ML20260F079
From kanterella
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ML20260F079 | |
Person / Time | |
---|---|
Site: | Wolf Creek, Callaway ![]() |
Issue date: | 04/04/1979 |
From: | BECHTEL GROUP, INC. |
To: | STANDARDIZED NUCLEAR UNIT POWER PLANT SYSTEM |
Shared Package | |
ML19321B282 | List:
|
References | |
CON-10466 A-0326, A-326, NUDOCS 8007300546 | |
Download: ML20260F079 (1) | |
Similar Documents at Wolf Creek, Callaway | |
---|---|
Category:DRAWINGS
MONTHYEARML20266H3731998-01-0808 January 1998
[Table view]Schematic Diagram Component Cooling Water Pump C ML20266H3901998-01-0606 January 1998 Schematic Diagram Component Cooling Water Pump a ML20266H3771997-12-0404 December 1997 Schematic Diagram Essential SVC Water Pump a ML20266H3941997-11-13013 November 1997 Schematic Diagram 4.16 Kv DG NE02 Feeder Breaker 152NB0211 ML20266H3801997-06-15015 June 1997 Load Shed Relay Outputs ML20266B4521997-04-0404 April 1997 List of Loads Supplied by Emergency Diesel Generator ML20266H3871996-01-19019 January 1996 Schematic Diagram Motor Driven Auxiliary Feedwater Pump a ML20265B0291995-10-26026 October 1995 NPDES Outfalls Receiving Streams Map ML20265B0251995-10-26026 October 1995 NPDES STORM Water Information Outfalls 010-015 Refuel 7 ML20265B0211995-10-26026 October 1995 STORM Water Outfalls 010-015 Topographical Map & Drainage Areas ML20265B0171995-10-26026 October 1995 NPDES STORM Water Information Outfalls 010-015 ML20265A6271995-06-27027 June 1995 Outline/Assembly for Fuel Pool Cooling Heat Exch ML20265A5961995-06-18018 June 1995 Standardized Nuc Unit Power Plant System Projects RCS Equipment Supports SG Upper Lateral Supt Gen Arrgt ML20265A5911995-05-17017 May 1995 Letdown Heat Exchanger ML20266H3831995-04-27027 April 1995 Sequencer Relay Outputs ML20265A6221995-04-17017 April 1995 Outline Drawing 37 Kxh 2 Stg Type VCT ML20265A6181995-04-17017 April 1995 Fabricated Steel Bedplate W/Drip Pan & Drain on Pump End ML20265A6321995-04-0505 April 1995 General Arrangement ML20265A6081995-04-0505 April 1995 Pump & Motor Outline.Sheet 1 of 2 B49739, Outline.Sheet 11995-04-0303 April 1995 Outline.Sheet 1 ML20266H3991994-05-19019 May 1994 Logic Block Diagram Load Shedding & Emergency Load Sequencing Sys Lsels ML20265A6361993-03-0606 March 1993 CPT Exchanger ML20265A5831991-10-0909 October 1991 Vertical Residual He Outline Dwg ML20265A6411991-09-25025 September 1991 Reactor Building Reactor Vessel Support Embeds.Sheet 1 ML20265A5991991-05-0606 May 1991 Auxiliary Building Structural Steel Pump Pedestal Plans & Details ML20259G2991987-10-20020 October 1987 Control Room Equipment Arrangement, as-built ML20265A6441985-11-27027 November 1985 Standardized Nuc Unit Power Plant System Projects RCS Equipment Supports Reactor Vessel Supports ML20265A6121985-07-25025 July 1985 Setting Plan for Component Cooling Water Heat Exchangers. Sheet 1 ML20262D9011985-07-16016 July 1985 Boundary Diagram. Rev Date Illegible ML20262E1141985-07-16016 July 1985 Reactor Pressure Vessel Rollout Id. No Rev Date ML20265D6111985-06-15015 June 1985 Ultimate One Line Diagram ML20262A5551985-06-0303 June 1985 Relay Outputs - Channel 2. Sheet 12 of 19.No Rev Date ML20262B3611985-06-0303 June 1985 Schematic Diagram:13.8 Kv XNB01 Xfmr Feeder. Rev Date Illegible ML20262A6371985-06-0303 June 1985 Signal Flow Block Diagram:Esfas. Sheet 1 of 19.No Rev Date ML20262A0981985-06-0303 June 1985 Operators Console Details. Rev Date Illegible ML20262B3561985-06-0303 June 1985 Lower Medium Voltage System Class 1E 4.16 Kv Three Line Meter and Relay Diagram ML20262B2641985-06-0303 June 1985 Schematic Diagram:Reactor Coolant Drain Tank Pump Discharge and Vent Isolation Valves ML20262A0891985-06-0303 June 1985 Sampling Main Control Board RL011 and RL012. Rev Date Illegible ML20262B9711985-06-0303 June 1985 Piping and Instrumentation Diagram:Process Sampling System. Rev Date Illegible ML20262B7371985-06-0303 June 1985 Piping and Instrumentation Diagram:Auxiliary Building Hvac. Rev Date Illegible ML20262B3981985-06-0303 June 1985 Schematic Diagram:4.16kV DG NE02 Feeder Breaker 152NB0211 ML20262B2061985-06-0303 June 1985 Schematic Diagram:Hydrogen Mixing Fans. Rev Date Illegible ML20262A4331985-06-0303 June 1985 Schematic Diagram:Letdown Line Isolation Valve. Rev Date Illegible ML20262A1011985-06-0303 June 1985 Auxiliary Shutdown Panel Details. Rev Date Illegible