Enforcement Conference Rept 50-286/89-15 on 890808.Major Areas Discussed:Security Program During Spring 1989 Plant Outage
ML20247B953
Person / Time
Site: Indian Point 
Issue date: 08/24/1989
From: Keimig R, Lancaster W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20247B949 List:
References
50-286-89-15-EC, EA-89-155, NUDOCS 8909130194
Download: ML20247B953 (9)


See also: IR 05000286/1989015

Text

. . _ _ _ _

- _ _ _ _ ,

. .

. . o

.

...

~

'

U.S. NUCLEAR REGULATORY COMMISSION

REGION I

Report No. 50-286/89-15

DbcketNo. 50-286

,

License No.- DPR-64

Licensee: Power Authority of the State of New York

P. O. Box 215

Buchanan, New York 10511

Facility Name: Indian Point 3 Nuclear Power Plant

' Type of Meeting: En_forcement Conference

Enforcement Action No: 89-155

Meeting Date: . August 8, 1989

Prepared by: d

Lanca ter, Physict'f Security Inspector

tf-M-PP

date

'

W .K.

Approved by: y Nm k-u -69

R. R. Keiinig, Chief 7 Safeguards Section date

Facilities Radiological Safety and

Safeguards Branch

Meeting Summary: An Enforcement Conference was held at Indian Point 3 Nuclear

Power Plant, in Buchanan, New York, on August 8, 1989, to discuss the findings

of NRC/RI Inspection No. 50-286/89-15 and the licensee's response (dated

July 12, 1989) to previous NRC Escalated Enforcement Action (dated

June.12,1989). Before the conference, the meeting attendees toured the plant

and site to review the areas where the licensee's security program was found

deficient during NRC Inspection Nos. 50-286/89-05, 50-286/89-06 and

50-286/89-15. These' inspections covered various aspects of the security

program during the Spring 1989 plant outage. During the last inspection

(89-15), violations of NRC requirements were identified as follows: failure

to conduct adequate searches of personnel and packages entering the protectad

area (recurrent violation); failure to provide adequate illumination within the

protected area at night (recurrent violation); failure to provide adequate

assessment capabilities on'the protected area perimeter (recurrent violation);

and, failure to provide adequate compensatory measures for a degraded vital

area barrier. The tour and meeting was attended by NRC and licensee management

personnel and lasted about 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> cach, during which the circumstances

surrounding the violations and the licensee's corrective actions were

discussed.

8909130194 890906

i PDR ADOCK 05000286

L

Q FDL

- - ____ _ _-- -. .-

_ _ _ - _ _ _

. . . .

I

..

!

DETAILS

1. Meeting Attendees l

i

a. Power Authority of the State of New York

J. Brons, Executive Vice President

W. Josiger, Resident Manager

  • J. Russell, Superintendent of Power

W. Harrington, Corporate Director of Security

J. Hahn, Manager of Security

  • M. Peckham, Assistant to Resident manager

b. Nuclear Regulatory Commission

M. Knapp, Director, Division of Radiation Safety and Safeguards

G. Hunegs, Resident Inspector, Indian Point 3

R. Keimig, Chief, Safeguards Section

D. Holody, Enforcement Officer

  • H. Wang, NRR, Inspector

W. Lancaster, Physical Security Inspector

  • D. Neighbors, NRR, Project Manager
  • did not participate in the tour

2. Summary of Discussion

Mr. Knapp opened the meeting and the attendees were introduced.

Mr. Knapp described the purpose of the enforcement conference and

summarized the findings of the routine physical security inspection

conducted on June 5-7, 1989. (NRC Inspection 50-286/89-15).

