Integrated Materials Performance Evaluation Program Review of Maine Agreement State Program, 980915-18
ML20203D099
Person / Time
Issue date: 09/18/1999
From:
NRC
To:
Shared Package
ML20203D096 List:
References
NUDOCS 9902160017
Download: ML20203D099 (33)


Text

. _

, _ . _. ~ . - - __ __

l i

INTEGRATED MATERIALS PERFORMANCE EVALUATION PROGRAM  ;

REVIEW OF MAINE AGREEMENT STATE PROGRAM September 15-18,1998 i

FINAL REPORT -

i i

s h

i 1

U.S. Nuclear Regulatory Commission W

W i

i 9902160017 981215 PDR STPRG ESGME j PDR  ;

l

- -- . . - - - . . - . ~

I i

1 Maine Final Report Page1 .;

1.0 INTRODUCTION

This report presents the results of the review of the Maine radiation control program. The review was conducted during the period September 15-18,1998 by a review team comprised of l technical staff members from the Nuclear Regulatory Commission (NRC) and the Agreement .

State of Mississippi. Review team members are identified in Appendix A. The review was conducted in accordance with the " Implementation of the Integrated Materials Performance -i*

Evaluation Program and Rescission of a Final General Statement of Policy," published in the Federal Reaister on October 16,1997, and the November 25,1997, revised NRC Management  ;

i Directive 5.6, " Integrated Materials Performance Evaluation Program (IMPEP)." Preliminary results of the review, which covered the period June 3,1995 to September 14,1998, were ,

discussed with Maine management on September 18,1998. .i i

A draft of this report was issued to Maine for factual comment on October 21,1998. The State responded in a letter dated November 15,1998 (Attachment 1). Maine's factual comments -l were considered by the team and accommodated in the report. The Management Review Board (MRB) met on December 1,1998 to consider the proposed final report. The MRB found I the Maine radiation control program was adequate to protect public health and safety and l compatible with NRC's program.

The Maine Agreement State program is administered by the Radiation Control Program (RCP). l The RCP Manager reports directly to the Director, Division of Health Engineering located in the  :

Bureau of Health. The RCP presently has a Program Manager and two Environmental j Specialist 111 (ES lll) positions assigned to radioactive materials under the Agreement. One  :

ES Ill position was vacant at the time of the review. This position was filled in October 1998. )

The Maine program regulates approximately 134 specific licenses authorizing agreement I materials. The review focused on the materials program as it is carried out under the Section l 274b. (of the Atomic Energy Act of 1954, as amended) Agreement between the NRC and the j State of Maine. Organization charts for the Bureau of Health and the RCP are included as l Appendix B. j i

in preparation for the review, a questionnaire addressing the common and non-common )

l performance indicators was sent to the State on June 29,1998. The State provided a response j

i. to the questionnaire on September 3,1998. A copy of their final response is included in ]

Appendix F to the draft report, l

i l The review team's general approach for conduct of this review consisted of: (1) examination of  !

Maine's response to the questionnaire; (2) review of applicable Maine statutes and regulations; )

(3) analysis of quantitative information from the RCP licensing and inspection data base; (4)  ;

technical review of selected licensing and inspection actions; (5) field accompaniments of two '

Maine inspectors; and (6) interviews with staff and management to answer questions or clarify ,

i issues. The review team evaluated the information that it gathered against the IMPEP criteria l for each common and applicable non-common performance indicator and made a prehmmary i l assessment of the RCP's performance. j l Section 2 below discusses the State's actions in response to recommendations made following l

[ the previous review. Results of the current review for the IMPEP common performance  !

!. Indicators are presented in Section 3. Section 4 discusses results of the applicable non- l common performance indicators, and Section 5 summarizes the review team's findings, j

}

I i

l

,_ _ 7 ._ _ _-_ _

!e I

! s, i

! I l Maine Final Report Page 2 j i r i recommendations, and suggestions . Recommendations made by the review team are l

! comments that relate directly to program performance by the State. A response is requested  ;

i from the State to all recommendations in the final report. Suggestions are comments that the l l review team believes could enhance the State's RCP. The State is requested to consider  ;

l suggestions, but no response is requested. l a  :

) 2.0 STATUS OF ITEMS IDENTIFIED IN PREVIOUS REVIEWS f At the effective date of the Agreement, April 1,1992, Maine's program was adequate and l

compatible. During the orientation visit conducted on August 7,1992, several weaknesses  !

associated with licensing and inspection backlogs were identified by NRC. The first program  ;

review was conducted in April 1993 and the findings for adequacy and compatibility were i withheld at that time. The State had performed only 6 inspections during the first year and had  :

25 overdue inspections. It was noted at that time that the staffing levels were below the l expected. (Note, the State disagreed with NRC's findings because of the impact on the Maine .

program from the licensing workload transferred from the Region.) During the February 1994 follow-up review, the program was found adequate and compatible with only one inspection ,

j overdue and an additional staff member hired. During the second review, conducted in June  ;

1995, the State was again found adequate and compatible.  ;

i

During the previous routine review, which concluded on June 2,1995, six recommendations .

! were made and the results transmitted to Lani Graham, Director, Department of Human i j Services, on March 21,1996. The team's review of the current status of these

recommendations is as follows:

l .

1. We recommend that:

1

! A review of Maine licenses should be performed based upon the requirements of the .

I

! emergency planning rule;

} The results of the review should be documented and provided to the NRC. 1 i If the results of the review indicate that Maine has no licences subject to the provisions  ;

! of the emergency preparedness (EP) rule, adoption of the rule may be deferred until a j j license application subject to the provisions of the rule is received. When a license i application subject to the EP rule is received, the provisions of the rule should be incorporated through license condition and the State should take measures to adopt the

EP requirements as a regulation. j
i Maine should take measures to adopt the other regulations which are a matter of i compatibility for the RCP. j 2

Current Status: Maine responded to the recommendation in a July 23,1996 letter to the  !

NRC, signed by Philip Haines, Acting Director, Bureau of Health. The response  :

l indicated that the EP rule would be incorporated through license conditions until -)

rulemaking could be enacted. A review of licensee programs identified that only one, j

! Binax, Inc., met the possession limits specified in the EP rule, thus requiring an j

emergency plan. Binax elected to decrease their possession limits below the rule limits j
and thereby avoided the need for an emergency plan. ,

l 1

i .

b 6

_ - . , - . . . L--

e b

Maine Final Report Page 3 At this time, no Maine licenses have possession limits necessitating an emergency plan.

Rulemaking for the EP rule is targeted for March 1999. This regulation is included in those identified in Section 4.1.2 for completion. This recommendation is closed.

2. We recommend that the membership appointments to the technical advisory committee, with individuals who are recognized experts in the use of radioactive materialin a wide spectrum of disciplines, be completed as soon as possible.

Current Status: Since the last review, appointments were made to the Maine Advisory Committee on Radiation representing the industrial, research, academic and medical license communities. The Committee advises the RCP on rulemakings, allegations and other radiation safety issues. This recommendation is closed.

3. We recommend that the RCP develop and implement a training plan for new staff members, which includes NRC core courses, or their equivalent; specialized training courses; and a schedule for implementation in order to maintain an adequate level of staff technicalcompetence.

Current Status: A training program, with a qualification journal, was developed for new staff members which is comparable to NRC's inspection Manual Chapter (IMC) 1246.

The ES ll1 has attended all necessary courses with the exception of the Teletherapy and Brachytherapy course and the RCP manager committed to assign qualification journals to new staff members. This recommendation is closed.

4. We recommend that the RCP change its inspection frequency for nuclear laundries from

. a priority 3 to a priority 2.

Current Status: The nuclear laundry inspection frequency was changed to priority 2, although Maine does not have any nuclear laundries. All Maine inspection frequencies are at least as frequent as NRC's. This recommendation is closed.

5. We recommend that field evaluations of inspectors be performed to assess performance and assure consistent application of appropriate RCP rules and policies.

