Event meets ACD2-RG-044 App. B N.1 'The licensee shall notify the NRC Operations Center of any event or situation, related to the health and safety of the public or onsite personnel, or protection of the environment, for which a news release is planned or notification to other government agencies has been or will be made. Such an event may include an on-site
fatality or inadvertent release of radioactively contaminated materials.'
Received preliminary notification from TestAmerica Colorado that there was an exceedance of the Total Suspended Solids NPDES [National Pollution Discharge Elimination System] permit limit at Outfall 013. This was not unexpected with the current state of the settling pond above Outfall 013. An Ohio EPA [OEPA] 24 Hour non-compliance notification form was filled out and sent it to our OEPA NPDES inspector.
Notification concurrent to the OEPA notification.