ML20210C744

From kanterella
Revision as of 14:34, 4 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Final Rule;Correction 10CFR170 & 171, Rev of Fee Schedule, 100% Fee Recovery,Fy 1999 Correction. Corrects Final Rule Appearing in Fr on 990610 (64FR31448),re Licensing,Insp & Annual Fees Charged to Applicants & Licensees
ML20210C744
Person / Time
Issue date: 07/14/1999
From: Funches J
NRC OFFICE OF THE CONTROLLER
To:
References
FRN-64FR15876, RULE-PR-170, RULE-PR-171 NUDOCS 9907270027
Download: ML20210C744 (4)


Text

m i

o DOCKET NUMBER 00CPRD PROPOSED RULEN 110 #11/ UN (GetFRI5976)

'99 JUL 19 All:15 C'

[7590-01-P]

Abjt NUCLEAR REGULATORY COMMISSION 10 CFR Parts 170 and 171 RIN: 3150-AG08 Revision of Fee Schedules; 100% Fee Recovery, FY 1999; Correction AGENCY: Nuclear Regulatory Commission.

ACTION: Final Rule; Correction.

i

SUMMARY

This document corrects a final rule appearing in the Federal Register on June 10,1999 (64 FR 31448), conceming the licensing, inspection, and annual fees charged to its' applicants and licensees in compliance with the Omnibus Budget Reconciliation Act of 1990.-

This a'ction is necessary to correct typographical and printing errors.

FOR FURTHER INFORMATION CONTACT: Glenda Jackson, Office of the Chief Financial Officer, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Telephone l 301-415-6057. O I

0 L( < l fi q-lfAI]I 9907270027:990714 f' PDR PR

({

170 64FR15876 PDR .  ;

f4b , lyn 1fA0f49 af WR369Ib  ;

I

.. e -

, SUPPLEMENTARY INFORMATION:

1. On page 31458, in the second column, in the first complete paragraph, in lines 17 and 18, the words "the NRC reviewer's title" are removed and replaced with "a brief description of the work being performed".
2. On page 31466, in the second column, under Sc(2), in the sixth line, the word "no" is removed.

9170.12 [ Corrected) s

' 3. ;On page 31470, in the first column, paragraphs (ii) and (iii) are redesignated as paragraphs (ii)(B) and (ii)(C), respectively, and a new paragraph (ii)(A) is added to read as follows:

(ii)(A) in the case of a design which has been approved but not certified and for which no application for certification is pending, if the design is not referenced, or if all costs are not i recovered within five years after the date of the preliminary design approval (PDA), or the final design approval (FDA), the applicant shall pay the costs, or remainder of those costs, at that time.

6171.15 (Corrected]

1 2

i i

1 4

4. On page 31475, in the second coluenn, the heading for @171.15 is corrected to read:

"$171.15 Annual Fees: Reactor licenses and independent spent fuel storage licenses."

@171.16 (Corrected] ,

5. We are correcting the table in 171.16(d)," Schedule of Materials Annual Fees and Fees for Government Agencies Licensed by NRC," in the following manner:
a. On pages 31477 through 31479, insert "$" before each amount listed under the heading " Annual feesi2a,-
b. On page 31477, under 1.B, remove the sentence "See 10 CFR part 171.15(c),"

and under the heading " Annual feesi2 ," insert ""N/A."

c. On page 31479, under 10.A, under the heading " Annual feesi2 ," the word "8N" is corrected to read "'N/A."

l

d. On page 31479, under 13.B, remove the sentence "N/A (See 10 CFR Part l l

171.15(c)," and under the heading " Annual feesi2 ," insert ""N/A."

l 1

3  ;

e. On page 31479, footnote 11 is added to read as follows: "" Annual fees for this category of licenses are assessed under 10 CFR 171.15(c)."

Dated at Rockville, Maryland, this M day of b A+ .1999.

/ 0 For the Nuclear Regulatory Commission sse L. Funches, Chief Financial Officer.

4

.