Current Status: Field evaluations of inspectors are performed by the Program Manager at least annually. Since the Program Manager also performs inspections, the ES lil inspector performs annual audits of the Program Manager, using the same criteria. This recommendation is closed.

6. We recommend that the program develop consistent and clear regulatory language for compliance and enforcement letters. The regulatory language should include clearly defined terminology to describe findings and problem areas identified during inspections, such as the definitions of non-compliance; notice of violation; non-cited violations; point of emphasis; and area of concern.

Current Status: A review of inspection documentation identified that the program uses consistent regulatory language in letters to licensees. Similar to NRC, the terms

" violation" and "non-cited violation' are the preferred terms in use. This recommendation is closed.

s.

Maine Final Report Page 4 3.0 COMMON PERFORMANCE INDICATORS IMPEP identifies five common performance indicators to be used in reviewing both NRC Regional and Agreement State programe These indicators are: (1) Status of Materials inspection Program; (2) Technical Quality of Inspections; (3) Technical Staffing and Training;

(4) Technical Quality of Licensing Actions; and (5) Response to incidents and Allegations.

3.1 Status of Materials inspection Proaram The team focused on four factors in reviewing this indicator: inspection frequency, overdue inspections, initial inspection of new licensees, and timely dispatch of inspection findings to licensees. The review team's evaluation is based on Maine's questionnaire responses relative to this indicator, data gathered independently from the State's licensing and inspection data tracking system, the examination of completed inspection casework, and interviews with the staff. ,

The team's review of the State's inspection priorities showed that the State's inspection frequencies for the various types or groups of licenses are at least as frequent as similar license types or groups listed in the NRC Inspection Manual Chapter (IMC) 2800. The State's inspection frequencies for some licensees such as teletherapy, medical institution /no quality management program (QMP) required, medical private practice /no OMP required, and portable gauges are more frequent than required by NRC.

The staff uses Lotus Approach software for the tracking system. This allows them to project the next inspection due date and to sort inspection data by license type, code, name, priority, l and inspection date. The tracking system also provides other important information such as .

licensee contact and telephone numbers. The system allows the RCP to maintain inspection l histories such as types and number of violations from previous inspections. Their system j maintains the dates that notices of violations were issued, licensee responses were received, j and response acknowledgment letters were sent. The system provides the capabilities needed <

to track inspection and compliance data.

i 1

All inspection data are entered in the tracking system by the ES Ill. He prints a list of licenses j with inspections due in the next six months. Due to locations of some licensees, several l inspections in an area might be done during a trip. After the inspection is completed, the ES Ill updates the tracking system. The Program Manager monitors the tracking system to ensure

< inspections have been performed.

In their response to the questionnaire, Maine indicated that they had 12 inspections (2 core licenses) overdue by more than 25% of the NRC frequency, and stated that the inspections 4 would be completed by September 4,1998. During the week of the review, the team verified that all overdue inspections (core and non-core) had been completed and all inspections were

~

current. The team looked at the State's experience with overdue inspections during the entire review period and noted that several inspections were conducted later than the inspection frequency policy. Of the 19 inspection files that were evaluated for timeliness by the team, five (all core licenses) were inspected past the frequency. The overdue inspections included an Academic Type A Broad license (two year inspection frequency) inspected 18 months late and a Research and Development Type A Broad license (two year inspection frequency) inspected

Maine Final Report Page 5 13 months late. Of the 134 licenses regulated by the Maine program,35 are core licenses, as defined by IMC 2800. The review team recommends that the State perform routine inspections at required frequencies.

With respect to initial inspections of new licensees,13 new license files were evaluated by the team. Interviews with the Program Manager and ES Ill indicated that frequent conversations are initiated with license applicants to inform them of RCP regtutions and policies. New licenses are sometimes hand-delivered. The State's policy is to inspect all new licenses within six months of license issuance or receipt of radioactive material. Eight of the 13 new license files evaluated were not inspected within the required inspection frequency, but performed from 6 to 18 months past the six-month window. All new licenses issued since the start of the review period were inspected with the exception of two licenses issued in the last six months.

Interviews with staff indicated that contacts are made with new licensees to determine if radioactive material has been received, but these telephone conversations are not documented.

Therefore, the State believes some of the initial inspections which appear to be late inspections were actually completed within six months of the receipt of radioactive materials. The review team recommends that initialinspections of licensees be performed within 6 months of license issuance or within 6 months of the licensee's receipt of material and commencement of operations, consistent with IMC 2800.

In their response to the draft IMPEP report (Attachment 1), the State commented that they had documentation to justify not conducting six out of 13 overdue initial inspections during the review period, and that only three of 13 were not conducted within the first year of materials possession. The 3 licensees were inspected at 13 - 21 months of possession of mater.r.l.

According to the State, health and safety issues were not compromised.

The timeliness of issuance of inspection findings was evaluated during the inspection file  !

review. With one exception, inspection correspondence was sent to the licensee within 30 days  ;

after the inspection. Licensee responses to inspection findings were received in a timely  :

manner. The Program Manager sends out the acknowledgment to the licensee response and l determines if more enforcement action is needed. It was noted during the review that civil I penalties may be assessed if the licensee does not take appropriate corrective actions. Dunng  !

an interview with the Program Manager, it was determined that one licensee had to be called in for an enforcement conference and they agreed to take corrective actions. No civil penalties were assessed during the review period.

In their response to the questionnaire, Maine reported that, from 1995 to 1998, they inspected j all reciprocity licensees (two) that performed source installations or exchanges as well as over l 50% of industrial radiography licenses that filed requests for reciprocity. The team's evaluation 1 of the reciprocity files verified that inspections were performed. Only one Priority 2 licensee was granted reciprocity during the review period, and it was inspected by the RCP.

Although preference is given to the inspection of higher pricrity reciprocity licensees, approximately 10% of Priority 3-7 licensees that apply for reciprocity are also inspected.

Maine's Priority 3 licenses include portable gauges (Priority 5 in IMC 2800). The review team 1 found the State's frequency for Priority 3 licenses acceptable with this variation from IMC 1220.

1 l

4.

Maine Final Report Page 6 Late inspections of core licenses (IMC 2800 Priority 1 to 3 and initials) resulted in inspection backlogs at various times during the review period. File evaluations performed by the team identified 13 of 48 (27%) core licenses (35 Priority 1 to 3 and 13 new licenses) were inspected late. At the time of this review, however, no inspections were overdue, core or non-core. The Program Manager is now placing a higher priority on initial inspections and other core licenses.

The recent hiring of another ES Ill will help with that goal. The delay of the initial inspection did not result in any health and safe'y issues that would have been prevented by performing the initialinspection on time. Based on the management's awareness of the initialinspections backlog and the actions take by the State to eliminate overdue inspections, and the team's observation of the State's inspection methodology during the accompaniments (as discussed in Section 3.2), the team believes that a satisfactory with recommendations finding for improvement is appropriate for the Maine program. Maintaining the current staffing level should lead to improve performance in this indicator.

Based on the IMPEP evaluation criteria, the review team recommends that Maine's performance with respect to the indicator, Status of Materials Inspection Program, be found satisfactory with recommendations for improvement.

3.2 Technical Quality of Insoections The team evaluated the inspection reports and enforcement documentation, and interviewed inspectors for 19 radioactive materials inspections conducted during the review period. Both the Program Manager and the ES Ill conduct inspections. The casework included both inspectors and covered inspections of various types including medical institution /QMP required, medical institution /no OMP required, academic Type A Broad, teletherapy, industrial radiography, nuclear pharmacy, manufacturing and distribution, mobile nuclear medicine, fixed gauges and portable gauges. Appendix C lists the inspection casework files reviewed for completeness and adequacy with case specific comments.

Maine's inspection procedures are consistent with NRC procedures. Inspections are routinely unannounced. Announced inspections usually involve initial inspections, inspections at distant locations, or, rarely, to ensure the presence of knowledgeable licensee staff. The review team noted that for the 19 inspections evaluated, only one inspection was announced.

Maine's enforcement procedures include routine and escalated enforcement mechanisms.

