ML20210U406

From kanterella
Revision as of 12:18, 2 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of Contract Execution: Extended Fatigue Life Evaluation Methods for Aged LWR Components (Sbir Phase Ii), Awarded to O'Donnell Consulting Engineers,Inc
ML20210U406
Person / Time
Issue date: 09/26/1986
From: Mclearen T
NRC OFFICE OF ADMINISTRATION (ADM)
To: Arlotto G, Weidenhamer G
NRC, NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
Shared Package
ML20210U410 List:
References
CON-FIN-D-1704, CON-NRC-04-86-128, CON-NRC-4-86-128 NUDOCS 8610090511
Download: ML20210U406 (1)


Text

- _ _ _ _ _ _ _ _ _

9 s NXC FORM 255 CONTRACT NUMBER (10 768 NRC-04-86-128 OtVISION OF CONTRACTS MOOiFICATION NUMBER U.S. NUCLE AR REGULATORY CGMMISSION WASHINGTON. D.C 20555

@ NEw 0 MOoirlCATION OTHE R (Specorv i NOTIFICATION OF CONTRACT EXECUTION CONTR/CT BASED ON:

TO: G. Arlotto, Director AuTHOuizATION NUMBE R (Tottel Division of Engineering Technology RES-86-128 Office of Nuclear Regulatory Research DATE

(, ( ' '"['*"# 7/8/86 j FROM:

ere [ 7 f CONTRACT CHANGES PER THIS ACTION (Coatrect Spec *etosti ( (car'ef Contract Negotiation Branch No. 1 OlVISION OF CONTRACTS. ADM CONTR ACTOR IName & Location / EXECUTION DATE 0'Donnell Consulting Engineers, Inc.

3611 Maplevue Drive Tvee OF CONTRACT Bethel Park, PA 15102 CPFF PROJECT TITLE PERIOD OF PERFORMANCE 9/30/86 - 3/30/87 Extended Fatigue Life Evaluation Methods for Aged LWR Components eRiNCIPAL INVESTIG ATOR (SBIR Phase II)

Dr. William J. O'Donnell NRC AUTHORIZED REPRESENTATIVE Gerald Weidenhamer X-37870 B&R NUMBER FIN NUMBER 601910 D1704 NEW NRC FUNDS S 75,000.00 FUNDING J TOTAL FY 86_ FUNDING S 75,000.00 TOTAL NRC OBLIGATIONS S 75,000.00 GOVERNMENT PROPERTY ATTACHMENT (SI:

NRC-04-86-128 8610090511 860826 PDR CONTR CONTR ACT DOCUMENT (

NRC FORM 255 NRC-04-86-128 PDR 110 763

-. __