Mr. Knapp expressed Region I's concerns regarding the apparent violations

and noted the following:

a. Failure to provide adequate assessment capabilities for portions of

. protected area barriers and associated isolation zones was a

recurrent violation;

b. Inadequate lighting in portions of the protected area was a

recurrent violation;

c. Numerous examples of inadequate searches of personnel and

hand-carried items prior to entry into the protected area was a

recurrent violation; and,

d. Failure to establish adequate compensatory measures for degraded

vital area barriers was indicative of poor supervisory oversight.

Several other concerns were raised by the NRC attendees during the

enforcement conference, which included: the lack of a comprehensive

I

. _ _ . _ _ - _ _ _ _ _ - - . - - - _ - - -_- _-

,- . .

,

.

.

2-

i

response by the licensee.to the recent escalated enforcement action; the

. apparent inadequate management attention to the security program; poor

security force morale;' untimely implementation of compensatory security .

measures; the apparent lack of security training program effectiveness;

incomplete post orders and procedures; the-apparent complacency exhibited

by the security. force and its supervision; and the absence of physical

security program upgrades and enhancements.

Mr. Josiger opened the meeting for the licensee and then introduced

Mr. Brons, who made some general remarks. Mr. Josiger then stated that

the licensee concurred with the four violations and discussed the

violations and corrective-actions in detail ,(See Attachment A).

In commenting on the recurring violations, Mr. Josiger stated that the

licensee had since questioned the overall effectiveness of the program

and intended to take comprehensive actions to correct all identified

weaknesses. Mr. Hahn stated that the security force and security

managers had become overly complacent in implementing the security

program at the Plant, in part, because of the previous Category 1 SALP *

ratings that the program had received. Mr. Josiger also discussed other

corrective actions for self-identified.veaknesses already undertaken and

~

being planned as a result of a comprehensive audit by an independent

consultant that found weaknesses similar to those found by the NRC

inspections. (See Attachment A)

M'r. Josiger closed by stating that it would take time and considerable

management attention to correct the security program problems. He also

stated that he believed the licensee had undertaken a responsible and

comprehensive plan to accomplish that.

Conclusion of Meeting

Mr. Keimig commented on several of the positions expressed by the

licensee's representatives and emphasized the importance of all members

of the security organization understanding the NRC's security program

performance objectives.

.

Mr. Knapp concluded the meeting by stating that the Region I staff would

evaluate the information presented by the licensee during the enforcement

conference, and that a decision regarding the appropriate enforcement

action would be forthcoming. Mr. Knapp also stated that the licensee's

corrective actions discussed at this meeting appeared to be much more

comprehensive in scope and depth than those discussed at the previous

enforcement conference on April 28, 1989, and those documented in the

licensee's July 12, 1989, letter in response to the previous escalated

enforcement.

L i

C_____________.._ ___ .___.. }

..

c..

~ ~

V ATTACHMENT A

.

..

n*  ;

I

INDIAN POINT UNIT 3

NRC SECURITY ENFORCMENT CONFERENCE

AUGUST 8, 1989

l

INTRODUCTION---Opening Remarks f

VIOLATION RESPONSE:

The Authority concurs with with the NRC violations

identified in Inspection Report 89-15:

  • UOI )
  • . LIGHTING
  • SEARCHES .J

( SGI ) VITAL AREA

The 3 unresolved items 1dentified in Inspection 89-05 have

been reviewed and accepted by the Authority:

'

  • k.IAUVERS
  • VITAL AREA -- ( 36I)

All violations and unresolved items identified in Inspection

Reports 89-05 and 89-15 have corrective and compensatory

measures.in place with long term resolutions planned.

MANAGEMENT REVIEW FOR PROGRAM WEAKNESSES ,

The Authority with the use of in-house staff and contract

support, has performed an in-depth review of the Security

Program and its implementation including equipment,

staffing, and management.

RESULTS

  • identified weaknesses are under review and

corrective measures are planned or are in place.

CORRECTIVE MEASURES

l MANAGEMENT / PEOPLE

  • Interactive meetings have been conducted. Plant

and security management personnel have met with

all Security Supervisors and Security Officers.

