ML20198F950
| ML20198F950 | |
| Person / Time | |
|---|---|
| Site: | Washington Public Power Supply System |
| Issue date: | 05/05/1978 |
| From: | Nolan E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | Crews J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| Shared Package | |
| ML20198F952 | List: |
| References | |
| CON-WNP-1164 NUDOCS 8605290153 | |
| Download: ML20198F950 (1) | |
Text
i' s '
l
- ~
DISTRIBUTI0ft:
IE File i
- ntral File l
IE Rdg.
ROI Rdg.
ADFC Chron.
FJilolan
.May 5, 1973
(
l O ORA 100M FOR: J. L. Crw s, RV Q&bd FROM: F. J. Nolan IE: liq
SUBJECT:
REVISION TO QA TOPICAL REPORT - WASil!NGT0*i PUCLIC POWER SUPPt.Y SYSTDt (DPPSS) i Enclosed for your information is a letter, C. J. Heltenes.
Jr., to WPPSS relating to TfRC acceptance of Revision 3 to QA Topical Report tio. WPPSS-QA-C04
. itolan i L.
H elJ'd Coordination f DROI,IE:}fQ k
Enclosure:
i As stated f
r i
r e
I I
l l
i .
P-
~
FC:ROI:IE ADFC:ROI:IE 773480349 FJtiolan:LD JllSniezBkk