ML20263G807 | |
Person / Time | |
---|---|
Site: | Midland |
Issue date: | 01/13/1983 |
From: | BECHTEL GROUP, INC. |
To: | CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
Shared Package | |
ML19304A216 | List:
|
References | |
CON-7220 E-376(Q), NUDOCS 8302090096 | |
Download: ML20263G807 (1) | |
Similar Documents at Midland | |
---|---|
Category:DRAWINGS
MONTHYEARML20263Q6241984-04-0202 April 1984
[Table view]Diesel Generator Typical Utility Interconnection Plan Above El 634 Ft 6 Inches ML20263M2701984-02-15015 February 1984 Marked-up Hanger Isometric:Main Steam Turbine Steam Aux & Turbine Bldgs Unit 2 Sys A. Sheet 2.Rev Date Illegible ML20263M2691984-02-15015 February 1984 Marked-up Hanger Isometric:Main Steam & Turbine Steam Aux & Turbine Bldgs Unit 1 System B. Sheet 3.Rev Date Illegible ML20263M4431984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plans at El 674 Ft & El 685 Ft ML20263M5231984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Interior Wall Elevs. Sheet 5 ML20263M5261984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elevations. Sheet 6 ML20263M5291984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elev at 5.3 & K (E of 7.8) ML20263M5211984-02-0707 February 1984 Auxiliary Building:Crack Survey Interior Wall Elevs. Sheet 4 ML20263M5181984-02-0707 February 1984 Auxiliary Building:Crack Survey Interior Wall Elevs. Sheet 3 ML20263M5151984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Interior Wall Elevs. Sheet 2 ML20263M5131984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Interior Wall Elevs. Sheet 1 ML20263M5101984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elevs at Col 8.7 & C ML20263M5551984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elevs 7.8 & K (E of 7.8) ML20263M5591984-02-0707 February 1984 Auxiliary Building:Crack Survey W Wing Plans & El 614 Ft - El 708 Ft 6 Inches ML20263M5611984-02-0707 February 1984 Auxiliary Building:Crack Survey E Wing Plans & El 614 Ft - El 708 Ft 6 Inches ML20263M5681984-02-0707 February 1984 Auxiliary Building:Crack Survey Elevs at Col Aa ML20263M5691984-02-0707 February 1984 Auxiliary Building:Crack Survey Control Tower Walls Elevs ML20263M5711984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Railroad Bay Plans ML20263M5731984-02-0707 February 1984 Auxiliary Building:Crack Survey Plan at El 624 Ft & Miscl Walls ML20263M5741984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elevs at Col a & B & Misc Walls ML20263M5091984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elev at Col 7.4 ML20263M5061984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elev at Col 5.6 ML20263M5031984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elevs at Col 5.1,7.9 & Hk ML20263M5001984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elev at Col Line a ML20263M4551984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elev at Col Line B ML20263M4531984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elevs at Col D & 4.55 ML20263M4511984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elevs at Col G & F ML20263M4481984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elevs at Col H ML20263M4461984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elevs at Col Kc ML20263M4401984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 659 Ft ML20263M4371984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 646 Ft ML20263M4351984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 634 Ft 6 Inches ML20263M4321984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 614 Ft ML20263M4291984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 599 Ft ML20263M4271984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 584 Ft ML20263M4241984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 568 Ft ML20263K7261984-01-30030 January 1984 Diesel Generator Typical Utility Interconnection Plan Above