Informs That Enclosed Amend to Commission Rule in 10CFR72 Has Been Sent to Fr for Publication,Elimination Requirement That Rept of Preoperational Testing of ISFSI or Monitored Retrievable Storage Installation Be Submitted to NRC
ML20206L916
Person / Time
Issue date: 04/12/1999
From: Rathbun D
NRC OFFICE OF CONGRESSIONAL AFFAIRS (OCA)
To: J. J. Barton, Inhofe J
HOUSE OF REP., SENATE, ENVIRONMENT & PUBLIC WORKS
References
FRN-63FR49046, RULE-PR-72 CCS, NUDOCS 9905140142
Download: ML20206L916 (8)


Text

, ,

,tk/L $5N c uruq g* UNITED STATES s

'h

,j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30866-0001 9,,,,,# April 12, 1999 The Honorable James M. Inhofe, Chairman Subcommittee on Clean Air, Wetlands, Private Property and Nuclear Safety Committee on Environment and Public Works United States Senate Washington, DC 20510

Dear Mr. Chairman:

The U.S. Nuclear Regulatory Commission (NRC) has sent the enclosed amendment, to the Commission's rule in 10 CFR Part 72, to the Office of the Federal Register for publication.

The final rule will eliminate the requirement that a report of the preoperational testing of an independent spent fuel storage installation or monitored retrievable storage installation be submitted to NRC at least 30 days before the receipt of spent fuel or high level radioactive waste. Experience has shown that the staff does not need the reporting or the holding period, because the staff is on site and evaluates preoperational testing as it occurs.

~'

Sincerely, t FL Dennis K. Ratibun, Director Office of Congressional Affairs

Enclosure:

Federal Reoister notice cc: Senator Bob Graham 1

}

9905140142 990412 i PDR PR 72 63FR49046 PDR

ypscnuq p* 1 UNITED STATES g j 2

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30806 4 001-p

.....* April 12, 1999 The Honorable Joe L. Barton Chairman, Subcommittee on Energy and Power Committee on Commerce United States House of Representatives Washin0 ton, DC 20515

Dear Mr. Chairman:

The U.S. Nuclear Regulatory Commission (NRC) has sent the enclosed amendment, to the Commission's rule in 10 CFR Part 72, to the Office of the Federal Register for publication.

The final rule will eliminate the requirement that a report of the preoperational testing of an independent spent fuel storage installation or monitored retrievable storage installation be submitted to NRC at least 30 days before the receipt of spent fuel or high-level radioactive waste. Experience has shown that the staff does not need the reporting or the holding period, because the staff is on site and evaluates preoperational testing as it occurs.

Sincerely, ,_

o r

.A Dennis K. Rathbun, Director Office of Congressional Affairs

Enclosure:

j Federal Reaister notice q cc; Representative Ralph Hall i

l

. . . . . . . . . . .. . . . . . . .. . .I

r~ m 1~,

O 24722 1

~

Submission of Federal Rules A

Under the Congressional Review Act

[D President of the Senate O Speaker of the House of Representatives O GAO Plase fill the circles electronically or with black pen or #2 pencil.

1. Name of Department or Agency 2. Subdivision or Office U. S. Nuclear Regulatory Commission Office of Nuclear Material safety and Safeguards
3. Rule Title Elimination of Reporting Requirement and 30-Day Hold in Loading Spent Fuel after Preoperational Testing of (

Independent Spent Fuel or Monitored Retrievable Storage Installations I I

4. Regulation Identfier Number (RIN) or Other Unique identfier (if applicable) l RIN 3150-AG02 1
5. Major Rule O Non-major Rule G l
6. Final Rule G Other O 1
7. With respect to this rule, did your agency solset public comments? Yes G No O N/A O
8. Pnority of Regulaton(fillin one)

O Economically Significant; or O Routine and Frequent or Significant; or informational / Administrative /Other Substantve, Nonsignificant (Do not complete the other side of this form if filled in above.)

