Comments on Proposed NRC Safety Goal Evaluation Steering Group Rept.Safety Goal Policy Statement May Not Give Sufficient Emphasis to defense-in-depth & May Place Too Much Emphasis on benefit-cost Analyses
ML20197K082
Person / Time
Issue date: 07/17/1985
From: Ward D
Advisory Committee on Reactor Safeguards
To: Palladino N
NRC COMMISSION (OCM)
References
ACRS-R-1141, NUDOCS 8508010720
Download: ML20197K082 (8)


Text

_. -

dd/W-/4/

/ . ..%

UNITED STATES 8' g ~%j NUCLEAR REGULATORY COMMISSION

$ 3 r ADVISORY COMMITTEE ON REACTOR SAFEGUARDS 4 WASHINGTON, D. C. 20555 July 17,1985 Honorable Nunzio J. Palladino Chairman U. S. Nuclear Regulatory Comission Washington, D. C. 20555

Dear Dr. Palladino:

SUBJECT:

ACRS COMMENTS ON PROPOSED NRC SAFETY GOAL EVALUATION REPORT During its 303rd meeting, July 11-13, 1985 and its 302nd meeting, June 6-8, 1985, the Advisory Committee on Reactor Safeguards met with repre-sentatives Steering Group of thereport NRCdated StaffApril and 1985 reviewed (Reference the NRC1.Safety ) Goal During our Evaluatio review, we had the benefit of three meetings of the ACRS Subcommittee on Safety Philosophy, Technology, and Criteria held on December 12, 1984, May 8,1985, and July 10, 1985. We also had the benefit of the docu-ments referenced.

The Executive Direc.'.or for Operations has not completed his fomulation of recommendations to the Comission. However, recomendations have been provided by the Steering Group, by Mr. Harold Denton, Director, Office of Nuclear Reactor Regulation, by Mr. Robert Minogue, Director, Office of Nuclear Regulatory Research, and by other senior NRC Staff members. Some of these recomendations suggest significant changes in the proposed 1983 Safety Goal Policy Statement.

Our comments at this time are based primarily on our review of the Steering Group report. We expect to make further coments after the Executive Director for Operations has formulated his recommendations to the Commission.

l We conclude that the NRC is not ready to reaffirm and implement the 1983 Safety Goal Policy Statement in its original or even some slightly modified form. Much progress has been made and the effort should continue. However, the fonn of the design objectives and the plan for implementation are not yet well enough developed. We believe that greater attention should be placed on working toward an objective of a mean-core-melt frequency of 10-4 per reactor year and use of a contain-ment performance objective. We are concerned that the Safety Goal Policy Statement may not give sufficient emphasis to defense-in-depth and may place too much emphasis on benefit-cost analyses.

l Areas of Agreement We agree with many of the findings and conclusions of the NRC Staff Safety Goal Steering Group, . including the following:

gwen aw """ "' 2 w: ~

j f~%]

%g pug. (O%foIO tli /L- 79 Il%:S 0 XA

-ame-  %(O)n*F'

- .._ =- - - - -

Honcrable Nunzio J. Palladino July 17, 1935 i . PRA methods and resulting insights have proven to be very valuable in establishing priorities for regulatory activities, the develop-ment of regulatory positions on generic safety issues, and the assessment of plant-specific safety issues.

l

. . PRA has limitations that must be understood when the results are used. The results of a PRA should normally be used in conjunction with traditional safety review methods in making regulatory da-cisions.

. The statement of the Qualitative Safety Goals in the 1983 Safety j Goal Policy Statement is satisfactory.

. For sites where na people reside within a mile of the site bound-

ary, for purposes of calculation of early fatalities, an individual should ordinarily be assumed to reside one mile from the site boundary.

. In applying the latent cancer fatality numerical guideline, we agree with the Steering Group that ~it is better to consider the population within 10 miles of the site, rather than 50 miles as 4 proposed in the 1983 Policy Statement. This goal is not a :ocietal

, risk goal but an individual risk goal _because it is not related to the number of persons affected. Consideration should be given to the use of a one-mile distance, as suggested by Mr. Denton.

, . We support the general principle that no more than about 10 percent -

! of any quantitative design objective should be accounted for by a l single major issue or accident.

Implementation Procedures, Particularly Core Melt Objective

The Steering Group has proposed a number of ' detailed implementation procedures. The Connittee has a range of questions on the proposed operating limits, and wishes to discuss these matters in detail with the l~ - NRC Staff. The implementation procedures should not .be adopted in

[ their current form.

l In its letter to you dated September 15,1982 (Reference 2), the ACRS

j. stated that mean, not median, vagues should be used and that an opera-tional level for core melt of 10- per reactor-year is too large for all i but a few, small existing nuclear plants. Even a mean value of core melt of 10-3 per, reactor-year is too large. As part of defense-in-depth, action to reduce such a core-melt-frequency should be part of the Connission's policy, not subject to the current benefit-cost backfit requirements as specified in the proposed Backfit Rule and implementing Manual Chapter.

We believe that the Commiss on should state that a mean-core-melt frequency of not more than 10 p' per reactor year is an NRC objective. for

  • all but a few, small, existing nuclear plants, and that, keeping in mind l

Honorable Nunzio J. Palladino July 17,1985 i

the considerable uncertainties, prudence and judgment will tend to take priority over benefit-cost analysis in working toward this goal.