These meetings have been conducted to inform all

personnel of the recent NRC findings and

violations, proposed corrective actions and to

1

_ - _ - _ - _ _ _ _ _ _ - _ _ _ - _ _ _ - _ -.

-.

.

. .

.

\- .

INDIAN POINT UNIT 3

NRC SECURITY ENFORCMENT CONFERENCE

AUGUST 8, 1989

provide a mechanism for involving all employees in

the solution of identified issues.

  • A joint committee (management and union) has been

formed to review post duties and procedures.

  • Weekly staff meetings between the Security Manager

and night and day Security Shift Coordinators have

been instituted.

  • Security issues have been given an increased

priority at the daily management meeting--daily

reports are required instead of periodically as in

the past.

  • A 40 hour4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> training course given by a former NRC

Security Inspector is required for all Security

Management personnel. (50% complete with 100%

completion by September 1,1989).

  • A one day Supervisors Awareness training course

has been conducted and is complete.

  • The Security Guard force has been supplemented

with contract personnel. This measure will remain

in place until the need for permannent

augmentation is assessed and until the current

improvement program has been completed.

  • Weekly tours with the, Security Manager, the I&C

Superintendent and ths Maintenance Superintendent

to assure Security equipment needs are promptly

and adequately addressed have been instituted.

  • Two (2) Instrumentation and Controls Technicians

and two (2) Maintenance Mechanics have been

permanently assigned to work Security Corrective

and Preventative Maintenance on a full time basis.

  • A temporary assignment of an Electrical Engineer

to the Security Department is under consideration.

2

l

l

_. _ ._ - _ _ _ _ _ __ _ _

.

. .

.

,.

-

.,

INDIAN POINT UNIT 3

NRC SECURITY ENFORCNENT CONFERENCE

AUGUST 8, 1989

  • Comprehensive In-house and contractor evaluations

have been performed:

  • Barry Associates
  • Quality Assurance
  • Security Performance Indicators have been

established (SEE ATTACHED).

EQUIPMENT

  • ( M Survey completed

-Results are under review

  • (b b overhaul currently in progress-
  • Lighting survey completed

- additional lighting will be added

- nightly reports on lighting by the Security

coordinator to insure adequate compensatory.

measures and feedback to the maintenance staff

are required.

  • Modifications to vitalize the ( SGI )

Building are now in progress.

  • Louvers will be hardened to address the NRC

unresolved items (Compensatory measures are

currently in place).

  • other modifications are planned (SEE ATTACHED)
  • Security Facilities

-additional space in two story building

-long term modifications to Access Facility

CIDSING RENARKS

3

fL

-. . _ - _ - _. _ _ _ _ _ _

.

-

,

.

.Q, + 9

INDIAN POINT UNIT 3

SECURITY DEPARTMENT PERFORMANCE INDICATORS

1. Compensatory Actions

2. Compensatory Actions--average time in place

3. Preventative / Corrective Maintenance Ratio

4. False Alarms--% equipment problems

5. False Alarms--% others

6.~ Work Requests for Security equipment--total

7. Work Requests for Security equipment >l week outstanding

8. Work Requests for Security equipment > 30 days outstanding

9. Worker absenteeism rate

10. Worker overtime rate

11.. Number of shifts greater than 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />

12. Turnover rate

13. Incidences of security mandatories

_ _ _ _ _ - _ .

. _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ - _

.

,

pa

1'

THIS SHEET CONTAINS.

SAFEGUARDS INFORMATION

AND IS INTENTIONALLY BLANK.

i

.___-__________-__--__ _ - -_ _ a

,. . .- _ - _. _ _ _ _ _ _ _ _

.. ,. .

..

'

..'

THIS SHEET CONTAINS

SAFEGUARDS INFORMATION

AND IS INTENTIONALLY BLANK.

.

l

l

l

l

f .

_ _ - _ _ _ _