
Person / Time
Site: 05200003
Issue date: 06/20/1997
From: Slosson M
NRC (Affiliation Not Assigned)
To: Liparulo N
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
References
NUDOCS 9706240193
Download: ML20141B874 (4)


Text

! . , June 20, 1997 l

Mr. Nicholas J. Liparulo, Manager l Nuclear Safety and Regulatory Analysis Nuclear and Advanced Technology Division Westinghouse Electric Corporation P.O. Box 355 l Pittsburgh, PA 15230 1

SUBJECT:

COMPARIS0N OF THE AP600 DESIGN AGAINST THE ELECTRIC POWER RESEARCH INSTITUTE'S (EPRI's) ADVANCED LIGHT WATER REACTOR (ALWR) UTILITY REQUIREMENTS DOCUMENT (URD) FOR PASSIVE DESIGNS

Dear Mr. Liparulo:

In its December 15, 1989, staff requirements memorandum, the Commission directed the staff to highlight t' nose areas where the resolution of issues for I a final design approval / design certification application is different than the resolution proposed in the EPRI's ALWR URD. In a letter dated September 23, 1992, the staff requested Westinghouse (Q100.1) to provide such a comparison l between the AP600 design, including the probabilistic risk assessment (PRA), '

and the EPRI URD for passive ALWRs. In its letter dated December 15, 1992, Westinghouse submitted a comparison of the AP600 design with Revision 3 of Volume III of the URD.

Since that last response, the staff completed its review of the EPRI URD through Revisions 4 and 5 (depending on the chapter), as modified by the l letters listed in the enclosure, and issued the results of its evaluation in I NUREG-1242, "NRC Review of EPRI's ALWR URD - Passive Plant Designs," dated l August 1994. Accordingly, the staff requests that Westinghouse provide an update to its December 15, 1992, submittal, providing a comparison of the I AP600 design, including the PRA, to the NRC-reviewed version of the EPRI URD 1 for passive plants. Note that Revision 6 to the URD for passive plants was expected to only incorporate the letters referenced in the enclosure.

However, some changes in subsequent revisions to the URD may not have been reviewed by the staff. Compliance of the AP600 with these unreviewed changes should be treated as deviations from the NRC-reviewed URD.

We request that the update be provided in a time frame to support the review schedule of the AP600 design. If you have any questions concerning this matter, contact Thomas Kenyon at (301) 415-1120.

l Sincerely, original signed b Marylee M. Slosson,y: Acting Director Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No.52-003  !;

Enclosure:

As stated See next page cc w/ enclosure: il)

! DISTRIBUTION:

See next page DOCUMENT NAME: A: COMPLY E.PRI ~

Ta ,e:elve a copy of thle dop6qplent,ladcate ln the box: "C" = Copy without ottachment/ enclosure *E" = Copy with attachment / enclosure *N" = No copy 0FFICE PM:PEQ)DRPM l D:PDST:DRPM (A)D:DRPM l NAME TJKery'dih TRQuay '7M MMSlosson C Mt/

LDATE 06/A/97 06//f/97 06/20/97 ' 'M 9706240193 970620 'IAL RECORD COPY' '

PDR ADOCK 05200003 A PDR

l l

Mr. Nicholas J. Liparulo Docket No.52-003 Westinghouse Electric Corporation AP600 I

cc: Mr. B. A. McIntyre Mr. Ronald Simard, Director l Advanced Plant Safety & Licensing Advanced Reactor Programs Westinghouse Electric Corporation Nuclear Energy Institute ,

Energy Systems Business Unit 1776 Eye Street, N.W.

P.O. Box 355 Suite 300 l Pittsburgh, PA 15230 Washington, DC 20006-3706 '

Mr. Cindy L. Haag Ms. Lynn Connor Advanced Plant Safety & Licensing Doc-Search Associates Westinghouse Electric Corporation Post Office Box 34 Energy Systems Business Unit Cabin John, MD 20818 Box 355 Pittsburgh, PA 15230 Mr. James E. Quinn, Projects Manager LMR and SBWR Programs Mr. S. M. Modro GE Nuclear Energy Nuclear Systems Analysis Technologies 175 Curtner Avenue, M/C 165 Lockheed Idaho Technologies Company San Jose, CA 95125 Post Office Box 1625 Idaho Falls, ID 83415 Mr. Robert H. Buchholz GE Nuclear Energy Mr. Sterling Franks 175 Curtner Avenue, MC-781 U.S. Department of Energy San Jose, CA 95125 NE-50 19901 Germantown Road Barton Z. Cowan, Esq.

Gennantown, MD 20874 Eckert Seamans Cherin & Mellott 600 Grant Street 42nd Floor l Mr. Frank A. Ross Pittsburgh, PA 15219 U.S. Department of Energy, NE-42 Office of LWR Safety and Technology Mr. Ed Rodwell, Manager 19901 Germantown Road PWR Design Certification Germantown, MD 20874 Electric Power Research Institute 3412 Hillview Avenue Mr. Charles Thompson, Nuclear Engineer Palo Alto, CA 94303 AP600 Certification NE-50 19901 Germantown Road Germantown, MD 20874 l

l

c l

l NRC-Reviewed Chapters of the l

EPRI Utility Requirements Document I

(NUREG-1242)

I Referenced l Chanter Revision Letters 1 5 -

l

1, Appendix A 4 4/5/93

' 4/23/93 5/3/93 6/7/93 j 6/8/93 1, Appendix B 5 -

2 5 -

3 5 -

4 5 -

5 5 6/8/93 (2 letters) 6 5 -

7 5 -

8 5 -

9 4 -

10 5 -

l 11 5 -

12 5 -

13 5 -

l 1

i Enclosure l

i

. . . ... . - _ _ . . . . - . . . . ~ . . . . . - - . . . . - . .

e ( i l

l ISTRIBUTION: Letter to Mr. Nicholas J. Linarulo. Dated: June 20. 1997 I:lecket:File 3 PUBLIC PDST R/F MSlosson SWeiss TQuay i TKenyon BHuffman 1 JSebrosky