9 Effectve Date (if applicable) May 1,1999

10. Concise Summary of Rule (fillin one or both) attached O stated in rule e Submitted byf d IA I rH a (signature)

Name. Dennis K. Rathbun Tree: Director, Office of Congressional Affairs April 12, 1999 I

For Congressional Use Only:

Date Received.

Committee of Junsdicton:

3/23/99 n

U l 1

D, . , #, L,J l 24722 Yes No N/A A. With respect to this rule, did your agency prepare an analysis of costs 9 O O and benefits?

B. With respect to this rule, by the final rulemaking stage, did your agency

1. certify that the rule would not have a significant economic impact on a e O O substantial number of small entities under 5 U.S.C. 9 605(b)?
2. prepare a final Regulatory Flexibility Analysis under 5 U.S.C. 9 604(a)? O 9 O C. With respect to this rule, did your agency prepare a written statement under O O O 9 202 of the Unfunded Mandates Reform Act of 19957 D. With respect to this rule, did your agency prepare an Environmental Assessment O O 9 or an Environmental Impact Statement under the National Environmental Policy Act (NEPA)?

E. Does this rule contain a collection of information requiring OMB approval O O O under the Paperwork Reduction Act of 19957 F. Did you discuss any of the following in the preamble to the rule? O 9 O e E.O.12612, Federalism O O O e E.O.12630, Govemment Actions and interference with Constitutionally O O O Protected Property Rights e E.O.12866, Regulatory Planning and Review O O O e E.O.12875,EnhancingtheintergovemmentalPartnership O O O e E.O.12988, Civil Justice Reform O O O e E.O.13045, Protection of Children from Environmental Health Risks O O O and Safety Risks e Other statutes or executive orders discussed in the preamble conceming the rulemaking process (please specify) 3/23/99

,q

. 1 L_J

LJ .m.i 24722 l Em :

Submission of Federal Rules Under the Congressional Review Act O President of the Se: .te EI Speaker of the House of Representatives O GAO Pirse fill the circles electronically or with black pen or #2 pencil.

1. Name of Department or Agency 2. Subdivision or Office U. S. Nuclear Regulatory Commission Office of Nuclear Material safety and Safeguards

~

3. Rule Title Elimination of Reporting Requirement and 30-Day Hold in Loading Spent Fuel after Preoperational Testing of Independent Spent Fuel or Monitored Retrievable Storage Installations l l

1

4. Regulation Identfier Number (RIN) or Other Unique Identfier (if applicable)

RIN 3150 AG02 i

5 Major Ruie O Non-major Rule 9 )

i

6. Final Rule e Other O
7. W.th respect to this rule, did your agency solict public comments? Yes G No O N/A O
8. Pnonty of Regulation (fillin one) e Economically Significant, or O Routine and Frequent or Significant; or Informatonal/Administratve/Other Substantve, Nonsignificant (Do not complete the other side of this form j if filled in above.)

O. Effective Date (if appheable) May 1,1999 l

10. Concise Summary of Rule (fillin one or both) attached O stated in rule e

)

Submitted by s[ M 1/.I.-v (signature)

Name: Dennis K. Rathbun Title. Director, Office of Congressional Affairs April 12, 1999 For Congressional Use Only:

Date Received Committee of Junsdicton:

3/23/99 0 \

, ~R,Og U

ums Il d

24722.

Yes' No N/A

' A. - With respect to this rule, did your agency prepare an analysis of costs 9 O O and benefits?

B. With respect to this rule, by the final rulemaking stage, did your agency 1, certify that the rule would not have a significant economic impact on a # O O substantial number of small entities under 5 U.S.C. $ 605(b)?

2. prepare a final Regulatory Flexibility Analysis under 5 U.S.C. 6 604(a)? O' e O C. With respect to this rule, did your agency prepare a written statement under O O O

$ 202 of the Unfunded Mandates Reform Act of 19957 D. With respect to this rule, did your agency prepare an Environmental Assessment O O 9 or an Environmentallmpact Statement under the National Environmental Policy Act (NEPA)?