Routine enforcement examples include enforcement conferences Notices of Violation, follow-up inspections, and restrictive license conditions. Escalated enforcement includes civil penalties, temporary suspension of operations, temporary suspension of license, confiscation of radioactive material, and criminal penalty. An interview with the Program Manager revealed that, during the review period, the RCP had only one escalated enforcement action, an enforcement meeting with a licensee which achieved the desired corrective actions by the licensee.

Based on casework, the review team noted that the routine inspections covered all aspects of the licensees' radiation safety programs. Some deficiencies were noted and are documented in Appendix C. The team noted that inspections are performance-based. Inspectors observed licensed operations and had operations demonstrated whenever possible. Team inspections were performed when appropriate.

1 l

- i i

Maine Final Report Page 7 l Maine's inspection field notes are comparable to NRC's inspection Procedure 87100. The inspection field notes provide documentation of the scope of the licensees' program including receipt, transfer, use and storage of material, leak tests, personnel monitoring, training, disposal of radioactive materials, inventory, surveys and wipes for contamination, posting, labeling, audits, interviews with workers, contacts, independent surveys by the inspector, previous violations, and inspection findings. Field notes were developed to cover all the i different types of inspections that are conducted by the State.  ;

The review team noted that the field notes did not document the items discussed in the exit meeting. The inspection reports list the names of individuals interviewed and contacted during the inspection, however, the reports could be strengthened by including a summary of the discussion. The review team also noted that six inspection reports had no supervisory review of the inspection report. The review team suggests that the RCP management continue supervisory review of inspection reports.

The license casework that was evaluated contained complete inspection findings and enforcement correspondence. Telephone conversations with licensees were documented on an agency form that was maintained in each license file folder. The files allowed the reviewer to see that inspectors had conducted the inspections, discussed inspection findings with the Program Manager, and followed up on enforcement action after the licensee response was received.

The inspection findings are issued by the Program Manager. Inspection findings are routinely sent to licensees within 30 days with licensee responses returned in a timely manner. The response is reviewed by the inspector and the Program Manager prior to the State issuing an acknowledgment letter. Agency letters to the licensee outlining inspection findings and enforcement actions are written in a formal form using appropriate style, detail, and regulatory language. One of the findings frora the previous program review was that inspection findings language was confusing due to the use of various terminology for violations and items of concern. Thir, issue has been corrected.

As noted in the questionnaire, the State has available a variety of portable instruments for routine confirmatory surveys and use during incidents and emergency conditions. The instruments include high and low range GM detectors, micro-R meters, alpha detectors, ion chambers, rate meters, multi-channel analyzer, single-channel analyzer, and sodium iodide detectors. The inspectors have calibrated alarming ratemeters for use during industrial radiography inspections. They are also issued pocket dosimeters and TLDs. The instruments are calibrated on an annual basis by calibration facilities that use sources traceable to the National Institute of Standards and Technology. The instruments used during the inspector accompaniments with the review team member were operational and calibrated. The State uses the Bureau of Health's Health and Environmental Testing Laboratory to analyze wipes for contamination and for analysis of water and soil samples.

i The ES 111 has been accompanied by the Program Manager annually during the review period.

l The Program Manager has also been accompanied by the ES lil during 1998. The Program Manager stated that annual inspector accompaniments will continue to be done using this approach to ensure inspection procedures are followed and to assess the inspector's ability to conduct inspections of specific types of licensees.

l l

Maine Final Report Page 8 During the week of August 3,1998, a review team member performed accompaniments of the Program Manager and ES Ill on separate inspections of licensed facilities (See Appendix C).

The inspections included an academic institution and an industrial radiography licensee. During the accompaniments, inspectors demonstrated appropriate inspection skills and knowledge of regulations. The inspectors were well prepared and thorough in the review of licensee programs. Inspection techniques were observed to be performance-oriented and the technical performance of both inspectors was excellent. The inspections were adequate to assess radiological health and safoty at the licensed facilities.

Based on the IMPEP evaluation criteria, the review team recommends that Ma!r/s performance with respect to the indicator, Technical Quality of inspections, be found satisfactory.

~

3.3 Technical Staffino and Trainina Issues central to the evaluation of this indicator include the radioactive materials program staffing level and staff tumover, as well as the technical qualifications and training histories of -

the staff. To evaluate these issues, the review team examined the State's questionnaire

. responses relative to this indicator, interviewed RCP management and staff, and considered any possible workload backlogs.

At the time of the review, Maine's radioactive materials program was staffed by the Program i Manager and one full time ES Ill. In August 1997, the former Program Manager left the i

, program and an ES lil was named Acting Mansger. In July 1998, the acting Program Manager l was named Program Manager. For a period of one year, the RCP was short staffed. As i discussed in Section 3.1 above, the vacancy contributed to inspection backlogs and late l inspections during the review period. The lack of staffing has also affected the promulgation of i regulations required for compatibility. Rulemakings have been delayed and are considerably overdue, as described in Section 4.1.2 below. The review team noted that minimal staff time was devoted to rulemaking efforts due to licensing and inspection needs. The State also identified this area as a weakness in the IMPEP questionnaire. The review team suggests that the State evaluate staffing needs to ensure its long-term ability to address regulations and timely completion of inspections.

Additionally, the Low-Level Waste Inspector position in the program has been vacant since May 1998. This staff position relates primarily to the decommissioning of the Maine Yankee reactor, but provides support and depth to the radioactive materials program. The position is currently posted.

In October 1998, shortly after this review, the vacant ES 111 position was filled. The new hire  !

has commenced the Program's qualification and training process. l The RCP has a training and qualification program in place for the staff which is taken directly from the NRC's IMC 1246, " Formal Qualification Programs in the Nuclear Material Safety and Safeguards Program Area." Both the Program Manager and ES lli are well trained and are qualified from an education and experience standpoint. Both have Bachelor's degrees in the sciences and the Program Manager is also a professional engineer. They have attended most of the training courses prescribed by IMC 1246 and are very familiar with Maine regulations,

_. ~ . -_ _ _ - _ _ . ___ _.- _ . _ . . _ . . _ _

7 , ,

4 .

I i

j-  !

i i j Maine Final Report Page 9  !

policies, and procedures. Neither individual has taken the Teletherapy and Brachytherapy l

course (H-313), but the ES 111 is enrolled in the March 1999 course. The new hire ES 111 has  !

been issued a qualification joumal.  ;

i During a 1997 rulemaking, the State raised licensee fees to cover anticipated travel and f j training costs. The ability to pay all training costs for NRC-sponsored courses allows priority  ;

acceptance and helps staff members maintain training levels required by IMC 1246. l i Based on the IMPEP evaluation criteria, the review team recommends that Maine's j performance with respect to the indicator, Technical Staffing and Training, be found I satisfactory. r t

3.4 Technical Quality of Licensina Actions The review team examined completed licensing casework and interviewed the staff for 19  :

specific licenses. Licensing actions were evaluated for completeness, consistency proper  ;

! isotopes and quantities used, qualifications of authorized users, adequate facilities and equipment, and operating and emergency procedures sufficient to establish the basis for i

! licensing actions. Licenses were evaluated for overall technical quality including accuracy, i appropriateness of the license, its conditions, and tie-down conditions. Casework was j

! evaluated for timeliness, adherence to good health physics practices, reference to appropriate ,

i regulations, documentation of safety evaluation reports, product certifications or other  !

l supporting documents, consideration of enforcement history on renewals, pre-licensing visits,

peer or supervisory review as indicated, and proper signature authority. The files were checked j j for retention of necessary documents and supporting data.  !

l The licensing casework was selected to provide a representative sample of licensing actions  :

that had been completed in the review period. The cross section sampling included the l following types: academic broad scope; industrial radiography; medical institutions; nuclear

pharmacy; fixed and portable gauges; teletherapy; self-shielded irradiator; and manufacturing.

, Licensing actions completed during the review period included 24 new licenses,35 renewals,

and 151 amendments (including 15 terminations), for a total of 210 licensing actions. The  :
review team noted that staff is currently reviewing the decommissioning results for the Philips j Elmet facility with regard to agreement material in Maine. A list of licenses evaluated with case-
specific comments for license reviews may be found in Appendix D.  !

