) One First Natanal Pl+2a. CNeago, luinois
/( G Commonwealth Edison x
D Address Aeply to: Post OIfie 55T151 Chicag'A lit;nois 6C;90
^
> November 1, 1988 l
l l
Mr. '~omas E. Murley, Director Offl of Nuclear Reactor Regulation U.S. aclear Regulatory CommAJsion Wash - ;on, DC 20'iS 5
Subject:
Quad Cities Station Units 1 and Dresden Station Units 2 and 3 Detailed Control Room Design Review (DCRDR) Modifications and Enhantements NEC DockeLBas.,_jiQ-214/ 265 and 30-237/241 Referencos (a): Letter from J.A. Silady te T.E. Murley dated October 13, 1988 concerning same subject
Dear Mr. Murley:
The re'erenced lett r proposed a meeting with your staff to discuss the ststus of modifications and enhancements at Dresden and Quad Cities which implement recommendations from the respective Detailed Control Room Design TAvlews (DCRDR).
After discussious with the NRR Project Managers, the meeting has been scheduled for November 16, 1988, in Chicago. A draft agenda has been provided to Mr. B L. Siegel. The meeting will include a program overview, a summary of completed and on-schedule HED corrections, and more detailed discussions of items for which the previously proposed schedules have not been maintained or which are now projected to be unachievable on th's original schedules.
The discussion of these past due or coming due items for which relief is requested will include reasons for the deferrals and the basis for concluding that there is no significant impact on safe or efficient operation as a result of delayed implementation.
In addition to the items indicated on the draft agenda, we will also address our plans to improve commitment tracking and project management for this and other complex projects involving large numbera of individual actions with multiple department interfaces. DCRDR, for example, involves from 300 to 500 items per unit with three corporate departments, several station departments, and several consultants and contractors.
f 00 831109(316 881101 10 PDR ALOCK 05000237 P PDC
T.F. Murley November 1, 1988 The meeting time and locations will be b , ivided to the Project Managers and Region III as socn as arrangements are finalised.
5 Plance contact this office should further information be required. J Very truly yours, 9
f ekn-J. A. Silady r -
Nuclear Licensing Administrator (
1m f
f i
. cc A.B. Davis - Regional Administrator, RIII i i
T M. Ross - Project Manager, NRR 3
B.L. Siegel - Project Manager, HRR [
S.O. Dupont - Resident Inspector, Dresden k R.L. Higgins - Resident Inspector, Quad Cities i
i I
i i
4 h
L r
l i
i j .
I ll l
- i 5265K !
1.
I l
I f
J
- __. -- --- . - - -__ - - _ . . . - _ . . .