MONTHYEARML20168A7322020-06-16016 June 2020 Final ASP Analysis - St. Lucie 1 (LER 335-78-017) ML20168A7312020-06-16016 June 2020 Final ASP Analysis - St. Lucie 1 (LER 335-77-026) ML20156A2522020-06-0404 June 2020 Final ASP Analysis - St. Lucie 2 (LER 389-87-003) ML20156A2512020-06-0404 June 2020 Final ASP Analysis - St. Lucie 2 (LER 389-86-011) ML20156A2502020-06-0404 June 2020 Final ASP Analysis - St. Lucie 2 (LER 389-84-011) ML20156A2492020-06-0404 June 2020 Final ASP Analysis - St. Lucie 2 (LER 389-84-004) ML20156A2482020-06-0404 June 2020 Final ASP Analysis - St. Lucie 2 (LER 389-83-037) ML20156A2472020-06-0404 June 2020 Final ASP Analysis - St. Lucie 1 (LER 335-82-062) ML20156A2462020-06-0404 June 2020 Final ASP Analysis - St. Lucie 1 (LER 335-82-040) ML20156A2452020-06-0404 June 2020 Final ASP Analysis - St. Lucie 1 (LER 335-81-056) ML20156A2442020-06-0404 June 2020 Final ASP Analysis - St. Lucie 1 (LER 335-80-029) ML20140A2102020-05-19019 May 2020 Final ASP Analysis - St. Lucie 2 (LER 389-95-005) ML20140A2092020-05-19019 May 2020 Final ASP Analysis - St. Lucie 2 (LER 389-90-001) ML20140A2082020-05-19019 May 2020 Final ASP Analysis - St. Lucie 1 (LER 335-97-011) ML20140A2072020-05-19019 May 2020 Final ASP Analysis - St. Lucie 1 (LER 335-95-004) 2020-06-04
[Table view] Category:Final
MONTHYEARML20168A7322020-06-16016 June 2020 Final ASP Analysis - St. Lucie 1 (LER 335-78-017) ML20168A7312020-06-16016 June 2020 Final ASP Analysis - St. Lucie 1 (LER 335-77-026) ML20156A2522020-06-0404 June 2020 Final ASP Analysis - St. Lucie 2 (LER 389-87-003) ML20156A2512020-06-0404 June 2020 Final ASP Analysis - St. Lucie 2 (LER 389-86-011) ML20156A2502020-06-0404 June 2020 Final ASP Analysis - St. Lucie 2 (LER 389-84-011) ML20156A2492020-06-0404 June 2020 Final ASP Analysis - St. Lucie 2 (LER 389-84-004) ML20156A2482020-06-0404 June 2020 Final ASP Analysis - St. Lucie 2 (LER 389-83-037) ML20156A2472020-06-0404 June 2020 Final ASP Analysis - St. Lucie 1 (LER 335-82-062) ML20156A2462020-06-0404 June 2020 Final ASP Analysis - St. Lucie 1 (LER 335-82-040) ML20156A2452020-06-0404 June 2020 Final ASP Analysis - St. Lucie 1 (LER 335-81-056) ML20156A2442020-06-0404 June 2020 Final ASP Analysis - St. Lucie 1 (LER 335-80-029) ML20140A2102020-05-19019 May 2020 Final ASP Analysis - St. Lucie 2 (LER 389-95-005) ML20140A2092020-05-19019 May 2020 Final ASP Analysis - St. Lucie 2 (LER 389-90-001) ML20140A2082020-05-19019 May 2020 Final ASP Analysis - St. Lucie 1 (LER 335-97-011) ML20140A2072020-05-19019 May 2020 Final ASP Analysis - St. Lucie 1 (LER 335-95-004) 2020-06-04
[Table view] |
Text
y 16, 1977 Offsite Power Lost at St. Luicie 1 re sequence was:
een minutes after a manual reactor trip due to grid disturbances, a em undervoltage condition occurred which caused the reactor coolant s to trip.
diesel-generators started and loaded.
reactor was cooled down using natural circulation until off-site power restored (approximately 20 minutes).
hour later, off-site power was again lost and natural circulation cool-was used until off-site power was restored (one to one-and-a-half s later).
e action; rpose of failed system or component:
site power provides the preferred source of electric power to safety-ted equipment when the unit generator is not in operation.
ility of system per WASH .140G:* loss of offsite power: 2 x 10-5 /hr ility of component per WASH 1400:*
availabilitie are in units of per demand D-1 . Failure rates are in per hour HR-
No No Yes No C 125563 -. Actual Occurrence for Off-Site Power Lost at St. Lucie 1 ecific pumps providing AFW flow not specified.
No 2
3 4
5 6
7 8
9 10' 11 12 13 5563 - Sequence of Interest for Off-Site Power Lost at St. Lucie 1 cluded in mitigation procedures.
ON NU~MBER: 125563 June 16, 1977 T: May 16, 1977 ED: off-site power OLVED: unknown own INTEREST: loss of offsite power ENCE: reactor trip with loss of off site power
- St. Lucie 1 R: 50-335
- pWR RICAL RATING: 802 MWe 1.1 yr mbustion Engineering GINEERS: Ebasco Florida Power & Light Co.
12 muilea. SEA,f .J.ort. 1ierce, Fla.
/A ING CONDITION: tripped prior to loss of off-site power RE TYPE OF FAILURE: (a) inadequate performance; (b) failed to start; 0 made inoperable; (d) _________
THOD: during operation ER does not specify which AFW system components were used to provide ore cooling.