! Types of licensing actions selected for review included two new licenses, eleven amendments to existing licenses, four license renewals, and two terminations. License reviews were generally well done and complete. The review team noted that some licenses included license conditions that were obsolete; however, the presence of these older license conditions did not compromise the safe use of licensed material. Also, the review team noted that one action  ;

included privacy information provided by the licensee in the docket file. This issue is discussed j in more detailin Section 3.5. I i The licensing process was discussed with the ES lil, who is also the primary license reviewer, .

and with the Prograrri Manager. All licensing actions receive supervisory review, and are  ;

signed by management. Deficiencies are addressed by correspondence utilizing appropriate  ;

i regulatory language. The review team noted that RCP staff did not always document telephone lr L  !

. , , . - r-c.., -

m- * .

,oem- ,- -- -- re. - , -

l* i i i I

ia  :

3 i

, Maine Final Report Page 10 conversations with the licensee that requested specific information in support of completing a  !

l licensing action.

The State uses detailed licensing checklists for renewals and new licenses. The review team  ;

noted that the program did not develop a checklist for industrial radiography reviews and l utilized an NRC checklist for industrial radiography license actions performed during the review ,

period, in discussions with the primary license reviewer, a radiography checklist was not developed due to the small number of radiography licenses in the State, but with addition of new licenses, the RCP has already recognized the need to develop an industrial radiography l checklist. t The State utilizes a commercial database system for tracking licensing actions. The ES lil also ,

maintains a written log of all licensing actions received and their status. Maine's goal is to complete actions on license amendments within 90 days. However, the RCP's reliance on one ,

primary reviewer to handle all licensing actions (typically six to 10 per month) did result in some l I amendment actions taking more than 90 days to complete. With one exception, the review l l team found that renewals were completed within one year of receipt.

t 4

Based on the IMPEP evaluation criteria, the review team recommends that Maine's  ;

l J performance with respect to the indicator, Technical Quality of Licensing Actions, be found l

) satisfactory. f i

3.5 Response to incidents and Alleaations

)

i in evaluating the effectiveness of the State's actions in responding to incidents, the review team  ;

examined the State's response to the questionnaire regarding this indicator, evaluated selected i i incidents reported for Maine in the " Nuclear Material Events Database" (NMED) against those  ;

l contained in the Maine files, and evaluated the casework and supporting documentation for five material incidents. The team also reviewed the State's response to four allegations including  !

one allegation referred to the State by NRC during the review period. A list of incident files i

examined along with case specific comments is contained in Appendix E. +

I j The five incidents selected for review included abandoned material, procedural failure, (

contamination event, damage to equipment, and a transportation event. l When notification of an incident or an allegation is received, the Program Manager and staff l j normally meet to discuss the initial response and the need for an on-site investigation. The l
safety significance of the incident / allegation is evaluated to determine the type of response that Maine will take. The small size of the Maine program allows for the prompt dissemination of  ;

- information regarding the event to all personnel in the program. Radiological incidents can be l reported 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a day through the Department's emergency line. The RCP has general  ;

written guidance for handling both incidents and allegations in their inspection procedures. 1 The review team found that the State's responses to incidents and allegations were within the j performance criteria. initial responses were prompt and well-coordinated, and the level of effort - l was commensurate with the health and safety significance. Inspectors were dispatched for on-  !

site investigations when appropriate and the State took suitable action.  ;

[; i j }

. I 1

Maine Final Report Page 11 The review team found the documentation of the incidents to be inconsistent. Although three of the five incidents evaluated had documentation in the incident files, the other two incidents had not been documented nor received supervisory review. The review team also found that the documentation of the incidents invoMng specific licensees were not placed in the license files.

Finally, the review team noted that incidents were not followed up at the next inspection or in a

timely fashion. The review team recommends that the program consistently document and perform appropriate follow-up of allincidents.

1 The review team concluded, after a review of the incidents and discussions with staff, that one of the incidents required reporting to the NRC Operations Center. The Program Manager was familiar with the guidance contained in the " Handbook on Nuclear Event Reporting in the Agreement States." The review team queried the incident information reported to the NMED system for Maine for the review period which identified three events. All three incidents reported to NMED corresponded to events related to activities at Maine Yankee Nuclear Generating Stauon.

During the review period, there was one allegation referred to the State by the NRC and three i allegations reported directly to the program. The review of the State's allegation file indicates that the State took prompt and appropriate action in response to the concerns raised. The L review team noted that all documentation related to the investigation of allegations was maintained in a separate file with no cross reference to the license file. Although the review team recognized the program's decision to keep any documentation related to the allegation f separated, the review team noted that sorre privacy information was inadvertently placed in the l i

, license files as part of licensing action (see Section 3.4). The review team recommends that the program's procedures be reviewed and updated for handling allegations and other privacy information to reflect Department of Health policy or State laws specific to Maine.

Based on the IMPEP evaluation criteria, the review team recommends that Maine's performance with respect to the indicator, Response to incidents and Allegations, be found satisfactory, i 4.0 NON-COMMON PERFORMANCE INDICATORS IMPEP identifies four non-common performance indicators to be used in reviewing Agreement State programs: (1) Legislation and Program Elements Required for Compatibility; (2) Sealed Source and Device Evaluation Program; (3) Low-Level Radioactive Waste Disposal Program; and (4) Uranium Recovery Program. Maine's Agreement does not include a low-level waste disposal program or a uranium recovery program, so only the first two non-common  !

performance indicators were applicable to this review.

4.1 Leaislation and Proaram Elements Reauired for Compatibility 4.1.1 Lecislation Along with their response to the questionnaire, the State provided the review team with the l opportunity to review copies of legislC >n that affects the RCP. The currently effective statutory authority for the RCP is contained in the Maine Radiation Protection Statutes in 22 MRSA ,

661-690. The Radiation Control Program is designated as the State's radiation control agency.

E

b Maine Final Report Page 12 The review team noted that no legislation affecting the RCP was passed during the review period.

4.1.2 Proaram Elements Reauired for Comoatibility The Maine Regulations for Control of Radiation, found in Maine Administrative Rules 10-144A CMR 220, apply to all ionizing radiation, whetLer emitted from radionuclides or devices. Maine requires a license for possession and use of all radioactive materialincluding naturally occurring materials, such as radium, and accelerator-produced radionuclides.

The review team examined the State's administrative rulemaking process and found that the process takes approximately four months after filing the draft administrative rule with the Secretary of State. Prior to filing with the Secretary of State, the draft administrative rule is reviewed by management and the Attorney General's office as well as the Maine Advisory Committee on Radiation. When an acceptable draft proposed revision to a rule has been prepared, it is sent to the Secretary of State, all potentially impacted licensees and registrants, and the NRC, for comment. The Secretary of State announces a public comment / hearing period for the proposed revision to the rule. After responding to comments, the RCP forwards the proposed revision to the rule with the addressed comments to the Commissioner, Department of Human Services for final approval. Comments are considered and incorporated as appropriate before the regulations are finalized. The Commissioner and the Attorney General sign final regulations. The State has the authority to issue legally binding requirements (e.g., license conditions) in lieu of regulations until compatible regulations become effective.

The team evaluated Maine's responses to the questionnaire and reviewed the status of regulations required to be adopted by the State during the review period. No compatibility-related regulations were adopted by the State during the review period. The review team noted that Maine prepared initial drafts for several of the NRC regulation amendments required to be adopted, however, they have not been finalized and, therefore, they have not been adopted.

As stated in Section 3.3, the State identified this area as a weakness. The diminished staffing in the program has limited the time devoted to rulemaking issues, in favor of the inspection and licensing programs.

The State has not yet adopted the following regulations, but intends to address them in rulemakings or by adopting alternate generic legally binding requirements:

  • " Licensing and Radiation Safety Requirements for irradiators," 10 CFR Part 36 amendment (58 FR 7715) that became effective July 1,1993. At this time, Maine has no poolirradiators.

