ML20264A815
From kanterella
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ML20264A815 | |
Person / Time | |
---|---|
Site: | Marble Hill |
Issue date: | 09/10/1980 |
From: | SARGENT & LUNDY, INC. |
To: | PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA |
Shared Package | |
ML20069J547 | List:
|
References | |
CON-4808, CON-4808-00, CON-4923, CON-4923-00 M-24, NUDOCS 8305050352 | |
Download: ML20264A815 (1) | |
Similar Documents at Marble Hill | |
---|---|
Category:ARRANGEMENT-GENERAL--DRAWINGS-APPLICANT'S FACILITY
MONTHYEARML20264B4631984-05-16016 May 1984
[Table view]Gen Arr and Piping Storage Area El 397 Ft Radwaste Solidification System, as-built.Rev Date Illegible ML20263B8501983-09-26026 September 1983 Crane/Trolley Beam Locn Floor Plan at El 346 Ft. Sheet 5 ML20263B8531983-09-26026 September 1983 Crane/Trolley Beam Location Radwaste/Serv Bldg Comp. Sheet 6 of 24 ML20263B8661983-09-26026 September 1983 Crane/Trolley Beam Location Mezzanine Floor at El 426 Ft. Sheet 1 ML20263B8791983-09-26026 September 1983 Crane/Trolley Beam Location Floor Plan at El 401 Ft. Sheet 11 of 24 ML20263B8821983-09-26026 September 1983 Crane/Trolley Beam Location Basement Flr at El 346 Ft. Sheet 4 ML20263B8711983-07-0202 July 1983 Crane/Trolley Beam Loc Grade Floor at El 401 Ft. Sheet 2 ML20263B8271983-03-0101 March 1983 Equipment Removal:Main Floor at El 451 Ft. Sheet 1 ML20263B8301983-03-0101 March 1983 Mezzanine Floor El 426 Ft. Sheet 2 ML20263B8331983-03-0101 March 1983 Equipment Removal:Grade Floor at El 401 Ft. Sheet 3 ML20263B8351983-03-0101 March 1983 Equipment Removal:Floor Plan at El 383 Ft. Sheet 4 ML20263B8381983-03-0101 March 1983 Equipment Removal:Basement Floor at El 364 Ft. Sheet 5 ML20263B8401983-03-0101 March 1983 Equipment Removal:Floor Plan at El 346 Ft. Sheet 6 ML20263B8421983-03-0101 March 1983 Equipment Removal:Fuel Handling Building. Sheet 7 ML20263B8451983-03-0101 March 1983 Equipment Removal:Miscellaneous Plans. Sheet 8 ML20263B8481983-03-0101 March 1983 Equipment Removal:Radwaste/Service Bldg Complex. Sheet 14 ML20264A8171982-07-16016 July 1982 General Arrangement:Auxiliary Building Radiation Shielding. Sheet 6 of 20 ML20264A8241982-06-25025 June 1982 General Arrangement:Auxiliary Building Radiation Shielding. Sheet 10 of 20 ML20264A7941982-05-18018 May 1982 General Arrangement:Floor Plant at El 383 Ft ML20264B4641982-04-20020 April 1982 Tunnel Arrangement:Radwaste Solidification System, as-built ML20264B4611982-04-20020 April 1982 General Arrangement:Process Equipment El 383 Ft Radwaste Solidification System, as-built ML20264A7961982-02-0202 February 1982 General Arrangement:Basement Floor at El 364 Ft ML20264A8201982-01-0505 January 1982 General Arrangement:Auxiliary Building Radiation Shielding. Sheet 8 of 20 ML20264A8111981-12-31031 December 1981 General Arrangement:Auxiliary Building Radiation Shielding. Sheet 3 of 20 ML20264A8061981-12-14014 December 1981 General Arrangement:Miscellaneous Plans. Sheet 2 ML20264A8041981-12-14014 December 1981 General Arrangement:Miscellaneous Plans. Sheet 1 ML20264A8031981-12-14014 December 1981 General Arrangement:Section B-B ML20264A8011981-12-14014 December 1981 General Arrangement:Section A-A ML20264A7991981-12-14014 December 1981 General Arrangement:Fuel Handling Building ML20264A7971981-12-14014 December 1981 General Arrangement:Floor Plan at El 346 Ft