ML20205H933

From kanterella
Revision as of 13:18, 29 December 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Staff Requirements Memo Re Commission 881007 Meeting in Rockville,Md on Affirmation/Discussion & Vote
ML20205H933
Person / Time
Issue date: 10/25/1988
From: Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
To: Parler W
NRC OFFICE OF THE GENERAL COUNSEL (OGC)
References
REF-10CFR9.7 M881007B, NUDOCS 8810310225
Download: ML20205H933 (2)


Text

_ _ _ _ _ _ _ _ _ - - - _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _

w -

t (J-<L-)5

  • a

./ an:v % UNITED STATES IN RESPONSE, PLEASE

-f" ', NUCLEAR REGULATORY COMMISSION REFER Tot M881007B  ;

f, 1 W ASHIN GToN, D.C. 205S5 os $

,,,,,.*# October 25, 1988 OFFICt OF THE f SECRETARY i

MEMORANDUM FOR: William C. Parler, General Counsel  :

FROMt Samuel J. Chilk, Secreta )

SUEJECT: STAFF REQUIREMENTS - AFFZ m TION / DISCUSSION AND VOTE, 11:30 A.M., FRIDAY, OCTOBER 7,

[

1988, COMMISSIONERS' CONFERENCE ROOM, ONE ,

WHITE FLINT NORTH, ROCKVILLE, MARYLAND  ;

(OPEN TO PUBLIC ATTENDANCE) t I. SECY-88-243 - Release of PDR User Information [

i The Commission,* with Commissioners Roberts, Carr, and Rogers  !

agreeing, has approved a policy statement, as modified to L incorporate Commissioners' comments, which establishes NRC  !

employee procedures when requested to release information on  ;

users of the Public Document Room. Chairman Zech, while i supporting the intent of the policy statement, bellaved that a Manual Chapter was sufficient to guide the staff when  ;

confronted with such requests. l t

(Subsequent to the meeting on October 7, 1988, the Secretary i signed the Federal Register Notice.)

The Commission, with all Commissioners agreeing, also requested '

the office of the Secretary and the office of the General i Counsel to develop an appropriate Manual Chapter implementing i the pelicy statement. t (SECY/OGC) (SECY Sustanse: 11/25/88) (

i f

f I

  • Section 201 of the Energy Reorganization Act, 42 U.S.C. Sec. 5841, ptvvides chc* action of the Commission shall be deter =ined by a a ma3ot ily vote of the tw9mr= present." i commissiener noucrte was not present when this item was I affirmed. Accordingly, the formal vote of the Commission was l 2-1 in favor of the decision. Commissioner Roberts, however, go7- l had previously indicated that he would approve this paper and ht  !

had he been present he would have affirmed his prior vote. [

t\ [

8310310225 331025 PDR 10CFR l PT9.7 PDC I

_ . - - .1

II. S E QX_-8 8 -2 7 4 - Closina Out ALAB-883 (Holdino Siren Issues to be Resolved Before Low Power) . Public Service ComDany of New Hamoshire LQnsite Emerconcy Plannina and Safety Issues)

The Commission, with Chairman Zech and Commissioners Carr and Rogers agreeing, approved an order which:

(1) Stipulates that only those offsite standards specified in 10 cFR 50.47(d), as amended, are to be prerequisites to

'.ow power testing.

(2) Specifically vacates the Appeal Board's order that authorization of low-power operation may not be given effect until the contested issues about such a system are resolved favo.rably for Seabrook. '

I (3) Directs the Chairman of the Atomic Safety and Licensing Board Panel, in consultation with the Seabrook "onsite" and "offsite" Atomic Safety and Licensing Boards, to  ;

determine which of those Licensing Boards shou'i try the  ;

prompt notification issues.

l Commissioner Roberts was en travel and unavailable to participate.

1 (Subsequent to the meeting on October 7, 1988, the Secretary signed the order.)

i cct Chairman Zech j Commissioner Roberts Commissioner Carr i

Commissioner Rogers

, GPA

! EDO PDR - Advance DCS - pl-124 D