, y 9 .

i

~

Maine Final Report Page 13  !

i e " Decommissioning Recordkeeping, and License Termination: Documentation i Additions," 10 CFR Parts 30,40,70, and 72 amendments (58 FR 39628) that became j effective on October 25,1993.

i

~

e "Self-Guarantee as an Additional Financial Mechanism," 10 CFR Parts 30,40, and 70 amendments (59 FR 1618) that became effective January 28,1994.  ;

e " Timeliness in Decommissioning of Materials Facilities," 10 CFR Parts 30,40, and 70  ;

amendments (59 FR 36026) that became effective August 15,1994. ,

e " Preparation, Transfer for Commercial Distribution, and Use of Byproduct Material for  ;

Medical Use," 10 CFR Parts 30,32, and 35 amendments (59 FR 61767 and 65243) that +

became effective January 1,1995.

l e ' Frequency of Medical Examinations for Use of Respiratory Protection Equipment," 10 CFR Part 20 amendment (60 FR 7900) that became effective March 13,1995. >

e " Low-Level Waste Shipment Manifest Information and Reporting," 10 CFR Parts 20 and 5 61 amendments (60 FR 15649 and 25983) that became effective March 1,1998. The Agreement States were expected to promulgate their regulations no later than March 1, 1998 so that NRC and the State would require this national system to be eff6ctive at the i same time. At this time, Maine licensees are implementing the requirements cf these i regulations through transfer of material requirements to the low-level waste disposal  ;

facilities.

I e " Performance Requirements for Radiography Equipment," 10 CFR Part 34 amendment j (60 FR 28323) that became effective June 30,1995. )

e " Radiation Protection Requirements: Amended Definitions and Criteria," 10 CFR Parts  ;

19 and 20 amendments (60 FR 36038) that became effective August 14,1995.

e " Medical Administration of Radiation and Radioactive Materials," 10 CFR Parts 20 and 35 amendments (60 FR 48623) that became effective October 20,1995.  !

e " Clarification of Decommissioning Funding Requirements," 10 CFR Parts 30,40, and 70 l amendments (60 FR 38235) that became effective November 24,1995.

1 e ' Compatibility with the International Atomic Energy Agency," 10 CFR Part 71 )

amendment (60 FR 50248) that became effective April 1,1996. )

  • ' Termination or Transfer of Licensed Activities: Record Keeping Requirements,"

10 CFR Parts 20,30,40,61, and 70 amendments (61 FR 24669) that became effective '

June 17,1996.

o " Resolution of Dual Regulation of Airbome Effluents of Radioactive Materials; Clean Air l Act," 10 CFR Part 20 amendment (61 FR 65119) that became effective January 9,  ;

1997. j 5

1

Maine Final Report Page 14 e ' Recognition of Agreement State Licenses in Areas Under Exclusive Federal Jurisdiction Within an Agreement State," 10 CFR Part 150 amendment (62 FR 1662) that became effective February 27,1997.

  • ' Criteria for the Release of Individuals Administered Radioactive Material," 10 CFR Parts 20 and 35 amendments (62 FR 4120) that became effective May 29,1997, e " Licenses for Industrial Radiography and Radiation Safety - Requirements for Industrial Radiography Operations," 10 CFR Parts 30,34,71, and 150 amendments (62 FR 28947) that became effective June 27,1997.

e " Radiological Criteria for License Termination,* 10 CFR Parts 20,30,40, and 70 amendments (62 FR 39057) that became effective August 20,1997.

  • ' Exempt Distribution of a Radioactive Drug Containing One Microcurie of Carbon-14 Urea," 10 CFR Par 130 amendment (62 FR 63634) that became effective January 2, 1998.
  • ' Deliberate Misconduct by Unlicensed Persons," 10 CFR Parts 30,40,61,70, and 150 amendments (63 FR 1890 and 13773) that became effective February 12,1998.

The State indicated they anScipate ac' option of the overdue regulations and the regulations which require adoption through 2000, by April 1999. As discussed during the December 1, 1998 MRB, the additional staff hired has enabled the State to put additional effort forth on regulations to achieve promulgation by April 1999. A recommendation that Maine adopt compatible regulations within the 3 year time frame was made during the 1995 review. The review team recommends that the State expedite promulgation of the compatibility-related regulations.

It is noted that Manegement Directive 5.9, Handbook, Part V, (1)(C)(lll) provides that the above regulations shou'd be adopted by the State as expeditiously as possible, but not later than 3 years after the September 3,1997 effective date of the Commission Policy Statement on Adequacy and Compatibility, i.e., September 3,2000.

Based on the IMPEP evaluation criteria, the review team recommends that Maine's performance with respect to the indicator, Legislation and Program Elements Required for Compatibility, be found satisfactory with recommendations for improvement.

4.2 Sealed Source and Device (SS&D) Evaluation Prooram At the time of the review, Maine had no sealed source or device manufacturers nor were any applicants anticipated in the near future. The State, however, does not wish to relinquish the authority to regulate SS&D manufacturers in the future. The State committed to have a program in place prior to performing evaluations. Accordingly, the review team did not evaluate this indicator.

w. .. ~ .- - ~ . - . _ . - - _ . . - . . . - . .. . - . .

!* i l

!' f

' Maine Final Report Page 15 1 i

5.0

SUMMARY

i As noted in Sections 3 and 4 above, the review team found Maine's performance to be  !

i satisfactory for the indicators Technical Quality of Inspections, Technical Staffing and Training,  ;

Technical Quality of Licensing Actions, and Response to incidents and Allegations. The review .
team found Maine's performance to be satisfactory with recommendations for improvement for j the indicators Status of Materials inspection Program, and Legislation and Program Elements

Required for Compatibility. Accordingly, the review team recommended and the MRB l concurred in finding the Maine Agreement State Program to be adequate to protect public l health and safety and compatible with NRC's program.  ;

Below is a summary list of recommendations and suggestions, as mentioned in earlier sections i

) of the report, for implementation and evaluation, as appropriate, by the State. l l RECOMMENDATIONS: }

1. The review team recommends that the State perform routine inspections at required {

frequencies. (Section 3.1).

[

I 2. The review team recommends that initial inspections of licensees be performed within 6  !

l months of license issuance or within 6 months of the licensee's receipt of material and l commencement of operations, consistent with IMC 2800. (Section 3.1). l l 3. The review team recommends that the program consistently document and perform  !

appropriate follow-up of allincidents. (Section 3.5).

)

4. The review team recommends that the program's procedures be reviewed and updated i for handling allegations and other privacy infonnation to reflect Department of Health  !

policy or State laws specific to Maine. (Section 3.5).

l t

5. The review team recommends that the State expedite promulgation of the compatibility-  !

related regulations. (Section 4.1.2). i SUGGESTIONS:

1. The review team suggests that the RCP management continue supervisory review of  ;

inspection reports. (Section 3.2).  ;

2. The review team suggests that the State evaluate staffing needs to ensure its long-term ,

ability to address regulations and timely completion of inspections. (Section 3.3). l l

l l

a

LIST OF APPENDICES AND ATTACHMENTS Appendix A IMPEP Review Team Members Appendix B Maine Organization Charts Appendix C inspection Casework Reviews Appendix D License Casework Reviews  !

Appendix E incident Casework Reviews Attachment 1 State's Response to Draft Report Dated November 15,1998 i,

6 F

$ b t

r I l

r i

APPENDIX A iMPEP REVIEW TEAM MEMBERS Name Area of Responsibility James Lynch, Region lli Team Leader Technical Staffing and Training Legislation and Program Elements Required for Compatibility B. J. Smith, Mississippi Status of Materials inspection Program Technical Quality of Inspections Duncan White, Region i Technical Quality of Licensing Actions Response to incidents and Allegations

i h

i 4

4 i

! i A

i t

APPENDIX B J

STATE OF MAINE BUREAU OF HEALTH DIVISION OF HEALTH ENGINEERING i RADIATION CONTROL PROGRAM j 1

ORGANIZATION CHARTS i

.i l

l l

l l

i

)

o

~. .-

Don A. MJh, MD, MPH ,

Dirurre Bureauof Heshh l l

l

! Philip WIWmes I j g% M hen Banlett  ;

Bureauof Heahh b  !

