ML20217C266

From kanterella
Revision as of 07:38, 5 March 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ltr Contract:Task Order 6 Under Contract NRC-04-97-036 Entitled Regulatory Analysis Support to Fuel Facility Safety
ML20217C266
Person / Time
Issue date: 09/29/1997
From: Mace M
NRC OFFICE OF ADMINISTRATION (ADM)
To: Colina I
SCIENCE & ENGINEERING ASSOCIATES, INC.
References
CON-FIN-J-5208, CON-NRC-04-97-036, CON-NRC-4-97-36 NUDOCS 9710010316
Download: ML20217C266 (2)


Text

. . -

7 Office of the General Counsel, U.S. Nuclear Regulatory Commission, Washington, DC 20555 0001, and to M. Stanford Blanton, Esq., Balch and Bingham, Post Office Box 306, 1710 Sixth Avenue North, Birmingham, Alabama, attorney for the licensee.

Nontimely filings of petitions for leave to intervene, amended petitions, supplemental petitions and/or requests for hearing will not be entertained absent a determination by the Commission, the presiding officer or the presiding Atomic Safety and Licensing Board that the petition and/or request should be granted based upon a balancing of the factors specified in 10 CFR 2.714(a)(1)(l)-(v) and 2.714(d).

- For further details with respect to this actior , see the applicat%n for amendments dated September 17, Igg 7, which is available for public inspection at the Commission's '

Public Documeret Room, the Gelman Building,2120 L Street, NW., Washington, DC, and at the local public document room located at the Houston Love Memorial Library,212 W.

Burdeshow Street, Post Office Box 136g, Dothan, Alabama.

Dated at Rockville, Maryland, this 19thday of September 1997.

FOR THE NUCLEAR REGULATORY COMMISSION

)) s Jacob 1. Zimmerman, Project Manager Project Directorate ll 2 Division of Reactor Projects 1/ll Office of Nuclear Reactor Regulation

IXO Sco e* a UNITED STATES 3 NUCLEAR REGULATORY COMMISSION WASHINGTON D.C. 20h0001 o..../

Science & Engineering Associates. Inc.

tEP ? 91997 SEA Plaza "

Attn: llene Colina 6100 Uptown B1vd.. NE Albuquerque, New Mexico 87110

Dear Hs. Colina:

Subject:

Task Order No. 6 under Contract No. NRC-04 97-036 Entitled " Regulatory Analysis Support to Fuel Facility Safety" In accordance with Section G.5, Task Order Procedures, of the subject contract. this letter definitizes Task Order No. 6. This effort shall be performed in accordance with the revised technical proposal dated September 25, 1997. which is hereby incorporated by reference.

The period of performance for Task Order No.6 is October 1. 1997 through July

31. 1998. The total cost ceiling for the task order is $172.218. The amount of $159.500 represents the total reimbursable costs and the amount of $12,718 represents the fixed fee.

Accounting data for Task Order No. 6 is as follows:

B&R No.: 750-15-211-000 - -

Job Code: J5208 B0C Code: 252A A)propriation No.: 31X0200

0) ligated Amount: $85.593 The amount currently obligated by the Government with respect to this task order is $85,593, of which the sum of $79.253 represents the estimated reimbursable costs, and of which $6,340 represents the fixed fee. It is estimated that the amount currently allotted will cover performance through December 31, 1997.

The following individuals are considered by the Government to be essential to the successful performance of the work hereunder: )]4 Il y Mr. Frank Sciacca Ms. G. Vergara O Mr. K. Weingardt Dr. W. Thomas The contractor agrees that such personnel shall not be removed from the effort under this task order without compliance with Contract Clause H.1-1;.g.y Personnel The issuance of this task order does not amend any terms or conditions of the subject contract.

9710010316 970929 E -Ok S O36 PDR lfhh k M. -

g gy: 3 23 37 : 10:21 : SEA ABQ 7111 nR- 301 415 8157: 3/ 3 FROM DIU154CH CF COHf0CCf6 328 485 ST61 49.39.1997 39:4a 0, 3 4

SEA,Inc.

r g NRC-04-97 036 Page 2 of 2 Your contacts during the course of this task order are: '

Technical Matters: MichaelMarshall,ProjectOfficer (301)4155895 i Contractual Matters: RoseNeryMann.ContractSpecialist (301) 4a5 6595  :

Please indicate your acceptance of this task order by having an official authorized to bind your organization execute three copies of this docume,nt .

the space provided and return two cop,ies to the Contrect should retain the third copy for your records. You Specialist.

1 Sincerely, i -

Har H see. Contre ing Officer  !

Con r Management Scanch 1 Divisi ofContracts '

Office of Administratia)

Enclosure:

As stated ACCEPTE0: TASK ORDER NO. 6 k.

51 .

nn.c &taa Guda- -

9 /27 /9 7 DATE i

t l

i

_ _ - _ _ - - _ _ - -