1 1,
'A Maine gankee O
f
~
M o ri t h 1 y Statistical R e p ca r- t F;o r- N o v e m b e r- 1987 8801040403 871130 DR ADOCK 0500
-_- _ _ - _ - ___--_ TD V 'b
3 OPERATING DATA REPORT Docket No.: 50-309 Date: 03/Dsc/87 Completed By: D.A. RIVARD Telephone: 207-882-6321
- 1. Unit Name....................................... Maine Yankee
- 2. Reporting Period................................ November 1987
- 3. Licensed. Thermal Power (MWt).................... 2630
- 4. Nameplath Rating (Gross MWe).................... 864
- 5. Design Electrical Rating (Net MWe).............. 825
- 6. Maximum Dependable Capacity (Gross MWe)......... 850
- 7. Maximum Dependable Capacity (Net MWe)........... 810 i
- 8. If Changes in Capacity Ratings (Items Number 3-7)
Since Last Report, Give Reasons:
NO CHANGES
- 9. Power Level to Which Restricted, if Any (Net MWe)
- 10. Reasons f or Restrictions, if Any:
THIS MONTH YEAR-TO-DATE CUMULATIVE
- 11. Hours In Reporting Period 720.00 8.016.00
- 12. Number of Hours Reactor Was Critical........... 720.00 4.980.43 105.109.32
- 13. Reactor Reserve Shutdown Hours.................. 0.00 0.00 0.00
- 14. Hours Generator On-line.. 720.00 4.671.39 102.011.08
- 15. Unit Reserve Shutdown Hours.................. 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH)........ 1.877.399.00 11.174.480.00 232,431.792.00
- 17. Gross Electrical Energy Generated (MWH)........ 595.790.00 3.575.840.00 76.276.850.00
- 18. Net Electrical Energy Generated (MWH)........ 576.455.00 3.451.078.00 72.879.149.00
- 19. Unit Service Factor...... InO.OO 58.28 77.28
- 20. Unit Availability Factor. . 100.00 58.28 77.98
- 21. Unit Capacity Factor (Using MDC Net)........ 98.84 53.15 69.78
- 22. Unit Capacity Factor (Using DER Net)........ 97.05 52.18 67.99
- 23. Unit Forced Outage Rate.. 0.00 22.44 7.36 l
- 24. Shutdowns Scheduled Over Next 6 Months: NONE ,
1 1
- 25. If Shutdown at End of Report Period. Estimated Date of Startup: N/A l 1
'I Docket No 50-309 .i L'
, Unit Nnmas Maina Ycnkeni l .
Date: 01/Dec/87 l Completed By: D.A. Rivard
- Tel ephone- 707-882-6321 l
l.
1' t Report' M*onth: November, 1987 NARRATIVE
SUMMARY
OF OPERATING EXPERIENCES At the beginning of the month, the unit was at 100% power.
On 4 November, power was reduced to 75% for turbine valve'and excess flow check valve testing, and condenser. water box cleaning.
On 5 November, power was raised to 100%.
At the end of the month, the unit was at 100% power.
e 1
i
l .cAVERAbE DAILY UNIT POWER LEVEL cFOR: NOVEMBER'1987 Docket No.: 50-309 Unit: Maine Yankee Date: 03/Dec/87.
Completed By: D.A. RIVARD' Telephone: 207-882-6321 L
,J-Day Avg. Daily Power Level Day Avg. Daily Power Level (MWe-Net) (MWe-Net) 1 .................... 806 16 .................... 810 2 .................... 806 17 ....................- 810 3 .................... .798 18 .................... 807 4 .................... 658 19 . . . . . . . . . . . . . . . . . . . . - 806 5 .................... 740 20 .................... 810 6 .................... 809 21 .................... 809 7 .................... 808 22 .................... 806 8 ........... ........ 809 23 .................... 809-9 .................... 810 24 .................... 808 10 .................... 809 25 .................... 809 11 .................... 809 26 .................... 808 l
12 .................... 809 ,
27 .................... 809 2 13 .................... 807 28 .................... 808 14 .................... 810 29 .................... 806 15 .................... 809 30 .................... 809 i 4
- - - - - - - _ - . _ _ . _ - __:__m._m__-___ _ _ _ _ _ _
. .~. 50-309 UNIT SHUTDOWNS AND POWER REDUCTIONS Dockat No.:
- FOR NOVEMBER 1987 Unit Mnina Ycnkca Date: 03/Dec/87 Completed By: D.A. RIVARD Telephone: 207-892-6321 Page: 1 of 1 h
Number L. R. to 75%
Drte 871104 Type (1) S Duration (Hours) O Reason (2) B M;thod (3) 4 LER # N/A System Code (4) HA Component Code (5) VALVEX-C Reduced power for turbine valve and excess fitw check valve testing, and Cause and condenser water Corrective box cleaning.
Action .
- 1. TYPE: 2. REASON: (cont) 4. SYSTEM CODE:
(F)orced F-Administrative Exhibit G-Instructions (S)cheduled G-Operational Error for Preparation of Data; H-Other (Explain) Entry Sheets for
- 2. REASON Licensee Event Report A-Equipment Failure 3. METHOD: (LER) Fil e (NUREG.0161),
B-Maintenance or Test 1-Manual C-Refueling 2-Manual Scram 5. COMPONENT CODE:
D-Regulatory Restriction 3-Automatic Scram Exhibit I-Same source E-Operator Training & 4-Other (Explain) as above.
License Examination
._- _ _. .___________________a
e
~
T. MaineYankee AEUABLE E.ECTRCTY FOR MAINE SINCE 1972
' EDISON DRIVE AUGUSTA. MAINE 04330 .(207) 622 4868 h
8, 1987 December HN-87-136 GDH-87-277
- n. --.
Office of Resource Management United States Nuclear Regulatory Commission Washington, D. C. 20555
. Attention: Mr. Richard A. Hartfield, Chief Management Information Branch
References:
(a) License No. DPR-36 (Docket No. 50-309).
(b) NUREG-0020, Licensed Operating Reactors Status Summary Report
Subject:
Maine Yankee Monthly Statistical Report
' Gentlemen:
Enclosed you will find the Monthly Statistical Report for the Maine Yankee-Atomic Power Station for November,1987.
Very truly yours, HAINE YANKEE hh bV G. D. Whittier, Manager Nuclear. Engineering and Licensing GDH/bjp Enclosure l
cc: Acting Director, PDI-3 Mr. Hilliam T. Russell gioWh p '/
I Mr. Pat Sears Mr. Cornelius F. Holden pS 1GW . . .
j sti'd 9386L-SDE CF2 y /[