ML20262B4531985-06-0303 June 1985 Raceway Plan Communication Corridor Area-2 El 1,974 Ft & El 1,984 Ft ML20262B2781985-06-0303 June 1985 Schematic Diagram:Diesel Generator KKJ01A Engine Control D/G Trips. Rev Date Illegible ML20262B5321985-06-0303 June 1985 Piping & Instrumentation Diagram:Main Steam System. Rev Date Illegible ML20262B9111985-06-0303 June 1985 Piping and Instrumentation Diagram:Chemical and Detergent Waste. Rev Date Illegible ML20262A3111985-06-0303 June 1985 Higher Medium Voltage System 13.8kV Single Line Meter and Relay Diagram. Rev Date Illegible ML20262B4811985-06-0303 June 1985 Equipment Location:Reactor and Auxiliary Buildings Plan Operating Floor El 2,047 Ft 6 Inches. Rev Date Illegible 1998-01-08 Category:DRAWINGS-ARCHITECTURAL-APPLICANT'S FACILITY MONTHYEARML20259G2911985-01-11011 January 1985
[Table view]Ceiling Plan & Finish Schedule ML20259G2961981-12-0808 December 1981 Floor Plan & Roof Plan ML20260F0441980-03-13013 March 1980 Architectural:Cmu Wall Penetrations,Control Bldg & Communication Corridor ML20260F0731980-03-12012 March 1980 Architectural:Cmu Wall Penetrations,Control Bldg, Communication Corridor & Radwaste Bldg ML20260F0571980-03-0505 March 1980 Architectural:Cmu Wall Penetrations,Control Bldg & Communication Corridor ML20260F1471980-02-26026 February 1980 Architectural Elevator 1:Communication Corridor Plans, Sections & Details ML20260F1251980-01-28028 January 1980 Architectural:Computer Room & Control Room Detailed Floor Plans,Elevation 2,047 Ft,6 Inches ML20260F0831980-01-28028 January 1980 Architectural:General Masonry Details ML20260F0241980-01-23023 January 1980 Architectural:Cmu Wall Penetrations,Control Bldg & Communication Corridor ML20260F1391980-01-0707 January 1980 Architectural:Communication Corridor,Stair CC-1,Plans & Section ML20260E9981979-11-0505 November 1979 Architectural:Auxiliary & Reactor Bldg Floor Plan, Elevation 2,026 Ft ML20260F0951979-10-22022 October 1979 Architectural:General Masonry Details ML20260F0141979-08-19019 August 1979 Architectural:Cmu Wall Penetrations,Control Bldg ML20260F1121979-04-19019 April 1979 Architectural:Access Control & Control Room Areas,Interior Elevations ML20260F0041979-04-14014 April 1979 Architectural:Cmu Wall Penetrations,Auxiliary Bldg ML20260F0791979-04-0404 April 1979 Architectural:Control & Diesel Generator Bldgs & Communication Corridor,Floor Plans,Elevations 2,032 & 2,047 Ft ML20260F0691979-04-0404 April 1979 Architectural:Control & Diesel Generator Bldgs & Communication Corridor,Floor Plans,Elevations 2,000 & 2,016 Ft ML20260E9871979-04-0404 April 1979 Architectural:Auxiliary & Reactor Bldg Floor Plan, Elevation 1,974 Ft ML20260E9911979-04-0404 April 1979 Architectural:Auxiliary & Reactor Bldg Floor Plan, Elevation 2,000 Ft ML20260F0901979-04-0404 April 1979 Architectural:Control Bldg & Communication Corridor Floor Plan,Elevations 2,073 Ft,6 Inches & Roof Plan,Elevation 2,087 Ft,2 Inches ML20260F0191979-04-0404 April 1979 Architectural:Auxiliary & Reactor Bldg Floor Plans, Elevations 1,988 Ft,1,989 Ft & 2,013 Ft,6 Inches ML20260F0081979-04-0404 April 1979 Architectural:Auxiliary & Reactor Bldg Floor Plan, Elevation 2,047 Ft,6 Inches ML20260F0531979-03-29029 March 1979 Architectural:Cmu Wall Penetrations,Control Bldg & Communication Corridor ML20260F0321979-03-29029 March 1979 Architectural:Cmu Wall Penetrations,Control Bldg & Communication Corridor ML20260F1161979-03-0707 March 1979 Architectural:Control Bldg & Communication Corridor, Miscellaneous Details & Stairs C-2,CC-2 & CC-3 ML20260F0301978-10-0404 October 1978 Architectural:Auxiliary Bldg,Stairs A-1 & A-1A,Plans & Sections ML20260F0391978-10-0404 October 1978 Architectural:Auxiliary Bldg,Stair A-2,Plans & Sections ML20260F0491978-10-0404 October 1978 Architectural:Auxiliary Bldg,Elevator2,Plans & Sections ML20260F1201978-09-15015 September 1978 Architectural:Hot Lab Equipment & Furniture Layout, Elevations & Details,Elevation 1,984 Ft ML20260F0631978-09-11011 September 1978 Architectural:Control & Diesel Generator Bldgs & Communication Corridor,Floor Plans,Elevations 1,974 & 1,984 Ft ML20260F1041978-08-29029 August 1978 Architectural:Access Control Floor Plan,Elevation 1,984 Ft ML20260F1341978-08-24024 August 1978 Architectural:Control Bldg,Stair C-1,Plans & Section 1985-01-11 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20260F079&oldid=3142474"