ML20264A7921981-12-14014 December 1981 General Arrangement:Grade Floor at El 401 Ft ML20264A7901981-12-14014 December 1981 General Arrangement:Mezzanine Floor El 426 Ft ML20264A7891981-12-14014 December 1981 General Arrangement:Main Floor at El 451 Ft ML20264A6701981-12-14014 December 1981 General Arrangement:Roof Plan ML20263B8771981-12-11011 December 1981 Crane Trolley Beam Loc Floor Plan at El 383 Ft. Sheet 3 ML20264A8081980-11-24024 November 1980 General Arrangement:Auxiliary Building Radiation Shielding. Sheet 1 of 20 ML20264A8101980-09-10010 September 1980 General Arrangement:Auxiliary Building Radiation Shielding. Sheet 2 of 20 ML20264A8181980-09-10010 September 1980 General Arrangement:Auxiliary Building Radiation Shielding. Sheet 7 of 20 ML20264A8151980-09-10010 September 1980 General Arrangement:Auxiliary Building Radiation Shielding. Sheet 5 of 20 ML20264A8411980-09-10010 September 1980 Radwaste/Service Bldg:Radiation Shielding. Sheet 20 of 20 ML20264A8391980-09-10010 September 1980 Radwaste/Service Bldg:Radiation Shielding. Sheet 19 of 20 ML20264A8381980-09-10010 September 1980 Containment Building:Radiation Shielding El 426 Ft. Sheet 18 of 20 ML20264A8361980-09-10010 September 1980 Containment Building:Radiation Shielding El 401 Ft. Sheet 17 of 20 ML20264A8341980-09-10010 September 1980 Containment Building:Radiation Shielding El 390 Ft. Sheet 16 of 20 ML20264A8321980-09-10010 September 1980 Containment Building:Radiation Shielding El 377 Ft. Sheet 15 of 20 ML20264A8311980-09-10010 September 1980 General Arrangement:Fuel Handling Building Radiation Shielding. Sheet 14 of 20 ML20264A8291980-09-10010 September 1980 General Arrangement:Fuel Handling Building Radiation Shielding. Sheet 13 of 20 ML20264A8271980-09-10010 September 1980 General Arrangement:Auxiliary Building Radiation Shielding. Sheet 12 of 20 ML20264A8251980-09-10010 September 1980 General Arrangement:Auxiliary Building Radiation Shielding. Sheet 11 of 20 ML20264A8131980-09-10010 September 1980 General Arrangement:Auxiliary Building Radiation Shielding. Sheet 4 of 20 1984-05-16 Category:DRAWINGS MONTHYEARML20264B4631984-05-16016 May 1984
[Table view]Gen Arr and Piping Storage Area El 397 Ft Radwaste Solidification System, as-built.Rev Date Illegible ML20263B8871983-11-23023 November 1983 Containment Building:Jib Crane for Removal of Seals Loop 3 & 4. Sheet 24 ML20263C4991983-10-0505 October 1983 Pumphouse Area Grading & Drainage Plan ML20263B8501983-09-26026 September 1983 Crane/Trolley Beam Locn Floor Plan at El 346 Ft. Sheet 5 ML20263B8531983-09-26026 September 1983 Crane/Trolley Beam Location Radwaste/Serv Bldg Comp. Sheet 6 of 24 ML20263B8661983-09-26026 September 1983 Crane/Trolley Beam Location Mezzanine Floor at El 426 Ft. Sheet 1 ML20263B8791983-09-26026 September 1983 Crane/Trolley Beam Location Floor Plan at El 401 Ft. Sheet 11 of 24 ML20263B8821983-09-26026 September 1983 Crane/Trolley Beam Location Basement Flr at El 346 Ft. Sheet 4 ML20263B8711983-07-0202 July 1983 Crane/Trolley Beam Loc Grade Floor at El 401 Ft. Sheet 2 ML20263B8851983-06-0606 June 1983 Containment Building:Jib Crane for Removal of Seals Loop 1 & 2. Sheet 23 ML20264A6671983-04-21021 April 1983 Response to NRC Question 240.1(2.4.2.3)b(3). No Drawing Date ML20264A6631983-03-15015 March 1983 Transformer Area Grading & Drainage ML20264A6611983-03-15015 March 1983 Power Block