E. Does this rule contain a collection of information requiring OMB approval O e O under the Paperwork Reduction Act of 19957 F. Did you discuss any of the following in the preamble to the rule? O O O e E.O.12612,Federatism O O O e E.O.12630, Govemment Actions and Interference with Constitutionally O O O Protected Property Rights e E.O.12866, Regulatory Planning and Review 0 0 O e E.O.12875, Enhancing the Intergovemmental Partnership O O O m o E.O.12988, CivilJustice Reform O- O O q e E.O.13045, Protection of Children from Environmental Health Risks O O O. I and Safety Risks e Other statutes or executive orders discussed in the preamble .

conceming the rulemaking procsss (please specify)

]

3/23/99 .

j f k u

E

, r~

- a g- .

24722 1 Submission of Federal Rules Under the Congressional Review Act O President of the Senate O Speaker of the House of Representatives B GAO PI::se fill the circles electronically or with black pen or #2 pencil.

1. N:me of Department or Agency 2. Subdivision or Office U. S. Nuclear Regulatory Commission Office of Nuclear Material safety and Safeguards
3. Rule Title Elintination of Reporting Requirement and 30-Day Hold in Loading Spent Fuel after Preoperational Testing of Independent Spent Fuel or Monitored Retrievable Storage Installations 4 Regulation Identfier Number (RIN) or Other Unique identfier (if applicable)

RIN 3150-AG02

5. Major Rule O Non-major Rule 9
6. Final Rule G Other O
7. With respect to this rule, did your agency solict public comments? Yes e No O N/A O
8. Pnonty of Regulaton (fillin one) l l 9 Economically Significant; or O Routine and Frequent or l Significant, or Informational /Administrabye/Other l Substantve, Nonsignificant (Do not complete the other side of this form if $lled in above.)
9. Effective Date (if applicable) May 1,1999
10. Concise Summary of Rule (fillin one or both) attached O stated in rule e Submitted by( /_ l_( *f 4 (signature)

Name Dennis K. Rathbun b Trae: Director, Office of Congressional Affairs April 12 3 1999 l

l l

l For Congressional Use Only:

1 Date Received. l Committee of Junsdicbon' 3/23/99 p

L-l

...-- . ..J

n. rm I . [_ O ,g  !

24722 ^

)

Yes No N/A A. With respect to this rule, did your agency prepare an analysis of costs e O O and benefits?

B. With respect to this rule, by the final rulemaking stage, did your agency

1. certify that the rule would not have a significant economic impact on a G O O substantial number of small entities under 5 U.S.C. 6 605(b)?
2. prepare a final Regulatory Flexibility Analysis under 5 U.S.C. 6 604(a)? O O O C. With respect to this rule, did your agency prepare a written statement under O O O

$ 202 of the Unfunded Mandates Reform Act of 19957 D. With respect to this rule, did your agency prepare an Environmental Assessment O O O or an Environmental Impact Statement under the National Environmental Policy Act (NEPA)?

E. Does this rule contain a collection of information requiring OMB approval O O O under the Paperwork Reduction Act of 19957 F. Did you discuss any of the following in the preamble to the rule? O O O e E.O.12612 Federalism O O O e E.O.12630. Govemment Actions and Interference with Constitutionally O O O Protected Property Rights e E.O.12866 Regulatory Planning and Review O O O e E.O.12875. Enhancing the Intergovemmental Partnership O O O l

e E.O.12988, Civil Justice Reform O O O  !

)

e E.O.13045, Protection of Children from Environmental Health Risks O O O J' and Safety Risks e Other statutes or executive orders discussed in ~the preamble concoming the rulemaking process (please specify) l l

3'23/93 R

a

a CONGRESSIONAL CORRESPONDENCE SYSTEM DOCUMENT PREPARATION CHECKLIST This check list is to be submitted with each document (or group of Os/As) sent for processing into the CCS.

