ML20211N750

From kanterella
Revision as of 23:48, 5 May 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Staff Requirements Memo Re SECY-99-203 Re Regulatory Guide for Updated Final Safety Analysis Repts in Accordance with 10CFR50.71(e).Commission Approved Publication of Reg Guide 1.181 with Listed Clarifications
ML20211N750
Person / Time
Issue date: 09/08/1999
From: Vietticook A
NRC OFFICE OF THE SECRETARY (SECY)
To: Travers W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
References
REF-10CFR9.7, RTR-REGGD-01.181 SECY-99-203-C, NUDOCS 9909130061
Download: ML20211N750 (2)


Text

7 L

3.......................

( , ,,,%  !

RELEASED TOTHE PDR  :

UNITED STATES

  • y  ; NUCLEAR REGULATORY COMMIS$ON [

{ $ WASHINGTON, D.C. 20555-0001 dat0 if)hl3 ;

f ........................

  1. September 8, 1999 SECRETARY MEMORANDUM TO: William D. Travers f '

Executive Director for Operations FROM: Annette L. Vietti-Cook, Secretary

SUBJECT:

STAFF REQUIREMENTS - SECY-99-203 - REGULATORY GUIDE FOR UPDATED FINAL SAFETY ANALYSIS REPORTS IN ACCORDANCE WITH 10 CFR 50.71(e)

The Commission has approved publication of the regulatory guide, RG 1.181, with the following clarifications, as one acceptable method for compliance with 10 CFR 50.71(e).

1. The staff should inform the Commission of the results of its efforts to monitor future updates to plant FSARs as discussed in SECY-99-203, including 1) an assessment of whether the guidance for FSAR updates or design bases or both needs to be modified, and 2) whether additional regulatory oversight is warranted. In performing its assessment, the' staff should ensure a representative sample of FSARs is examined.

(EDO) (SECY Suspense: 3/30/2001)

2. The last paragraph in the "B. DISCUSSION" section of RG 1.181 should be modified to read:

1 sentence:

"...the NRC staff comments, and the clarification of Regulatory Position C.5 of DG-1083." )

3* sentence: l

" the NRC staff's comments, and addresses the concerns of Regulatory Position C.5 from DG-1083."

3. Because the definition of design basis information has a direct impact on the FSAR content, current staff effort to develop the regulatory guide for design basis should ensure that it is consistent with the guidance on updating FSARs. In addition, the staff should explore ways to expedite completion of the final regulatory guide for design basis (scheduled for 5/2000) so that these two guides can be implemented concurrently.

f i pro'S o l

. .s wp on s3 9909130061 990908 PDR 10CFR PT9.7 PDR l

7

\

cc: Chairman Dieus Commissioner Diaz Commissioner McGaffigan Commissioner Merrifield OGC CIO CFO OCA OlG OPA Office Directors, Regions, ACRS, ACNW, ASLBP (via E-Mail)

PDR DCS d

i I

l I

i l