(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
|
---|
Category:BOARD NOTIFICATION (TO LICENSING BOARD OR LICENSING
MONTHYEARML20062J1941993-02-0303 February 1993 Board Notification 93-001:notifies of 930202 Emergency Motion to Stay Issuance of low-power OL Requesting Listed Items Including Issue Order Staying Issuance of License ML20155A7331988-06-0707 June 1988 Board Notification 88-005:forwards Ofc of Investigation Rept of Inquiry Q4-87-014 Re Circumstances Surrounding Failure of Util to Provide Mgt Analysis Co Rept on Timely Basis in Response to Intervenor Discovery Request ML20154D7721988-05-17017 May 1988 Board Notification 88-003:forwards DC Williams Gao, Special Rept,Ofc of Special Investigations & NRC 880425 Press Release Indicating That Rept Made Available to Public. Record Copy ML20195J1241988-01-15015 January 1988 Board Notification 88-001:notifies That Intimidation & Contention 5 Panels on Plant Disbanded by EDO on 870306. Cases Have Been Reviewed & Considered by Staff in Connection W/Enforcement Action EA-86-063 ML20237H4201987-08-18018 August 1987 Board Notification 87-012:forwards Ofc of Inspector & Auditor Rept 86-10,NUREG-1257,press Release & EDO 870814 Memo to Commission Re Region IV Insp Activities of Util QA Program.Portions May Be Relevant to Contention 5.W/o Encls ML20212Q6471987-04-21021 April 1987 Board Notification 87-009:advises That No Enforcement Action Will Be Taken Re Ofc of Investigations Rept 4-85-008 on Util Untimely Response to Intervenors Discovery Request,Per Board Notifications 85-067,85-076 & 86-020 ML20207D0061986-12-29029 December 1986 Board Notification 86-026:forwarding Partially Withheld Ofc of Investigations Investigation Rept 4-84-047 Re Alleged Falsification of Test Results at Facility ML20215B3181986-12-11011 December 1986 Board Notification 86-024:forwarding Partially Withheld Rept of Investigation Re Allegations of Misconduct by Region IV Mgt W/Respect to Plant.Rept Addresses Region IV Activities Per Util QA Program & Program Implementation ML20213F6871986-11-13013 November 1986 Board Notification 86-022:forwards Partially Withheld Ofc of Investigations 860307 Rept Re Assistance in Review of Investigation of Util Intimidation & Harassment Allegations (Case A4-86-003) ML20214X0691986-09-22022 September 1986 Board Notification 86-020:provides Followup to Board Notifications 85-067 & 85-076 Re Ofc of Investigations Rept 4-85-008 Concerning Facts Surrounding Util Untimely Response to Intervenors Discovery Request ML20199G0151986-04-0404 April 1986 Board Notification 86-014:forwards Synopsis of Ofc of Investigation Repts 4-84-039, Alleged Intimidation of QC Inspector & 4-84-050, Alleged Intimidation of Texas Util Generating Co Auditors by QC Mgt ML20153E5981986-02-24024 February 1986 Board Notification 86-005:forwards Order Extending Latest Const Completion Date to 880801.Evaluation & Author to Applicant Also Encl ML20137A9691986-01-13013 January 1986 Board Notification 86-001:list of Ofc of Investigation Repts Issued on Comanche Peak to Update Board Notifications 84-149 & 85-047.Boards Will Be Advised If Repts Relevant to Licensing Proceeding ML20136G1211985-12-27027 December 1985 Board Notification 85-093:forwards Transcripts of 851119 & 20 Meetings W/Case in Bethesda,Md Re Technical Review Team Ssers 7-11.Summary of Meetings Also Encl ML20151L2771985-10-30030 October 1985 Board Notification 85-089:suppls Board Notification 85-043 Re Cygna Ongoing Review of Facility Design Adequacy. N Williams to J Beck Forwarding Revs to Mechanical Sys & Cable Tray Supports Review Issues Encl ML20133B2601985-10-0303 October 1985 Board Notification 85-087:forwards Vs Noonan to Util & Rev 2 to Staff Evaluation of Comanche Peak Response Team Program Plan:Detailed Comments/Concerns, Per Commission 840706 Revised Notification Policy ML20137S4351985-09-30030 September 1985 Board Notification 85-084:notifies of ACRS Review of Ssers 7-11,during ACRS 305th Meeting on 850912-14.NRC Taking Appropriate Actions.Da Ward 850916 Memo Encl ML20137A0351985-08-20020 August 1985 Board Notification 85-077:discusses Staff Determination of Applicant Potential