1. BRIEF DESCRIPTION OF DOCUMENT (S) Moo y Gam <s.Onleto i i

- vbhd

2. TYPE OF DOCUMENT X CORRESPONDENCE HEARINGS (Os/As)
3. DOCUMENT CONTROL X SENSITIVE (NRC ONLY) X NON-SENSITIVE
4. CONGRESSIONAL COMMITTEE AND SUBCOMMITTEE (if applicable)

Congressional Committee Subcommittee

5. . SUBJECT CODES (A)

(B)

(C)

6. SOURCE OF DOCUMENTS (A) 5520 (DOCUMENT NAME (B) SCAN (C) ATTACHMENTS (D) OTHER
7. SYSTEM LOG DATES

, (A)J//J/11 DATA OCA SENT DOCUMENT TO CCS (B) DATE CCS RECEIVED DOCUMENT (C) DATE RETURNED TO OCA FOR ADDITIONAL INFORMATION (D) DATE RESUBMITTED BY OCA TO CCS (E) DATE ENTERED INTO CCS BY (F) DATE OCA NOTIFIED THAT DOCUMENT IS IN CCS COMMENTS:

' b.!U35 RELEASE TO PDR 11/03'98 P:\DISRTLIS. OMS

h

[7590 01 P] .

NUCLEAR REGULATORY COMMISSION 10 CFR Part 72 RIN 3150 AG02 Elimination of Reporting Requirement and 30-Day Hold in Loading Spent Fuel After Preoperational Testing of Independent Spent Fuel Storage or Monitored Retrievable Storage Installations AGENCY: Nuclear Regulatory Commission.

ACTION: Final rule.

SUMMARY

The Nuclear Regulatory Commission (NRC) is amending its regulations to eliminate the requirement that a report of the preoperational testing of an independent spent fuel storage installation or monitored retrievable storage installation be submitted to the NRC at least 30 days before the recs lpt of spent fuel or high level radioactive waste. Experience has shown that the NRC staff does not need the report or the holding period because the NRC staff is on site and evaluates preoperational testing as it occurs. This amendment will eliminate an unnecessary regulatory impact on licensees.

t ') o Ak '

. l

^

- EFFECTIVE DATE: (30 days from date of publication in the Federal Register). l FOR FURTHER INFORMATION CONTACT: Gordon Gundersen, Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, V/ashington, DC 20555-0001, telephone (301) 415-6195, e-mail geg1 @ nrc. gov.

SUPPLEMENTARY INFORMATION: ,

Background

l On September 14,1998 (63 FR 49046), the NRC published a proposed rule in the Federal Register that would amend NRC's regulations in 10 CFR Part 72 to eliminate a preoperational testing reporting requirement and a 30-day hold in loading spent fuel. Part 72 I

requires that the conditions for a site-specific license (10 CFR 72.24(g)) and the conditions for a Certificate of Compliance (CoC) (10 CFR 72.236(l)) contain requirements for the performance of preoperational testing by the site specific licensee or the general licensee, respectively. The licensee is required to complete the preoperational testing program described in the applicable Safety Analysis Report (SAR) before spent fuel is loaded into an independent spent fuel storage installation (ISFSI) or before spent fuel or high-level radioactive waste (HLW) la loaded into a monitored retrievable storage installation (MRS). Information on the preoperational test program, including the specific tests and their acceptance criteria, are contained hi the SAR submitted by the site-specific licensee or by the certificate holder for the design of the spent fuel storage cask to be used by the general licensee.