El 634 Ft 6 Inches ML20263M2771984-01-13013 January 1984 Unit 2 Turbine Roll Integrated Schedule ML20263M2731983-09-13013 September 1983 Marked-up Hanger Isometric:Main Steam Turbine Steam Aux Turbine Bldgs Unit 2 Sys B. Sheet 3 ML20263M2491983-08-25025 August 1983 Marked-up Piping and Instrument Diagram:Service Water Cooling Tower and Pump Structure Unit 1 & 2 ML20263M2541983-08-25025 August 1983 Marked-up Piping and Instrument Diagram:Service Water Cooling Tower and Pump Structure Unit 1 & 2 ML20261A6001983-07-25025 July 1983 Settlement Vs Time:Reactor Buildings. No Rev Date ML20263M2581983-07-14014 July 1983 Marked-up Hanger Isometric:High Pressure Steam to Evaporator Building. Sheet 1 ML20259D0491983-06-28028 June 1983 Dewatering Events ML20263B7941983-06-24024 June 1983 Hanger Isometric:Decay Heat Removal and Core Flooding System Unit 2 (Reactor Bldg Headers). Sheet 1 ML20259C6921983-06-0707 June 1983 Geologic Cross Section B-B and C-C Service Water Pump Structure ML20259C6871983-06-0606 June 1983 Geologic Cross Sections A-A and D-D Service Water Pump Structure ML20259C6821983-06-0606 June 1983 Geologic Cross Section Location Plan Service Water Pump Structure ML20263M2611983-02-15015 February 1983 Marked-up Hanger Isometric:Main Steam and Turbine Steam Aux & Turbine Unit 1 System A. Sheet 2 ML20263J1161983-01-13013 January 1983 Hanger Isometric:Aux Bldg Safety Related Chilled Water System Train B. Sheet 45.Rev Date Illegible 1984-04-02 Category:ELECTRICAL DRAWINGS-APPLICANT'S FACILITY MONTHYEARML20263G7831983-01-13013 January 1983
[Table view]Schematic Diagram:BOP-Engineered Safety Features Actuation System. Sheet 76.Rev Date Illegible ML20263G8971983-01-13013 January 1983 Schematic Diagram:Reactor Containment Building H & V Systems. Sheet 21.No Rev Date ML20263G8941983-01-13013 January 1983 Schematic Diagram:Reactor Containment Bldg H & V System. Sheet 20.No Rev Date ML20263G8911983-01-13013 January 1983 Schematic Diagram:Reactor Containment Bldg H & V System. Sheet 19.No Rev Date ML20263G8871983-01-13013 January 1983 Schematic Diagram:Reactor Containment Bldg H & V System. Sheet 18A.No Rev Date ML20263G8841983-01-13013 January 1983 Schematic Diagram:Reactor Containment Building H & V System. Sheet 18.No Rev Date ML20263G8801983-01-13013 January 1983 Schematic Diagram:Reactor Containment Building H & V Systems. Sheet 17.No Rev Date ML20263G1601983-01-13013 January 1983 Loop Diagram Containment Pressure Monitors Units 1 & 2. Sheet 7.Rev Date Illegible ML20263G1501983-01-13013 January 1983 Loop Diagram Chilled Water System. Sheet 5. Rev Date Illegible ML20263G1471983-01-13013 January 1983 Loop Diagram Emergency Diesel Fuel Oil Storage and Transfer. Sheet 5.Rev Date Illegible ML20263F5631983-01-13013 January 1983 Plant Single Line Diagram. Sheet 1 of 1.Rev Date Illegible ML20263G8761983-01-13013 January 1983 Schematic Diagram:Reactor Containment Building H & V Systems. Sheet 16.No Rev Date ML20263F9451983-01-13013 January 1983 Lighting and Communication Oily Waste Treatment Building. Sheet 1 of 1.Rev Date Illegible ML20263F9411983-01-13013 January 1983 Lighting & Communications Guardhouse. Sheet 1 of 1. Rev Date Illegible ML20263F9291983-01-13013 January 1983 Lighting & Communication Turbine Building Unit 2 Elevation 659 Ft & El 695 Ft 5/16 Inch. Sheet 1 of 2. Rev Date Illegible ML20263F9081983-01-13013 January 1983 Lighting & Communication Service Water Pump Structure. Sheet 1 of 1.Rev Date Illegible ML20263F9041983-01-13013 January 1983 Diesel Generator Building Lighting & Communication. Sheet 1 of 1.Rev Date Illegible ML20263F9021983-01-13013 January 1983 Lighting and Communication Evaporator & Aux Boiler Bldg Miscellaneous Plans. Sheet 4 of 4.Rev Date Illegible ML20263F8971983-01-13013 January 1983 Lighting and Communication Evaporator & Aux Boiler Bldg El 634 Ft 6 Inches & El 653 Ft 6 Inches. Sheet 3 