Forwards NRC Resident Ofc Status Rept for 871023-1105
ML20236M386
Person / Time
Site:  Constellation icon.png
Issue date: 11/09/1987
From: Linville J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8711130111
Download: ML20236M386 (4)


Text

, .

m M, . ,

1

.a r

l

+ '

09 NOVi1987 Docket Nos.. 50-277' l

'50-278.

]

MEMORANDUM FOR: William F. 'Kane,: Director, Division of Reactor' Project's1

'FROM: ' J. C. Linville, Chief, Reactor' ProjectsiSection~ 2A' ,

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION STATUS REPORT FOR THE'-

' PERIOD October 23 - November 5, 1987.- -

Enclosed is the' Peach Bottom periodic status report from/the' NRC Resident-Office at Peach Bottom. .Three.NRC. resident inspectors l monitored activ'ities.

at the plant during the report' period.

~

These status reports are intene'ed to provide NRC management and the public with an overview of plant activities and-NRC inspection activities. Subsequent ~

~

inspection reports will' address many of.these 'topicsLin:more detail.

Sign

-James'C. Linville, Chief  :

Reactor Projects.Section PA'. .j

Enclosure:

As. Stated I

1 l

1 i

0FFICIAL RECORD COPY: PB'-STATUS / REPORT - 0001.0.0l j

O'71'1130111 871109 . . . 11/09/87 jor mocooggy Q l, p ,

m- -- -- . - _-

1 '

E 1

William F. Kane 2 Qhg iggy j l

cc w/ encl: l Dickinson M. Smith,. Manager, Peach Bottom-Atomic Power S'ation t 1 John S. Kemper, Senior Vice President, Engineering and Production I Thomas S. Shaw, Jr. , Vice President, Production {

Troy B. Conner, Jr. , Esquire i W. H. Hirst, Director, Joint Generation Projects Department, d Atlantic Electric .

G. Leitch, Nuclear Generation Manager l Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report) 'l Raymond L. Hovis,. Esquire Thomas Magette, Power Plant. Siting, Nuclear Evaluations ],

W. M. Alden, Engineer in Charge,- Licensing Section Doris Poulson, Secretary of Harford County Council J Public Document Reom (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector i Commonwealth of Pennsylvania bec w/encis: -

Region I Docket Room (with concurrences) '

J. Taylor, EDO T. Murley, NRR R. Starostecki, NRR F. Miraglia, NRR S. Varga, NRR

9. Boyer, NRR W. Butler, NRR R. Martin, NRR W. Rutsell, RI W. Johnston, RI T. Martin, RI ,

S. Collins, RI  !

R. Gallo, RI  !

K. Abraham, RI M. Miller, RI J. Williams, RI L. Scholl, RI l

i 1 l

RLDP .,,h, W. - , e ,

11M/87 11/O{/87 0FFICIAL RECORD COPY PB STATUS REPORT - 0002.0.0 j 11/09/87

1

. r ENCLOSURE PEACH BOTTOM ATOMIC POWER STATION STATUS REPORT FOR'THE PERI'00-October 23 - November 5, 1987 1 1.0 Plant Status As of 8:00 a.m. on November 5,1987, Unit 2 and- 3 are in a cold condition per the March 31, 1987,'NRC Order with coolant temperatures less than 200 -

degrees Fahrenheit. The Unit 3 core is completely off loaded.

2.0 Facility Operations Summary j Unit 2 is completing a refueling outage which began March 13, 1987.

Final work is being performed to support the reactor pressure vessel .

hydrostatic test. Unit 3 has been in a cold condition per the March 31, I 1987, NRC Order since April 1, 1987. The Unit 3 recirculation system l pipe replacement outage is in progress. The Unit 3 core off load was d completed on October 28, 1987. In .adition, twenty-two control rod blades have been exchanged and twelve local power range monitor strings are currently being exchanged.

3.0 Items of Special Interest A public meeting was held on November 4, 1987, in Lancaster County, i Pennsylvania, to receive public comments on the' Philadelphia Electric j Company (PECo) Commitment to Excellence Action Plan. Fourteen people  ;

spoke to express their views on this Plan.  ;

4.0 Other Items of Interest 4.1 The licensee has implemented the following shift operations organizational changes:- (1) J. Cotton assumed the duties-of Super-intendent, Operations on October 23;'and (2) the Shift Managers assumed the duties previously held by the Shift Superintendents effective 11:00 p.m. on October 25. In addition, on October 23 the following announcements were made regarding the proposed PECo corporate / plant reorganization: (1) M. J. McCormick, Peach Bottom Plant Manager; and -(2) K. Powers Peach Bottom Project Manager. ,

4.2 On October 26, Unit 3 received a spurious triple low reactor water )

level signal. A blocking permit hari been applied to a Yarway level -

j indicating switch so that it could be replaced. 'After the permit >

was applied, maintenance, personnel tried to dr?.in the water in the switch and went beyond the boundary of the permit. Subsequently, i the entire variable leg header was drained, causing the unplanned 'I triple low signal. The only actions that occurred were a Unit 3 l high pressure service water (HPSW) pump trip and a loss of shutdown j cooling (SOC) at Unit 2. Operators manually secured SDC on Unit 3  ;

when the HPSW pump tripped. Operators restored SDC at tsoth units 1 within three minutes.

l OFFICIAL RECORD COPY PB STATUS REPORT - 0003.0.0 l 11/09/87 l

l- - _- -- -_ _= - -- _ _ - - - - _ _ _ - -- _ - - - . _ - - - _ _

- ___ j

2

-s  ;

i 4.3 LThe licensee's security organization conducted a search of the Peach-Bottom site from 3:00 a.m. to 6:00 a.m. on October 30, using five- 1 teams composed of trained drug dogs, handlers, Pennsylvania State l Police, and PECo security representative. The' search encompassed  !

areas both inside and outside the. Peach 6 : tom 2 & 3 protected l areas. The search teams were complimented by forensic experts and ]

licensee site security and station. management. No contraband was 1 found. The licensee's investigation.into alleged drug activities is q continuing. All three NRC resident inspectors were on site and  !

observed the search activities.

The resident' inspectors are following the licensee investigations and I corrective actions'regarding these' occurrences. ,

5.0 NRC Activities During the Period l l l

Three NRC Resident Inspectors were assigned to monitor plant activities I between October 23 and November 5, 1987. These individuals consisted of the following:

1 Thomas P. Johnsor - Senior Resident Inspector Richard J. Urban - Resident Inspector Larry E. Myers - Resident Inspector l t

Areas inspected included operational safety, shutdown order commitments, radiation protection, physical security, control room activities and demeanor, reportable events, surveillance testing, outage activities, maintenance, and outstanding items, i An inservice tdsting team inspection was perfonned at Peach Bottom by - i region based inspectors complimented by an NRC headquarters individual -l and a contractor from November 2 --November 6, 1987.

{

Three region based inspectors were also on site the week of November 6. l One inspector was reviewing existing unresolved items, one inspector was i reviewing recirculation pipe replacement activities, and one inspector  !

was reviewing refueling cavity bellows seals.

The results of these inspections will be included in a future status- ,

report. l NRC Combined Inspection Report 50-277/87-18 and 50-278/87-18 was issued October 28, 1987. The inspection was an Environmental Qualification (EQ)

Team inspection conducted June 15 - 19, 1987. A review was conducted concerning the EQ program for establishing and maintaining the qualifica-tion of electrical equipment important to safety within the scope of 10 CFR 50.49. No violations were noted.