2

4 a

Section 72.82(e) requires licensees to submit to the NRC a report of the preoperational test acceptance criteria and test results at least 30 days before the receipt of spent fuel or HLW for loading into an ISFSI or MRS. However, the licensee is not required to submit test j procedures, only a summary report of the test results. A copy of this report is subsequently i

placed in the NRC Public Document Room (PDR). The purpose of the 30-day period is to 1 establish a sufficient hold point to ensure that the NRC has sufficient time to inspect a new licensee's preparations and, if necessary, exercise its regulatory authority before spent fuel is received at an ISFSI or spent fuel and HLW at an MRS. The licensee is not required to obtain NRC approval of the report before commencing loading operations.  !

)

I Comments on the Proposed Rule i

The Commission received four letters commenting on the proposed rule. Copies of the letters are available for public inspection and copying for a fee at the Commission's Public Document Room, located at 2120 L Street, NW. (Lower Level), Washington, DC. One letter l

was from NEl, one letter from a CoC holder, and two letters were from utilities holding 10 CFR j Part 50 reactor licenses. All of the letters supported the proposed rule. One utility quantified the savings of eliminating the 30-day hold as more than $300,000.

Discussion The requirement for a preoperational test report and 30-day hold period was added to the Part 72 regulations governing licensing requirements for ISFSis and an MRS at the time they became effective on November 28,1980 (45 FR 74693), and before the NRC staff had any practical experience in licensing such facilities. However, in the intervening period, the 3

l

9 Commission's practice has been for the NRC staff to maintain an extensive oversight presence during the preoperational testing phase of ISFSis, reviewing the acceptance criteria, preoperational test, and test results as they occur. Thus, NRC staff has had immediate access to the licensee's procedures and test results, and has not needed either a preoperational test report or a 30-day hold period in order to complete its inspection activities and determine whether any further regulatory action is needed before the licensee begins to load spent fuel or HLW.

The NRC inspection program now in place (i.e., inspection Manual Chapter 2690 and Inspection Procedures 60854 and 60855) ensures that the NRC staff will review the licensee's normal, abnormal, and emergency operating procedures, (including loading and unloading procedures), as well as observe implementation of those procedures during preoperational testing. Consequently, NRC staff is in a position to ensure that the licensee has resolved any  ;

f problems before loading spent fuelinto the ISFSI. NRC staff documents the results of the inspection of the preoperational test program in a written inspection report, which is subsequently placed in the PDR. This report contains conclusions on whether the licensee has adequately completed the preoperational test program, an assessment of the licensee's performance in completing the preoperational test program, and an assessment of the licensee's readiness to begin loading spent fuel or HLW.

Notwithstanding that the current regulation ensures that the NRC will be notified by the ,

licensee before it begins loading spent fuel, other regulations and processes provide adequate assurance that the NRC will be aware of a licensee's anticipated loading activities. For ISFSIs at operating reactor sites, the Commission expects that on-site NRC resident inspector staff would be aware of any potential fuel loading activities. Additionally, general licensees are 4-I t-

required by 10 CFR 72.212(b)(1)(i) to notify the NRC at least 90 days before spent fuel loading begins. For site-specific licensees, the fact that a license has been issued serves as adequate

. notice to the NRC that spent fuel loading activities are planned. Further, site-specific licensees are also required by 10 CFR 72.70(a) to submit a final safety analysis report to the Commission at least 90 days before spent fuel loading begins.

The public will retain the ability to review a description of the preoperational tests and their acceptance criteria because this information is contained in the SAR, which is available for review in the NRC PDR. Relevant information on the preoperational test program and the results of the preoperational test program both remain available for public review in the SAR and the inspection report, respectively.

The NRC staff's experience has also been that the 30-day hold established by 10 CFR i

72.82(e) creates a potentially significant financial burden for licensees because, during the 30-day period, the licensee can perform no loading activities even though the licensee is ready I

to load spent fuel or HLW. This has resulted in five requests for exemptions in the last 3 years (1995 - 1998) by licensees and the need for the NRC staff to expend time processing these requests. The elimination of this regulation will preclude the need for exemption requests, enable the licensee to use the crew assembled for fuel transfer while the lessons of preoperational testing are fresh in their minds, and contribute to the efficiency of operations by avoiding unnecessary idle time. The NRC on-site inspection staff observing the ~-

spent fuel loading will similarly benefit.

