ML20211H900

From kanterella
Revision as of 16:02, 6 May 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Staff Requirements Memo Re 860611 Meeting W/Advisory Panel for Decontamination of TMI-2 in Washington,D.C.Nrc Must Identify Issues Requiring Panel Input & Examine Ways to Increase Credibility of Psychiatric Studies
ML20211H900
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 06/24/1986
From: Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
To: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
References
REF-10CFR9.7 M860611A, NACTMI, NUDOCS 8606260113
Download: ML20211H900 (1)


Text

IN RESPONSE, PLEASE g

f'p or bo UNITED STATES REFER TO: M860611A

,9' ";, , NUCLEAR REGULATORY COMMISSION W ASHIN GTON, D.C. 20555

{

June 24, 1986 OFFICE OF THE SECRETARY MEMORANDUM FOR: Victor Stello, Jr.

Executive Director for O cations

]

FROM: Samuel J. Chilk, Secretg r p

SUBJECT:

STAFF REQUIREMENTS - PERJ DIC MEETING WITH ADVISORY PANEL FOR THE DECONTAMINATION OF TMI-2, 11:00 A.M., WEDNESDAY, JUNE 11, 1986, COMMISSIONERS' CONFERENCE ROOM, D.C. OFFICE (OPEN TO PUBLIC ATTENDANCE)

The Commission met with the Advisory Panel for the Decontamination of TMI-2 to receive local community _ input on the efforts of decontaminating TMI-2. The Panel was represented by:

- Arthur Morris, Chairman

- Kenneth L. Miller

- Frederick S. Rice

- Joel Roth

- Thomas Smithgall

- Niel Wald

- John Luetzelschwab The Commission requested the staff to review the remaining tasks and major milestones required to complete TMI-2 cleanup and identify the issues which require input of the Panel. The staff is to discuss the issues with the Panel and then submit a paper for Commission consideration to determine an end point for the 1

activities of the Panel.

(TMIPO) (SECY Suspense: 12/31/86) i The Panel recommended that the next meeting with the Commission

~

be scheduled for September or October to discuss GPU's plans for water disposition and defueling of the plant.

Chairman Palladino requested the staff to examine ways to help increase the credibility of various studies dealing with cancer, pregnancy, and psychiatric problems.

< cc: Chairman Palladino Commissioner Roberts Commissioner Asselstine Commissioner Bernthal Commissioner Zech Commission Staff Offices DR - Advance DCS - 016 Phillips i

8606260113 860624 PDR 10CFR PT9.7 PDR