I i Office of '

._________.? Heakh Data and ,

Prognm Manstement l

-mal ToMgy

-Wrel RecortPs

-SchoofHeeNh fr*sstruchtre

-Snorwy Cy,, ~ ^

-Oste ernt Resterch

-CtRee of Prirnary HenNh Core

-nenhoe once er Ruretmeta I I l I Jack Kreuger GoughToppen RandySch=artz l' g-g 8

E T dng  % 4 kh Mame bbontory ____._ _____ - - _. . _ ..___ ~

h

-Croer.nstry -Promung Contmr 4pwggop,,,,, ,

-Carecer accroweregy -Red

  • greet HeeNN ' -nosercurests Ceneet

-E*0ng ernt Lodging ' pp,y,m

-Environmenter

-Canicer Cersnesson -OrhWas Wefer . I j _p ,n,see HeeNh

-orgonics C"" "'T h"?T , .

AssessmentProgram

. l

-Inorgems, nmerents, Heshh - Heanh _g,.:____ ;;pt,pem accrosofegyAgents Progisms i Prugams l -krwnvrdrofon Propom i -EPSDT

_.,_.-.._.] - . . , . . , . ~ - - . . -4mmpect

-Concer T'; - ... ..L . Uh4 -HeeNhy Femedes Progrern

-Breest ernf Cervicef -PubAie HeeN4 Nursing ..*

HeeNh Program -Women end Chhken's

-Communny HeeNW Pevenhve Hoseth Chronic Diseese Semces Program Prevention Unt -Lemi h%i,

}.$Hi*Cd// Of. b$Cdllb

- -orst HeeNPe Program Phrvention Program

-Coortenehnt Care Olgdfli{dll0Hal Chdi.l -D,,,iabetes

- ,,,y P,e.e.,,.

corholPro,ect orxt Contro# Program Se,,,ce, ,,,

Crim*en weh specast

- -Teen erwt Young Adnt Needs

&Yn HeeNPr Pmgram -Genefecs Program

' -Concer Re<jsery -wrc Progrdm 85i$

-OccupationalHeeN9r -State Sysrem Pmgram C ..%- :InRietive

-Nutnhan Program

. R/98

RADlATION CONTROL PROGRAM, DIVISION OF HEALTH ENGINEERING BUREAU OF HEALTH Line List and Funding Source 5/11/98 Clough Toppen Dwettor Dw unse 32-UZ2 I. Ut I  :

Joy Hyland dgr Radiation Control Petrock Dostee SN51 (

San Engr m sense Nuclear Impector J2-U161. D UU-1493 D Lande PhrsqueIInc A-rey Dale RendeH Assrstent 5M31

- Eng. Tech IV - Nuclear Engr Spec JZ-1906, D 09 2334, D Roger Camer A-roy

- tag Tech IV U0-1914, D Vocasut Metensis Lscensnig

- tavwon Spec m UU-is36, D Shawn Seeley Masensis Lscenssng 2 - Envar. Spec III UU-um, D Vecent LArw level weste

- Asst Engr UU-dJJ), D ,

Robert 5tdwen Redon Loordenssor

- tavwon Spec III UD-ITUI.t Geye Munen M - ._m

- Clerk Typest III Uo-Ivev t te KN

- Ciert Typnt III U0-2J36. D

.o APPENDIX C INSPECTION CASEWORK REVIEWS NOTE: ALL INSPECTIONS LISTED WITHOUT COMMENT ARE INCLUDED FOR COMPLETENESS ONLY; NO SIGNIFICANT COMMENTS WERE IDENTIFIED BY THE IMPEP TEAM.

File No.: 1 Licensee: Bath Iron Works License No.: 23209 Location: Bath, ME Inspection Type: Routine, Unannounced License Type: Industrial Radiography Priority: 1 Inspection Date: 8/24/98 Inspector: SS Comments:

a) Transportation requirements, such as blocking / bracing package, placarding vehicle were not verified.

b) inspection 3 months overdue.

File No.: 2 Licensee : Elite inspection Service License No.: 05703 Location: Portland, ME Inspection Type: Initial, Unannounced License Type: Industrial Radicy.9hy Priority: 1 Inspection Date: 9/3/97 Inspector: SS c Comments:

a) Initial inspection 11 months overdue.

b) Licensee did not take appropriate corrective action. Regulations require daily checks of visible signals / audible alarms in exposure room. Licensee stated they would check quarterly.

File No.: 3 Licensee: Quality Assurance Labs License No.: 05139 Location: South Portland, ME Inspection Type: Routine, Unannounced License Type: Industrial Radiography Priority: 1 Inspection Date: 8/6/98 Inspector: JH l Comment:

a) No supervisory review of inspection report at time of review.

l File No.: 4 l Licensee: Aroostook Medical Center License No.: 03803-01 l Location: Presque Isle, ME Inspection Type: Routine, Unannounced l License Type: Teletherapy Priority: 1 Inspection Date: 6/11/98 Inspectors: SS/JH File No.: 5 Licensee: Aroostook MedicalCenter License No.: 03803-02 Location: Presque Isle, ME Inspection Type: Routine, Unannounced License Type: Medical Priority: 3 Inspection Date: 6/11/9d inspector: SS Comment:

a) Inspection letter sent 3 months after inspection was completed.

c. . .- , .

Maine Final Report Page C.2 Inspection File Reviews File No.: 6 Licensee: University of Maine License No.: 19827-01 Location: Orono, ME Inspection Type: Routine, Unannounced License Type: Academic Type A Broad Priority: 2 Inspection Date: 8/20/98 Inspector: SS Comments:

a) Inspection 18 months overdue.

b) No supervisory review of inspection report.

File No.: 7 Licensee: Pharm-Corp of Maine License No.: 01713-01 Location: Augusta, ME Inspection Type: Routine, Unannounced License Type: Nuclear Pharmacy Priority: 1 Inspection Date: 9/14/98 Inspector: SS Comment:

a) No supervisory review of inspection report.

File No.: 8 Licensee: Jackson Labs License No.: 09507-01 Location: Bar Harbor, ME Inspection Type: Routine, Unannounced License Type: R&D, Type A Broad Priority: 2 Inspection Date: 3/18/98 Inspector: SS Comments:

a) Licensee was previously cited for not doing contamination surveys. Inspector should have checked for contamination in labs using wipes.

b) Inspection 13 months overdue.

File No.: 9 Licensee: Diamed, Inc. License No.: 05349 Location: South Windham, ME Inspection Type: Routine, Unannounced License Type: Manufacturing. & Distribution-Other Priority: 2 Inspection Date: 9/19/97 Inspector: SS Comment:

a) Contamination wipes should have been taken by inspector to verify surveys were performed.

File No.: 10 Licensee: Eastern Maine Medical Center License No.: 19301-01 Location: Bangor, ME Inspection Type: Routine, Unannounced License Type: Medical /OMP required Priority: 3 Inspection Date: 9/8/98 Inspector: SS Comments:

a) Inspection 3 months overdue.

b) Dosimetry records not reviewed.

c) Special inspection performed in 2/96 in response to brachytherapy allegation.

i e

Maine Final Report Page C.3 i inspection File Reviews t File No.: 11 Licensee: St. Mary's Regional Hospital License No.: 01709 ,

Location: Lewiston ME inspection Type: Routine, Unannounced  ;

License Type: Medical /OMP required Priority: 3 Inspection Date: 5/11/98 Inspector: SS Comment:

a) No supervisory review of inspection report.

File No.: 12 .