Matl False Statement of U-bolt Sample. Listed Memos Encl ML20134D2451985-08-16016 August 1985 Board Notification 85-076:updates Board Notification 85-067 Re Ofc of Investigation Efforts on Facts Surrounding Util Withholding of 1978 Mgt Analysis Co (Mac) Rept ML20128G6181985-07-0303 July 1985 Board Notification 85-068:informs of 850613-14 Meetings W/ Util to Discuss Program Plan.Program Activities Identified, Including Changes in Util Mgt within Nuclear Organization & Planned S&W Reevaluation of ASME Pipe Supports ML20132D1571985-06-28028 June 1985 Board Notification 85-066:summarizes 850521-23 Meetings W/Cygna Energy Svcs Re Preliminary Results for Portion of Phase 4 Independent Assessment Program Review ML20128D2151985-06-24024 June 1985 Board Notification 85-065:forwards Summary & Transcript of 850618 Meeting W/Util Re Reanalysis of rock-structure Interaction ML20127D7121985-05-0808 May 1985 Board Notification 85-053:forwards Summary & Transcript of 850422 Meeting Between NRC & Util Re Sampling Program for Torque on cinched-down U-bolts ML20204G8361984-11-0202 November 1984 Board Notification 84-175:summarizes 841023 Meeting W/Util to Discuss 841008 Plan for Resolution of Technical Review Team 840918 Requests for Addl Info Re Electrical, Instrumentation,Civil/Structural & Test Programs IA-87-778, Board Notification 84-024:forwards SECY-84-34 Re Emergency Diesel Generators Mfg by Transamerica Delaval,Inc.Staff Continuing Overall Assessment of Reliability of Diesel Engines1984-02-15015 February 1984 Board Notification 84-024:forwards SECY-84-34 Re Emergency Diesel Generators Mfg by Transamerica Delaval,Inc.Staff Continuing Overall Assessment of Reliability of Diesel Engines ML20244C8141984-02-15015 February 1984 Board Notification 84-024:forwards SECY-84-34 Re Emergency Diesel Generators Mfg by Transamerica Delaval,Inc.Staff Continuing Overall Assessment of Reliability of Diesel Engines ML20151H4871983-05-0404 May 1983 Board Notification 83-057:forwards Differing Prof Opinions Re Sys Interaction & Safety Classification.Info Relates to Board Notifications 83-17 & 83-44 Re Unresolved Safety Issue A-17 ML20204F0461983-04-12012 April 1983 Board Notification 83-42:forwards Info Re Unanalyzed Reactor Vessel Thermal Stress During Cooldown.B&W Informed NRC of Preliminary Safety Concern Evolving from Further Consideration of 800610 St Lucie Upper Head Voiding Event 1993-02-03
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20203J5931999-02-17017 February 1999 Notification of Significant Licensee Meeting with Util on 990329 Re NRC Plant Performance Review Summary Meeting ML20203A5081999-02-0505 February 1999 Notification of 980226 Meeting with Texas Utils Electric Co, Southern California Edison & NPPD Re Control of Hazard Barrier Tr, .Agenda Encl ML20195H9221998-11-17017 November 1998 Forwards Exam Repts 50-445/98-301 & 50-446/98-301 Conducted on 980619-26 with as Given Written Exams Encl,Designated for Distribution ML20153B0331998-09-18018 September 1998 Notification of 980929 Meeting with Texas Utilities Electric Co in Rockville,Md to Discuss Licensee Proposed App K Exemption Request & Topical Rept Submitted in Support of Exemption Request ML20236G8291998-07-0202 July 1998 Notification of 980720 Meeting W/Util in CPSES Nuclear Operations Support Facility Lab Annex to Discuss Midloop Operations During Last Refueling Outage ML20236F7611998-06-29029 June 1998 Notification of 980714 Meeting W/Util in Rockville,Md to Discuss Methods of ECCS Analyses & Licensing Submittals Required for Proposing Exemption to Appendix K & Power Uprate License Amend ML20217M9351998-04-0606 April 1998 Notification of Licensee Meeting W/Util on 980407 in Arlington,Tx Re Status of Licensee Actions in Response to GL 96-01 ML20202E6791997-12-0202 December 1997 Notification of 971209 Meeting W/Texas Utilities Electric Co in Rockville,Maryland to Discuss risk-informed Inservice Testing Request for Addl Info Responses, ML20202B1421997-11-26026 November 1997 Notification of 971115 Meeting W/Util in Arlington,Texas to Discuss Recent Unit 2 Refueling/Maint Outage at TU Electric Comanche Peak Plant