Board Notification 86-026:forwarding Partially Withheld Ofc of Investigations Investigation Rept 4-84-047 Re Alleged Falsification of Test Results at Facility
ML20207D006
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 12/29/1986
From: Noonan V
Office of Nuclear Reactor Regulation
To: Bloch P, Jordan W, Mccollom K
Atomic Safety and Licensing Board Panel
Shared Package
ML20207D010 List:
References
CON-#187-2101, TASK-AS, TASK-BN86-026, TASK-BN86-26 BN-86-026, BN-86-26, OL, NUDOCS 8612300300
Download: ML20207D006 (3)


Text

._ . . _ _ - .

on n:g

  • j jog
  • UNITED STA[ES f

(.

O

p g NUCLkAR REGULATORY COMMISSION WASHINGTON. D. C. 20555

\*****/ 2 g DEC W Docket Nos.: 50-445 and 50-446 MEMORANDUM FOR: The Atomic Safety and licensing Board for Comanche Peak (P. B. Bloch, W. P. Jordan, K. A. McCollom, E. B. Johnson)

FROM: Vincent S. Noonan, Director Project Directorate No. 5 Division of PWR I.icensing-A

SUBJECT:

COMANCHE PEAK OI REPORT: AU.EGED FAI.SIFICATION OF TEST RESULTS (80ARD NOTIFICATION NO. 86-26 )

The Office of Investigations has completed its review of Case Number 4-84-047 regarding alleged falsification of test results.

During September 1984, a former start-up engineer, WITNESS F, previously employed in an electrical test group at the Comanche Peak Steam Electric Station, appeared as an intervenor witness before the Atomic Safety and I.icensing Board. During subsequent in camera ASl8 hearings, the utility called witnesses and introduced evidence lefore the ASI.B which indicated that in 1982, WITNESS F deceived a quality assurance technician during a preoperational test on a safety system which resulted in the falsification of the preoperational test report. The ASI.8 requested that the Nuclear Regulatory Commission's Office of Investigations be notified of this incident.

The results for this investigation did not established that the former start-up engineer deceived a quality assurance technician nor did it establish that a preoperational test was falsified.

Because the I.icensing Board held hearings regarding these matters and because there are inconsistencies between a witnesses' testimony at the hearings and a statement taken by the NRC investigator during this investigation, this report is being provided to the licensing Board.

- j

// / / /

gWe . oo a ; -i.(edur PWR Proj ct Di ctorate No. 5 Divisio of PWR I.icensing-A

Enclosure:

Report of Investigation (Case No. 4-84-047) cc: See next page (861230030h Naas 1/