Licensee: St. Joseph's Hospital ,

License No.: 19705 Location: Bangor, ME Inspection Type: Routine, Unannounced License Type: Medical, OMP required Priority: 3 Inspection Date: 9/11/98 Inspector: SS Comments:

a) No supervisory review of inspection report, b) Licensee operations not evaluated, records review only, i

File No.: 13 Licensee: Houlton Regional Hospital License No.: 03409 Location: Houlton, ME Inspection Type: Routine, Unannounced License Type: Medical /OMP required Priority: 3 Inspection Date: 6/11/98 inspector: SS File No.: 14 Licensee: Northern Diagnostic Labs License No.: 05615-02 ,

Location: Scarborough, ME inspection Type: Routine, Unannounced i License Type: Self-Shielded Irradiator Priority: 3 .

Inspection Date: 9/2/98 Inspector: SS File No.: 15 Licensee: S.W. Cole Engineering License No.: 19709 Location: Bangor, ME Inspection Type: Routine, Unannounced License Type: Portable Gauge Priority: 3 Inspection Date: 6/5/97 Inspector: JH Comment:

a) Enforcement letter sent about revoking license if response was not sent in to Notice of Violation. Licensee sent response in immediately.

File No.: 16 Licensee: James River Corporation License No.: 19521 Location: Old Town, ME Inspection Type: Routine, Unannounced License Type: Fixed Gauge Priority: 3 Inspection Date: 1/4/96 Inspector: SS i

r k

[

O Maine Final Report Page C.4 Inspection File Reviews File No.: 17 Licensee: Maine Cardiology License No.: 05627 Location: Portland, ME Inspection Type: Routine, Unannounced License Type: Medical Private Clinic Priority: 3 Inspection Date: 1/31/96 Inspector: SS File No.: 18 Licensee: Inland Hospital License No.: 11921 Location: Waterville, ME Inspection Type: Routine, Unannounced License Type: Medical /OMP required Priority: 3 l Inspection Date: 1/16/97 Inspector: JH File No.: 19 Licensee: Maine DOT License No.: 19603 Location: Bangor, ME Inspection Type: Special, Unannounced License Type: Portable Gauge Priority: 3 Inspection Date: 7/14/98 Inspector: SS Comment:

a) State has done 2 field inspections after an inspection in 10/96 discovered numerous violations. Enforcement meeting held with licensee in 11/96 and licensee agreed to correct violations. No other escalated enforcement action required. Inspectors also did unannounced field inspections in 8/97 and 7/98. No violations were cited during last 2 inspections.

NEW LICENSES EVALUATED FOR ISSUE AND INITIAL INSPECTION DATE File No.: 1 Licensee: Mobile Spect Imaging, LLC License No.: 05701 Location: Portland, ME Inspection Type: Initial, Unannounced License Type: Mobile Nuclear Medicine Priority: 2 Inspection Date: 4/11/97 Inspector: SS i

Comments: >

a) Initial inspection not performed in 6 month frequency, license issued 8/9/95.

b) Inspector should verify requirements for mobile nuclear medicine are fulfilled as required by Section G of the regulations.

File No.: 2 j Licensee: Weavexx License No.: 25901 l Location: Waterville, ME Inspection Type: Initial, Announced l License Type: Portable Gauge Priority: 3 l inspection Date: 6/12/97 Inspector: JH i Comments: I a) Initial inspection not performed in 6 month frequency, license issued 3/1/96.

b) No supervisoty review of inspection report.

Maine Final Report Page C.5 i inspection File Reviews File No.: 3 Licensee: CV Diagnostic Services License No.: 11203 Location: Waterville, ME Inspection Type: Initial, Unannounced License Type: Medical Private Practice Priority: 3 Inspection Date: 9/7/98 Inspector. SS Comment: ,

2 a) Initial inspection not performed in 6 month frequency, license issued 9/11/97 File No.: 4 '

Licensee: M&H Logging & Construction License No.: 07401 Location: Rangeley, ME Inspection Type: Initial, Announced ,

License Type: Portable uauge Priority: 3

  • Inspection Date: 6/30/98 Inspector: SS 4

s Comment:

a) Initial inspection not performed in 6 month frequency, license issued 6/19/96.

File No.: 5 Licensee: R.W. Gillespie License No.: 31703 Location: Saco, ME Inspection Type: Initial, Unannounced License Type: Portable Gauge Priority: 3 Inspection Date: 12/28/95 Inspector: JH

, File No.: 6 Licensee: Marriners, Inc. License No.: 13601 Location: Rockport, ME Inspection Type: Initial, Unannounced License Type: Portable Gauge Priority: 3 Inspection Date: 6/10/96 Inspector: SS Comment:

a) Initial inspection not performed in 6 month frequency, license issued 6/20/95.

File No.: 7  :

Licensee: J. T. Langille,Inc. License No.: 03501 Location: Presque Isle, ME inspection Type: Initial, Unannounced -

License Type: Portable Gauge Priority: 3 Inspection Date: 1/22/97 Inspector: SS File No.: 8 Licensee: Dayton Sand & Gravel License No.: 31303 Location: Hollis Center, ME Inspection Type: Initial, Unannounced r License Type: Portable Gauge Priority: 3 Inspection Date: 1/14/98 Inspector: SS  ;

Comment:

a) Initial inspection not performed in 6 month frequency, license issued 10/25/96.

I

3 P

Maine Final Report Page C.6 inspection File Reviews File No.: 9 Licensee: GZA GeoEnvironmental License No.: 05403 Location: Portland, ME inspection Type: Initial, Unannounced License Type: Portable Gauge Priority: 3 Inspection Date: 8/5/97 Inspector: SS File No.: 10 Licensee: Thomas Dicenzo License No.: 29801 Location: Calais, ME Inspection Type: Initial, Unannounced License Type: Portable Gauge Priority: 3 inspection Date: 8/28/98 Inspector: SS Comment:

a) initial inspection not performed in 6 month frequency, license issued 3/10/97.

File No.: 11 Licensee: ATC Construction Corporation License No.: 05207 Location: Westbrook, ME Inspection Type: Initial, Unannounced License Type: Portable Gauge Priority: 3 Inspection Date: 1/15/98 inspector: SS File No.: 12 Licensee: Construction Materials License No.: 19203 Location: Bangor, ME Inspection Type: Initial, Unannounced License Type: Portable Gauge Priority: 3 Inspection Date: 9/8/98 Inspector: SS INSPECTOR ACCOMPANIMENTS in addition, the following inspection accompaniments were made as part of the on-site IMPEP review.

Accompaniment No.: 1 Licensee: Quality Assurance Labs License No.: 05139 Location: South Portland, ME Inspection Type: Routine, Unannounced License Type: Industrial Radiography Priority: 1 l Inspection Date: 8/6/98 Inspector: JH Accompaniment No.: 2 Licensee: Colby College License No.: 11219 )

Location: Waterville, ME Inspection Type: Routine, Announced i License Type: Academic Type C Broad Priority: 5 l Inspection Date: 8/7/98 Inspector: SS Comment:

a) Missed opportunities to interview radiation workers in laboratories.

l

APPENDIX D LICENSE CASEWORK REVIEWS NOTE: ALL LICENSES LISTED WITHOUT COMMENT ARE INCLUDED FOR COMPLETE-NESS ONLY; NO SIGNIFICANT COMMENTS WERE IDENTIFIED BY THE IMPEP TEAM.

File No.: 1 Licensee: Bishop Testing Services, Inc. License No.: 23207 Location: Topsham, ME Amendment No.: 1 License Type: Portable Gauge Type of Action: Termination Date issued: 12/20/96 License Reviewer: SS Comment:

a) Termination action complicated by the seizure of licensed material by the Internal Revenue Service.

File No.: 2 Licensee: Immunotech License No.: 05255-01 Location: Bar Mills, ME Amendment No.: none License Type: Manufacturing and Distribution Type of Action: Termination Date issued: 2/19/98 License Reviewer: SS File No.: 3 Licensee: Longview Inspection License No.: 17501 Location: Mexico, ME Amendment No.: O License Type: Industrial Radiography Type of Action: New Date issued: 8/25/98 License Reviewer: SS Comment:

a) Application did not include field forms referenced in licensee's procedures.