of 4. Rev Date Illegible ML20263G9001983-01-13013 January 1983 Schematic Diagram:Reactor Containment Building H & V Systems. Sheet 23.No Rev Date ML20263F8821983-01-13013 January 1983 Lighting and Communication Turbine and Auxiliary Bldg Unit 1 & 2 Partial Plans. Sheet 1 of 1.Rev Date Illegible ML20263F8781983-01-13013 January 1983 Lighting and Communications Access Control Area El 634 Ft 6 Inches. Sheet 1 of 1.Rev Date Illegible ML20263F4331983-01-13013 January 1983 Facing Sheet:Conduit and Tray Notes,Symbols and Details. Sheet Vii.No Rev Date ML20263F4291983-01-13013 January 1983 Facing Sheet:Conduit and Tray Notes,Symbols and Details. Sheet Vi.No Rev Date ML20263F4271983-01-13013 January 1983 Facing Sheet:Conduit and Tray Notes,Symbols and Details. Sheet V.No Rev Date ML20263F4241983-01-13013 January 1983 Conduit and Tray Notes,Symbols and Details. Sheet Iv.No Rev Date ML20263F8761983-01-13013 January 1983 Lighting and Communications Control Room. Sheet 1 of 1. Rev Date Illegible ML20263F4181983-01-13013 January 1983 Facing Sheet:Conduit and Tray Notes,Symbols and Details. Sheet Ii.No Rev Date ML20263G9031983-01-13013 January 1983 Schematic Diagram:Reactor Containment Building H & V System. Sheet 24.No Rev Date ML20263F8721983-01-13013 January 1983 Lighting and Communication Reactor and Auxiliary Bldg Unit 1 & 2 Elevation 659 Ft. Sheet 1 of 1.Rev Date Illegible ML20263F8641983-01-13013 January 1983 Lighting and Communication Reactor and Auxiliary Bldg Unit 1 & 2 Elevation 646 Ft. Sheet 1 of 1.Rev Date Illegible ML20263G9091983-01-13013 January 1983 Schematic Diagram:Reactor Containment Building H & V Systems. Sheet 26.No Rev Date ML20263G9971983-01-13013 January 1983 Schematic Diagram:Control Room Outside Make-Up and Emergency Make-Up Air. Sheet 14.No Rev Date ML20263G9931983-01-13013 January 1983 Schematic Diagram:Control Room Outside Makeup and Emergency Makeup Air. Sheet 13.No Rev Date ML20263G9901983-01-13013 January 1983 Schematic Diagram:Control Room Outside Make-Up and Emergency Make-Up Air. Sheet 12.No Rev Date ML20263G9871983-01-13013 January 1983 Schematic Diagram:Control Room Outside Makeup and Emergency Makeup Air. Sheet 11.No Rev Date ML20263G8071983-01-13013 January 1983 Schematic Diagram:Control Rod Drive Power Supply and Control. Sheet 9.No Rev Date ML20263G8481983-01-13013 January 1983 Schematic Diagram:Reactor Containment Bldg H & V System. Sheet 3.No Rev Date ML20263G9071983-01-13013 January 1983 Schematic Diagram:Reactor Containment Building H & V Systems. Sheet 25.No Rev Date ML20263G9841983-01-13013 January 1983 Schematic Diagram:Control Room Outside Makeup and Emergency Makeup Air. Sheet 8.No Rev Date ML20263G8511983-01-13013 January 1983 Schematic Diagram:Reactor Containment Bldg H & V System. Sheet 4.No Rev Date ML20263G9801983-01-13013 January 1983 Schematic Diagram:Control Room Outside Makeup and Emergency Makeup Air. Sheet 7.No Rev Date ML20263G8541983-01-13013 January 1983 Schematic Diagram:Reactor Containment Bldg H & V System. Sheet 5.No Rev Date ML20263G8581983-01-13013 January 1983 Schematic Diagram:Reactor Containment Building H & V Systems. Sheet 10.No Rev Date ML20263G8611983-01-13013 January 1983 Schematic Diagram:Reactor Containment Bldg H & V System. Sheet 11.No Rev Date ML20263G8641983-01-13013 January 1983 Schematic Diagram:Reactor Containment Building H & V Systems. Sheet 12.No Rev Date ML20263G9311983-01-13013 January 1983 Schematic Diagram:Reactor Containment Building H & V Systems. Sheet 37.No Rev Date ML20263G9231983-01-13013 January 1983 Schematic Diagram:Reactor Containment Building H & V System. Sheet 33.No Rev Date ML20263G9261983-01-13013 January 1983 Schematic Diagram:Reactor Containment Building H & V Systems. Sheet 36.No Rev Date ML20263G9201983-01-13013 January 1983 Schematic Diagram:Reactor Containment Bldg H & V System. Sheet 30.No Rev Date 1983-01-13 |