ML20212G3921997-10-27027 October 1997 Notification of 971112 Meeting W/Util to Discuss Util 970228 Responses to Remaining Three Open Items Listed in NRC Safety Evaluation on Cable Functionality, .Reissued Due to Change of Cc:List ML20203C1181997-10-24024 October 1997 Discusses OI Rept 4-97-027 Re Falsification of Thermolag Matl Insp Records.Allegation Not Substantiated Therefore Enforcement Action Not Appropriate ML20212B7261997-10-16016 October 1997 Notification of 971031 Meeting W/Util in Arlington,Tx Re Predecisional Enforcement Conference ML20206E3401997-09-19019 September 1997 Requests That NRR Conduct Review of Licensee Backfit Claim to Determine of plant-specific Backfit Exists & Submits Recommended Actions to Be Taken If One Does Exists ML20217R1561997-08-28028 August 1997 Informs That GL 96-04 Did Not Require Response for Licensee That Did Not Have Boraflex in Sf Racks ML20237B9901997-07-0303 July 1997 Informs That on 970529-30,NRC Team Attended Severe Accident Mgt Implementation Demonstration at Comanche Peak Steam Electric Station,In Granbury,Tx ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134N2911996-11-22022 November 1996 Notification of 961205 Meeting W/Util in Arlington,Tx to Discuss Responses to Open Items Listed in NRCs Safety Evaluation on Cable Functionality at Plant, ML20134L9821996-11-19019 November 1996 Notification of Licensee Meeting W/Util on 961204 to Discuss Revision 25 to Emergency Plan ML20128P3011996-10-10010 October 1996 Forwards Analysis of Financial Qualifications & Antitrust Reviews & Input to SER on Proposal to NRC by Tuec for Tx Utilities Corp ML20129E9031996-10-0101 October 1996 Notification of 961002 Meeting W/Util in Rockville,Md Re License Amend Request 96-005,inverters & Battery Chargers Mod ML20135A2801996-04-10010 April 1996 Discusses Director'S Decision Re Actions Requested by Petitioners W/Regard to Use of Thermo-Lag by Reactor Licensees.Petitioners Requested Immediate Shutdown of Reactors Using Thermo-Lag ML20078H7831994-11-0707 November 1994 Forwards Rev 11 to CPSES ODCM & Receipt Acknowledgement Sheet ML20059K4921994-01-21021 January 1994 Notification of 940204 Meeting W/Util in Glen Rose,Tx to Discuss Unit 1 Outage Related Activities ML20059K5261994-01-21021 January 1994 Notification of 940203 Meeting W/Util in Arlington,Tx to Discuss Realignment of Nuclear Overview Functions ML20058C5451993-11-22022 November 1993 Notification of 931202 Enforcement Conference Re Reactor Coolant Spill Inside Containment on 931026 ML20058N1471993-10-0505 October 1993 Notification of 931006 Meeting W/Util in Rockville,Md to Discuss Implementation of Std TSs for Both Units ML20057C9801993-09-27027 September 1993 Discusses 930927 Press Conference Re J O'Connor Announcement That Util Settled Six Rate Matters & Appeals Before Illinois Courts & Commerce Commission by Agreeing to Refund Listed Amount to Customers Over Next 12 Months ML20057A8271993-09-13013 September 1993 Notification of 930920 Meeting W/Util in Rockville,Md to Discuss Fire Barrier Testing & Implementation on Unit 1 ML20056H2941993-09-0101 September 1993 Notification of 930916 Meeting W/Util in Comanche Peak Steam Electric Station to Discuss Safe Shutdown Risk & Other Issues Associated W/Scheduled Oct 1993 Refueling Outage ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20128H2931993-02-10010 February 1993 Staff Requirements Memo Re Emergency Motion to Stay Issuance of low-power Operating License.Staff Issued Order Denying Motion ML20128E4301993-02-0505 February 1993 Staff Requirements Memo Re 930129 Affirmation/Discussion & Vote on SECY-93-016 Discussing FRN Concerning Proposed Issuance of OL ML20062J1941993-02-0303 February 1993 Board Notification 93-001:notifies of 930202 Emergency Motion to Stay Issuance of low-power OL Requesting Listed Items Including Issue Order Staying Issuance of License ML20128F3531993-02-0202 February 1993 Discusses Emergency Motion to Stay Issuance of low-power Ol.Motion Requested That Commission Issue Order Staying Issuance of Low Power License & Grant Petitioners Chance to Review Withheld Documentation Re Settlement Agreements ML20128D5741993-01-27027 