File No.: 4 Licensee: Mobile Spect Imaging, LLC License No.: 05701 Location: Portland, ME Amendment No.: 2 License Type: Mobile Nuclear Medicine Type of Action: Amendment Date issued: 8/7/97 License Reviewer: JH File No.: 5 Licensee: Penobscot Bay Medical Center License No.: 13701-01 Location: Rockport, ME Amendment No.: O License Type: MedicalInstitution Type of Action: Renewal Date issued: 12/16/96 License Reviewer: SS Comment; a) License did not incorporate correspondence in tie-down condition referenced in application.

?

Maine Final Report Page D.2 License File Reviews File No.: 6 Licensee: Maine Cardiology Associates License No.: 05627-01 Location: Portland, ME Amendment No.: 3 License Type: Limited Medical Type of Action: Renewal Date issued: 2/11/97 License Reviewer: SS File No.: 7-Licensee: Binax,Inc. License No.: 05243-01 Location: Portland, ME Amendment No.: 6 License Type: Manufacturing and Distribution Type of Action: Amendment Date issued: 10/9/96 License Reviewer: JH File No.: 8 Licensee: Bridge Corporation License No.: 11209 Location: Augusta, ME Amendment No.: O License Type: Portable Gauge Type of Action: Renewal Date issued: 8/8/96 License Reviewer: SS Comments:

a) Reviewer did not address requirements for survey instrument, annual audit or facility diagram, b) No documentation of deficiency telephone callin the file.

File No.: 9 Licensee: Weavexx License No.: 25901 Location: Norridgework, ME Amendment No.: O License Type: Portable Gauge Type of Action: New Date issued: 4/9/96 License Reviewer: SS File No.: 10 Licensee: University of Maine License No.: 19827-01 Location: Orono, ME Amendment No.: 2 License Type: Academic Broad Type A Type of Action: Amendment Date issued: 7/30/97 License Reviewer: SS File No.: 11 Licensee: Pharm-Oorp of Maine License No.: 11713-01MD Location: Augusta, ME Amendment No.: O License Type: Nuclear Pharmacy Type of Action: Renewal Date issued: 8/26/96 License Reviewer: SS Comments:

a) Correspondence dating back to June 1988 incorporated into license.

b) Renewal took 33 months to issue.

l

e Maine Final Report Page D.3 License File Reviews File No.: 12 Licensee: City of Lewiston License No.: 01501 Location: Lewiston, ME Amendment No.: 1 License Type: Portable Gauge Type of Action: Amendment Dato issued: 6/4/96 License Reviewer: SS Comment:

a) Application in license file included privacy information that was not redacted or identified as such.

File No.: 13 Licensee: Bates College License No.: 01205-01 Location: Lewiston, ME Arnendment No.: O License Type: Research and Development Type of Action: Amendment Date issued: 7/22/97 License Reviewer: SS File No.: 14 Licensee: Diamed, Inc. License No.: 05349 Location: South Windham, ME Amendment No.: 1 License Type: Manufacturing Type of Action: Amendment Date issued: 8/25/95 License Reviewers: SS, JH Comruent:

a) Use of nonstandard language in license condition.

File No.: 15 Licensee: Fraser Papers Inc. License No.: 03311 Location: Madawaska, ME Amendment No.: 1 License Type: Fixed Gauge Type of Action: Amendment Date issued: 8/26/98 License Reviewer: SS Comment:

a) Authorized user added to license without documentation of training or experience.

File No.: 16 Licensee: Maine Medical Center License No.: 05615-01 Location: Portland, ME Amendment No.: 2 License Type: MedicalInstitution Type of Action: Amendment Date issued: 5/28/97 License Reviewers: SS, JH File No.: 17 Licensee: National Semiconductor Corp. License No.: 05637-02 Location: South Portland, ME Amendment No.: 2 License Type: Self-Shielded irradiator Type of Action: Amendment Date issued: 7/17/98 License Reviewer: SS Comment:

a) No documentation of deficiency telephone callin the file.

1 ,

l Maine Final Report Page D.4 l l License File Reviews 1

i ,

i File No.: 18 Licensee: Aroostook Medical Center License No.: 03803-01  ;

i Location: Presque Isle, ME Amendment No.: 18 License Type: Teletherapy Type of Action: Amendment 3'

Date issued: 8/29/95 License Reviewer: SS File No.: 19 Licensee: CV Diagnostics,Inc. License No.: 11203

! Location: Waterville, ME Amendment No.: 1 License Type: Limited Medical Type of Action: Amendment Date issued: 8/27/98 License Reviewer: SS d

1 I

1 i

i i

a

APPENDIX E IMIDENT CASEWORK REVIEWS NOTE: ALL INCIDENTS LISTED WITHOUT COMMENT ARE INCLUDED FOR COMPLETE-NESS ONLY; NO SIGNIFICANT COMMENTS WERE IDENTIFIED BY THE IMPEP TEAM.

i File No.: 1 Licensee: Pharm-Corp of Maine Licensee No.: 11713-01MD incident Log No.: None l Site of incident: Lewiston, ME Date of incident: 3/21/96 1

Type of incident: Transportation Type of Investigation: None i investigation Date: N/A l Summary of incident and Final Disposition: Nuclear pharmacy delivery vehicle involved in a )

' traffic accident during delivery of radiopharmaceuticals to local hospitals. Police officer at the scene had hazardous material training and determined that packages were not damaged.

Packages were subsequently delivered to hospitals without incident. .

Comments: i a) No follow-up to incident during next inspection of licensee. l b) Incident not cross-referenced in license file.

File No.: 2 <

Licensee: Turner School District Licensee No.: Non-licensee Incident Log No.: None l Site of incident: Tumer, ME l

Date of incident: Unknown Type of incident: Abandoned material Type of Investigation: Site Investigation Date: 9/24/96 Summary of incident and Final Disposition: General licensed quantities of uranyl acetate and l

nitrate found in unoccupied school building. State personnel removed containers and transported back to office for disposal.

File No.: 3 Licensee: Penobscott Bay Medical Center Licensee No.: 13701 Incident Log No.: None investigation Date: 9/10/97 Date of Incident: 4/10/97 Type of incident: Procedural Failure Type of Investigation: Site Site of incident: Rock!end, ME Summary of incident and Final Disposition: A nuclear medicine technician failed to follow physician's instructions and administered Tc-99m hepatolite to patient when the result of a 3 previous diagnostic test did not require administration of the radiopharmaceutical. Licensee classified incident as a reportable event. State personnelidentified the incident during routine inspection and concurred with licensee's findings.

o  :

l Maine Final Report Page E.2 i I

Incident File Review l

i File No.: 4 i Licensee: Industrial Metals Licensee No.: Non-licensee  !

Incident Log No.: None Site of Incident: Arundel, ME i Date of Incident: 7/3/98  !

Type of incident: Contamination Event -

Type of Investigation: Site l Investigation Date: 7/6/98 .

Summary of incident and Final Disposition: Shipment of metal cans retumed to facility from Bethlehem Steel in Bethlehem, PA after load tripped the radiation monitor at the BJthlehem l facility. Radiation monitors were set at 10% above local backcraund. Truck retumed to Maine j under DOT exemption. State personnel surveyed truck and did not identify any radiation levels i above background. Truck and its contents were subsequently released. ,

Comments:

a) No documentation of event. {

b) No supervisory review.  !

File No.: 5 i Licensee: Worcester Energy Co. l Licensee No.: 29901 i Incident Log No.: None .

Site of incident: Cherryfield, ME  ;

Date of incident: 6/20/98  :

! Type of incident: Damage to Equipment j l Type of Investigation: Site  ;

j Investigation Date: 6/23/98 l

. Summary of incident and Final Disposition: Fire in plant area involved a fixed gauge. State j

, personnel responded to scene and surveyed gauge. Recommended that licensee have the l i manufacturer inspect gauge to determine if fire damaged the shielding to the source. j i

j Comments: i a) No documentation of event.

i b) No supervisory review.

c) No follow-up performed to determine if shielding was evaluated.

d) Event should have been reported to NRC for inclusion in NMED.