Discusses Review of Remedial Action Insp Plan,Rev B for Green River Umtrap.Plan Not Current Since DOE Changed Cover Design Philosophy for Complying W/Groundwater Protection Stds
ML20247G328
Person / Time
Issue date: 03/24/1989
From: Tokar M
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Fliegel M
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
REF-WM-68 NUDOCS 8904040197
Download: ML20247G328 (2)


Text

_ - - _ _ - . _- . - _ _ . _ - _ . __ _ _ _ _ _ _ _ _ ___

l  :.

v . ..

gg 14 NS MEMORANDUM FOR: Myron Fliegel, Section Leader Operations Branch Division of Low-Level Waste Management.

and Decommissioning, NMSS FROM: Michael Tokar, Section Leader Technical Branch Division of Low-Level Waste Management and Decommissioning, NMSS

SUBJECT:

REVIEW 0F RAIP, Rev.B- GREEN RIVER UMTRA PROJECT

REFERENCES:

1. Letter from W. J. Arthur, III of DOE to P.

Lohaus of NRC, dated December 19, 1988; Remedial Action Inspection Plan for Green River, Utah, Revision B

2. Letter from M. Tokar to M. Fligel, dated Marc 25, 1989; Technical Evaluation Report for the Green River, Utah, UMTRCA project.

The geotechnical engineering aspects of the Remedial Action Inspection Plan, Revision B, (RAIP) for the Green River UMTRCA project have been reviewed.

This version of the RAIP incorporates most of the staff comments made on the previous version. However, as stated in the DOE letter, the RAIP is not current because the DOE has changed their cover design philosophy for complying with the groundwater protection standards. The staff has reviewed the DOE's Final Design documents and Remedial Action Plan (RAP) for this project and has documented their evaluation in a Technical Evaluation Report (TER). The staff  !

has identified several issues in the TER that preclude final concurrence in  ;

the DOE's design. The issues that would affect the provisions in the RAIP are:

(1) frequency of placement moisture and density tests to verify compliance with  !

the specifications (Section 6.1.5 of RAIP); (2) obtaining as-compacted samples  !

of radon barrier material to perform laboratory tests (TER Section 3.6); and l (3)additionaltestssuchasAtterberglimitstestsonradonbarriermaterial, I if the specifications are revised (TER Section 3.6). It is recommended that the review of this RAIP document be defferred until the issues identified in i

the TER are resolved and a reviser RAIP is submitted by the D0E.

l This review was performed by Banad Jagannath; please contact him should l you have any questions.

cb Michael Tokar, Section Leader '

Technical Branch Division of Low-Level Waste Management lf Ih and Decommissioning, HMSS f 890324

. m g

  • $ e t' 4

., /*

GRNRAIP/BJ

.2-Distribution:.

Central;Fjle t WM-68 b A RBangart, R IV JGreeves, LLWM MBell, LLRB

' JSurmeier, LLTB PLohaus, LLOB

! MTokar, LLTB DJagannath, LLTB

.SWastler, LLOB-LJahandari,LLTB rf JJones, LLOB rf-NMSS rf PDR YES @

PDR NO / -/ Category: Proprietary / / or CF Only / / _

ACNW YES @ NO / /

SUBJECT ABSTRACT: Geotech RAIP for Green River w m- Gi 0FC :LLIB :LLTB :LLOB :LLWM :LLWM :NM55 :NM55

.. ... fac ........ ... W -.................___--.....--

NAME:BJagannath/jj :MTokar  :  :  :  :

DATE: 3 /,4 /89 :7 /2//89 f  : / /89 : / /89 : / /89 : / /89 : / /89 0FFICIAL RECORD COPY