Therefore, the Commission is removing 10 CFR 72.82(e) from NRC's regulations because neither the report nor the 30-day hold period are needed for regulatory purposes and 5

' that taking this action will relieve licensees from an unnecessary regulatory burden. Although elimination of this repoding requirement will reduce the information which has been available to the public, the alternative sources of information available to the public on preoperetional test activities are sufficient to allow for public review.

Environmental impact: Categorical Exclusion The NRC has determined that this final rule is the type of action described as a '

categorical exclusion in 10 CFR 51.22(c)(3)(iii). Therefore, neither an environmental impact statement nor an environmental assessment has been prepared for this final rule.

Paperwork Reduction Act Statement This final rule decreases the burden on licensees by eliminating 10 CFR 72.82(e) and the associated reporting burden. The burden reduction for this information collection is estimated to average 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> per request. Because the burden for this information collection is insignificant, Office of Management and Budget (OMB) clearance is not required. Existing requirements were approved by the Office of Management and Budget, approval number 3150-0132.

Public Protection Notification if a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.  ;

6 l 1

i

Regulatory Analysis

~

The amendment will eliminate the requirement that 10 CFR Part 72 licensees submit a report of the preoperational test acceptance criteria and test results at least 30 days before the receipt of spent fuel or HLW on the grounds that NRC's inspection program ensures that the NRC staff will be present for observance of preoperational testing to ensure that a licensee is prepared to safely load spent fuel or HLW. Thus, the report and the 30-day hold period are not needed for NRC's regulatory activities.

The benefit of the rule is that elimination of a report and 30-day hold period not needed by the NRC will reduce an unnecessary regulatory impact on licensees resulting from the .

30-day waiting period following submittal of a report of the preoperational test criteria and test results to the NRC. During this period, the licensees can perform no loading activities even though the licensee is ready to load spent fuel or HLW This imposes a potentially significant financial burden on licensees. The rule will also relieve both licensees and the NRC staff from the need to process exemption requests. The Commission has received and approved several requests for exemption from 10 CFR 72.82(e) and envisions that most future Part 72 licensees will also apply for exemption from this regulation.

An impact of the final rule will be that a report of the preoperational test criteria and test results will no longer be available. However, information on the preoperational test criteria is contained in the SAR, which is available for review in the NRC PDR. In addition, NRC ~

inspection reports will contain NRC findings on the preoperational testing and assessments on the licensee's readiness to commence loading spent fuel. These inspection reports are L available in the NRC Public Document Room system. The NRC also considered the altemative I _7

of shortening rather than eliminating the hold period but rejected this alternative because it would have retained a requirement not needed for regulatory purposes and thus would have imposed an unnecessary regulatory burden on licensees.

Regulatory Flexibility Certification in accordance with the Regulatory Flexibility Act of 1980 as amended 5 U.S.C. 605(b),

the Commission certifies that this final rule will not have a significant economic impact on a substantial number of small entities. This final rule would affect only the operators of ISFSis.

These companies do not fall within the scope of the definition of "small entities" set forth in the Regulatory Flexibility Act or the Small Business Size Standards set out in regulations issued by the Small Business Administration at 13 CFR Part 121.

Backfit Analysis f The NRC has determined that the backfit rule,10 CFR 72.62, does not apply to this rule, because this amendment does not involve any provisions that would impose backfits as defined in 10 CFR 72.62(a). Therefore, a backfit analysis is not required for this final rule.

Small Business Regulatory Enforcement Fairness Act .

in accordance with the Small Business Regulatory Enforcement Fairness Act of 1996, the NRC has determined that this action is not o. " major rule" and has verified this determination with the Office of information and Regulatory Affairs, Office of Management and Budget.

