ML20245A167

From kanterella
Revision as of 15:11, 22 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of CRGR Meeting 110 on 870225 in Bethesda,Md. T Speis Scheduled to Present Encl 10CFR50.54f Ltr to All Licensees Re Pressure Isolation Valves
ML20245A167
Person / Time
Issue date: 02/13/1987
From: Sniezek J
Committee To Review Generic Requirements
To: Bernero R, Cunningham R, Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS), Office of Nuclear Reactor Regulation
Shared Package
ML20245A157 List:
References
REF-GTECI-105, REF-GTECI-NI NUDOCS 8702190399
Download: ML20245A167 (2)


Text

- - - - - - - - - - - -

Av

  1. o,, UNITED STATES yJ [ g NUCLEAR REGULATORY COMMISSION O E W ASHINGTON, D. C. 20555

+% ,,,,+ FEB 131987 ELEASED TO THE POR t

l l

k MEMORANDUM FOR: Robert M. Bernero, NRR Richard W. Starostecki, R-I Richard E. Cunningham, NMSS Denwood F. Ross, RES Clemens J. Heltemes, Jr., AEOD l Joseph Scinto, 0GC FROM: James H. Sniezek, Chairman Committee to Review Generic Requirements

SUBJECT:

CRGR MEETING NO. 110 The Committee to Review Generic Requirements (CRGR) will meet on Wednesday, 4

February 25, 1987, 1-3 p.m. in Room 6507 MNBB.

A T. Speis (NRR) will present for CRGR review the enclosed proposed 10 CFR 50.54f letter to all licensees concerning pressure isolation valves. (Category 2 item.)

If a CRGR member cannot attend the meeting, it is his responsibility to assure diat an alternate, who is approved by the CRGR Chairman, attends the meeting.

Persons making presentations to the CRGR are responsible for (1) assuring that the information re Charter - IV.8), (quired for CRGR review is provided to the Committee (CRGR2) co appropriate, assuring that other offices are represented during the presentation, and (4) assuring that agenda modifications are coordinated with the CRGR contact (WaltSchwink,x28639)andothersinvolvedwiththepresentation. Division i Directors or higher management should attend meetings addressing agenda items i under their purview.

In accordance with the ED0's March 29, 1984 memorandum to the Commission con-cerning " Forwarding of CRGR Documents to the Public Document Room (PDR)," the l enclosure, which contains predecisional information, will not be released to ,

the PDR until the NRC has considered (in a public forum) or decided the matter addressed by the information.

w J

n es H. Sniezek, Chai an Co .ittee to Review Generic requirements

Enclosure:

As stated cc { See next_page _

/

W< yn i

+ 4 1

[ s; p..-

FEB 131987 7:

cc:~ SECY Comission (5)

V. Stello, Jr.

Office Directors l '

Regional Administrators

'W. Parler T. Speis Distribution:-

JSniezek JRoe JZerbe TRehm RFraley DEDROGR cf GZwetzig BZalcman j

- 1 MLesar FHebdon WLittle. RErickson l POGR Staff PDR(NRG/CRGP)-

JClifford Central Files PRabideau WMcDonald STreby

-h l

(

)

i I

l l

0FC :ROGR :ROGR :DEDROGR  :  :  :  : -

.. ..:.. -ht. .- . . : .. . ...4./ __.-:__ ..____.--:.___-_-_....:---...-- --.:-------....

NAME :WS ' ink :JZerb . :JSniga

... .g k  :  :  :  : j

_.....:___J.......:_..-_.......:_----..__.:-_---...._:--.---_-_.. i I

_....:_....___....:..b___87 DATE ' t2/ l3 /87 :2/ / :2//3/87  :  :  :  : ____,

_ _ _ ____15msuewa mmgm mm _ ___ _ _ _ _ _ _

_y