Area Grading & Drainage. Sheet 6 ML20264A6591983-03-15015 March 1983 Power Block Area Grading & Drainage. Sheet 5 ML20264A6581983-03-15015 March 1983 Power Block Area Grading & Drainage. Sheet 4 ML20264A6471983-03-15015 March 1983 Power Block Area Grading & Drainage. Sheet 1 ML20264A5811983-03-15015 March 1983 Grading,Roadwork & Drainage. Sheet 3 ML20264A5771983-03-15015 March 1983 Grading,Roadwork & Drainage. Sheet 2 ML20264A5691983-03-15015 March 1983 Grading,Roadwork & Drainage. Sheet 1 ML20264A5531983-03-15015 March 1983 Site Plan. Sheet 1 ML20263B8271983-03-0101 March 1983 Equipment Removal:Main Floor at El 451 Ft. Sheet 1 ML20263B8301983-03-0101 March 1983 Mezzanine Floor El 426 Ft. Sheet 2 ML20263B8331983-03-0101 March 1983 Equipment Removal:Grade Floor at El 401 Ft. Sheet 3 ML20263B8351983-03-0101 March 1983 Equipment Removal:Floor Plan at El 383 Ft. Sheet 4 ML20263B8381983-03-0101 March 1983 Equipment Removal:Basement Floor at El 364 Ft. Sheet 5 ML20263B8401983-03-0101 March 1983 Equipment Removal:Floor Plan at El 346 Ft. Sheet 6 ML20263B8421983-03-0101 March 1983 Equipment Removal:Fuel Handling Building. Sheet 7 ML20263B8451983-03-0101 March 1983 Equipment Removal:Miscellaneous Plans. Sheet 8 ML20263B8481983-03-0101 March 1983 Equipment Removal:Radwaste/Service Bldg Complex. Sheet 14 ML20263B8561983-03-0101 March 1983 Condenser Water Box and Circulating Water Pump Removal Procedure. Sheet 50 ML20263B8611983-03-0101 March 1983 Condenser Water Box Removal Procedure. Sheet 51 ML20264C2521983-02-28028 February 1983 Outdoor Process Piping Systems. Sheet 10 ML20263M7981983-02-24024 February 1983 Process Control Block Diagram. Sheet 40.No Rev Date ML20263M8021983-02-24024 February 1983 Process Control Block Diagram. Sheet 41.No Rev Date ML20263M8061983-02-24024 February 1983 Process Control Block Diag. Sheet 42.No Rev Date ML20263M8101983-02-24024 February 1983 Nuclear Instrumentation Sys Source Range N-31 Functional Block Diagram. Rev Date Illegible ML20263N3091983-02-24024 February 1983 Schematic Diagram Reactor Loop 1D - Hot Leg Stop Valve - 1RC8001D. Rev Date Illegible ML20263M9171983-02-24024 February 1983 Key Diagram 480 V Aux Bldg ESF MCC 132X2 (1AP27E) & 132X2A (1AP27E-A). Rev Date Illegible ML20264B4871983-02-23023 February 1983 Diagram of Diesel Fuel Oil. Sheet 1 ML20264B4941983-02-23023 February 1983 Diagram of Diesel Fuel Oil. Sheet 2 ML20264B5011983-02-23023 February 1983 Diagram of Diesel Fuel Oil. Sheet 3 ML20264B5061983-02-23023 February 1983 Diagram of Diesel Oil and Fuel Oil Supply. Sheet 4 ML20264B6011983-02-0808 February 1983 Diagram of Safety Injection. Sheet 1 ML20264A6681983-02-0404 February 1983 Schematic Diagram:Auxiliary Feedwater Pump 1A-1AF01PA ML20264B4521983-02-0303 February 1983 Diagram of Make-Up Demineralizer System (Wm). Sheet 3 ML20264B4601983-02-0303 February 1983 Diagram of Make-Up Demineralizer System (Wm). Sheet 4 ML20264B4821983-02-0303 February 1983 Diagram of Make-Up Demineralizer System (Wm). Sheet 7 ML20264B5441983-01-19019 January 1983 Diagram of Service Air (Diesel Gen Starting Air). Sheet 7 ML20264B6491983-01-19019 January 1983 Diagram of Fuel Pool Cooling and Clean Up. Sheet 2 ML20264B6751983-01-19019 January 1983 Diagram of Chemical & Volume Control & Boron Thermal Regeneration. Sheet 6 1984-05-16 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20264A815&oldid=3124522"