8

. . 1 i

. ]

  • . j
  • Compatibility of Agreement State Regulations j

Under the " Policy Statement on Adequacy and Compatibility of Agreement State .

Programs," approved by the Commission on June 30,1997, and published in the Federal Register on September 3,1997 (62 FR 46517), this rule is classified as compatibility Category "NRC." Compatibility is not required for Category "NRC" regulations. The NRC program l elements in this category are those that relate directly to areas of regulation reserved to the NRC by the AEA, or the provisions of Title 10 of the Code of Federal Regulations. Although an i Agreement State may not adopt program elements reserved to NRC, it may wish to inform its licensees of certain requirements, by a mechanism that is consistent with the particular State's administrative procedure laws but does not confer regulatory authority on the State.

List of Subjects in 10 CFR Part 72 Criminal penalties, Manpower training programs, Nuclear materials, Occupational safety and health, Reporting and recordkeeping requirements, Security measures, Spent fuel.

i For the reasons set out in the preamble and under the authority of the Atomic Energy Act of 1954, as amended; the Energy Reorganization Act of 1974, as amended; and 5 U.S.C.

553; the NRC is proposing to adopt the following amendment to 10 CFR Part 72.

l l

9 I u

m__..___1.___i___.________________. .i . . . , , . . -

) PART 72-LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL AND HIGH-LEVEL RADIOACTIVE WASTE l

)

1. The authority citation for Part 72 continues to read as follows:

AUTHORITY: Secs. 51, 53, 57, 62, 63, 65, 69, 81,161,182,183,184,186,187,189, 68 Stat. 929, 930, 932, 933, 934, 935, 948, 953, 054, 955, as amended, sec. 234,83 Stat.

444, as amended (42 U.S.C. 2071,2073,2077,2092,2093,2095,2099,2111,2201,2232, ,

1 2233, 2234, 2236,2237,2238,2282); secs. 274, Pub. L.86-373,73 Stat. 688, as amended (42 U.S.C. 2021); sec. 201, as amended,202,206,88 Stat.1242, as amended 1244,1246 (42 i

U.S.C. 5841, 5842, 5846); Pub. L.95-601, sec.10,92, Stat. 2951 as amended by Pub. L. j l

102-486, sec. 7902,106 Stat. 3123 (42 U.S.C. 5851); sec.102, Pub. L.91-190,83 Stat. 853 j (42 U.S.C. 4332); secs.131,132,133,135,137,141, Pub. L.97-425,96 Stat. 2229,2230, 2232,2241, sec.148, Pub. L.100-203,101 Ctat.1330-235 (42 U.S.C.10151,10152,10153, 10155,10157,10161,10168).

Section 72.44(g) also issued under sec.142 (b) and 148 (c), (d), Pub. L.100-203,101 Stat.1330-232,1330-236 (42 U.S.C.10162 (b),10168 (c), (d)). Section 72.46 also issued under sec.189,68 Stat. 955 (42 U.S.C. 2239); sec.134, Pub. L.97-425,96 Stat. 2230 (42 U.S.C.10154). Section 72.96(d) also issued under sec.145(g), Pub. L.100-203,101 Stat.

1330-235 (42 U.S.C.10165(g)). Subpart J also issued under secs. 2(2),2(15),2(19),117(a),

141(h), Pub. L.97-425,96 Stat. 2202,2203, 2204,2222,2224 (42 U.S.C.10101,10137(a),

10161(h)). Subparts K and L are also issued under sec.133,98 Stat. 2230 (42 U.S.C.10153) t and sec. 218(a), Stat. 2252 (42 U.S.C.10198). )

i l

10~ ,

? .

o (6 72,82 Amended 1

2. Section 72.82 is amended by removing paragraph (t,).

Dated at Rockville, Maryland this 23rd dayof March .1999.

For the Nuclear Regulatory Commission.

, Ahlln m William D. Travbrs, Executive Director for Operations.