January 1993 Forwards Sworn Joint Affidavit of I Barnes & Ft Grubelich ML20127L9121993-01-26026 January 1993 Forwards NRC Staff Reply to Cfur Request for Publication of Proposed Action Re Licensing of Unit 2.Sworn & Executed Affidavits of I Barnes & Ft Grubelich Will Be Filed as Soon as Possible ML20127H4811993-01-18018 January 1993 Notification of 930121 Meeting W/Util in Rockville,Md to Discuss Fire Protection issues,Thermo-lag Installation Issues & Test Reports ML20127D6951993-01-13013 January 1993 Notification of Significant Licensee Meeting W/Util on on 930122 to Discuss Results of ORAT Insp ML20127C4861993-01-11011 January 1993 Notification of 920115 Public Mgt Meeting W/Util in Region IV Ofc to Discuss CPSES Temporary Mod Program ML20126H3491992-12-29029 December 1992 Notification of Significant Licensee Meeting W/Util on 930107 to Discuss Plant Monthly Status of Const & Licensing Activities ML20126K7681992-12-24024 December 1992 Forwards Part of Earlier Submittal by TU Electric for Distribution as Was Done for Previous Submittal Re ME215 Sapcas Computer Code.Proprietary Abstract Also Encl.Abstract Withheld ML20126F4161992-12-18018 December 1992 Notification of 930107 Meeting W/Util in Rockville,Md to Discuss Design & Operability of Alternate Min Recirculation Path in Highhead Pressure Safety Injection Sys ML20126D9061992-12-14014 December 1992 Notification of 921217 Meeting W/Util in Rockville,Md to Discuss Fire Protection Issues at Plant ML20057C9921992-10-26026 October 1992 Partially Withheld Memo Discussing Rape Allegation at Plant ML20127F5051992-10-21021 October 1992 Discusses 921020 Telcon W/R Feldman of Thermal Science,Inc (TSI) Re 921018 Rept Made by Util That Less than 10 of 2,000 Conduit Sections Provided by TSI Showed Signs of Delamination & Some Had Occluded Porosity in Cross Sections IR 05000445/19920181992-07-0606 July 1992 Discusses Allegation RIV-92-A-0016 Reviewed During Insp Repts 50-445/92-18 & 50-446/92-18 Re Disposal of Radioactive Matl in Landfill Located on Licensee Property ML20057B4601992-05-15015 May 1992 Discusses Telcon W/Rm Dow Re Plant ML20057B1881991-04-18018 April 1991 Discusses 910405 Telcon W/Alleger Re Security Sys at Plant 1999-08-27
[Table view] |
Text
._ . . _ _ - .
on n:g
(.
O
- p g NUCLkAR REGULATORY COMMISSION WASHINGTON. D. C. 20555
\*****/ 2 g DEC W Docket Nos.: 50-445 and 50-446 MEMORANDUM FOR: The Atomic Safety and licensing Board for Comanche Peak (P. B. Bloch, W. P. Jordan, K. A. McCollom, E. B. Johnson)
FROM: Vincent S. Noonan, Director Project Directorate No. 5 Division of PWR I.icensing-A
SUBJECT:
COMANCHE PEAK OI REPORT: AU.EGED FAI.SIFICATION OF TEST RESULTS (80ARD NOTIFICATION NO. 86-26 )
The Office of Investigations has completed its review of Case Number 4-84-047 regarding alleged falsification of test results.
During September 1984, a former start-up engineer, WITNESS F, previously employed in an electrical test group at the Comanche Peak Steam Electric Station, appeared as an intervenor witness before the Atomic Safety and I.icensing Board. During subsequent in camera ASl8 hearings, the utility called witnesses and introduced evidence lefore the ASI.B which indicated that in 1982, WITNESS F deceived a quality assurance technician during a preoperational test on a safety system which resulted in the falsification of the preoperational test report. The ASI.8 requested that the Nuclear Regulatory Commission's Office of Investigations be notified of this incident.
The results for this investigation did not established that the former start-up engineer deceived a quality assurance technician nor did it establish that a preoperational test was falsified.
Because the I.icensing Board held hearings regarding these matters and because there are inconsistencies between a witnesses' testimony at the hearings and a statement taken by the NRC investigator during this investigation, this report is being provided to the licensing Board.
- j
// / / /
gWe . oo a ; -i.(edur PWR Proj ct Di ctorate No. 5 Divisio of PWR I.icensing-A
Enclosure:
Report of Investigation (Case No. 4-84-047) cc: See next page (861230030h Naas 1/