Containment Perfonnance Objective The NRC Staff has not developed a containment perf mar.cs g'Jideline, nor l

has any serious NRC Staff effort to do so' been apparent to the Commit-tee. The ACRS continues to believe, as it did in its report of oune 9, 1982 (Reference 3) that the development of a containment perfonnance

guideline warrants high priority, and recomends that the Connission i require early NRC Staff attention to this matter as part of maintaining its defense-in-depth principle. Approximate compliance to an appro-priate criterion should be an NRC objective.

, Use of Median Values The Steering Group proposes to use median values for assessing compli-ance with the quantitative guidalines "so as to provide stability to

, estimates even if the uncertainties are much larger in one case than

another." We disagree with the use of median values for purposes of i input into decision making. If it is available, we believe that knowl-I edge of the uncertainty range and the frequency distribution of conse-I quences (whether they be core melt or individual risk) is important to

! have for decision making. However, we believe that when a single value is used for comparison against a numerical guideline, it should be the mean, not the median value of the parameter involved. The mean should be evaluated in as appropriate a manner as the available information permits.

t i

While addition of the mean values for each of a set-of sequences does provide the mean value of the combined sequences, the addition of the medians does not provide the median value for the combined set nor, for that matter, does it provide any clearly defined property of the com-bination.-

l l If the pattern and extent of uncertainties are so ill-defined as to make any assignment of mean-core-melt frequency or risk not meaningful, the median likewise will lack sufficient meaning to have an important input into decision making.

I L Additional connents by ACRS Members Harold W. Lewis, Forrest J. Remick, l Max W. Carbon, and Glenn A. Reed are presented below.

Sincerely, W O d

David A. War N, l f

)

Chairman

'E_.-_..______m___m._._

. m -e* ,- - - . , -% a --o- m - -www-,,.-- , , m.w.- m -,py,.m.- .,r. w-,yye2,7 +yy -4.,.,,g,m.+9m gy+ -wy,9,, ,,,wgg.pi

\

Honorable Nunzio J. Palladino July 17, 1985 Additional Coments by ACRS Member Harold W. Lewis I disagree very strongly with the overall thrust of the Comittee's letter on the Safety Goal Policy Statement, even though I agree com-pletely with the recommendation that the Comission not affirm the 1983 Statement. My reasons are so different from those of the Comittee that <

they point toward different directions for future development, and therefore warrant separate expression. Some reasons have been expressed before [see additional comments to ACRS letter dated June 9, 1982 incorporated herein by reference (Reference 3)J. '

To avoid wallowing in the details and thereby losing the point, it may be useful to first say what I think the Comission should do. The rest will fall into context.

I believe the Comission should issue a declarative and arbitrary quantitative safety goal statement at this time, stating it as an objective, acknowledging its arbitrariness, inviting discussion of the exact numbers, and acknowledging that tradeoffs between containment and prevention will sometimes be necessary to meet the objectives. It should nonetheless -- this is not contradictory -- commit itself to maintaining the principle of defense-in-depth. The risk used should be societal -- that is NRC's responsibility. It should recognize uncer-tainty, and accept the responsibility for decision making in the face of uncertainty -- there are no pat formulas.

The Comission should further comit itself to cost-benefit analysis --

not to assure an ac' equate level of safety, but to assess the value of improvements to safety. Cost-benefit analysis is not now done very well by the NRC Staff, but the proper response to that is to improve crafts-manship, not reject the too7 (This is also important for the back-fitting issue.) There will indeed be great uncertainties in both cost-ber.efit analyses and in the assessment of where a particular reactor stands with respect to the quantitative goals. These uncer-tainties are not created by the analysis -- they are revealed by it.

The Commission should acknowledge this.

With that preamble, detailed coments on the Comittee letter follow:

The Committee is concerned that "too much emphasis [may be placed] on benefit-cost analyses." That will surely be read by some to mean that the Comittee rejects cost-benefit analysis as a tool in the management of nuclear safety. If it does mean that, it is a grievous error. If it does not, it is inappropriate wording. It is particularly disturbing in view of the Commission's efforts to rationalize the regulatory process.

The Committee agrees with the statement of the Qualitative Goals in the 1983 Comission Statement. For my disagreement, see the reference cited

, above.

Honorable Nunzio J. Palladino July 17,1985 The Comittee has a series of detailed coments about averaging radii, which serve to further obfuscate the societal / individual risk issue. It further states, incorrectly in my view, that the latent cancer fatality goal is an individual goal. It is, in fact, an obscure mixture of the 1 two -- neither fish nor fowl. I support societal goals, and would  !

rather deal with individuals as individuals. I even believe that is NRC's charter.

The Comittee takes no position on the on-site /off-site question. I believe that on-site costs of an accident are not the responsibility of NRC, which is charged with the protection of the health and safety of the public. The exception is that of on-site radiation exposure of people, which is its responsibility.

The Comittee coments about median versus mean are, if anything, understated. It is a disgrace that NRC Staff should continue to recom-mend criteria based on medians of core-melt probabilities. This is not a matter of taste -- it is simply wrong to add median probabilities. I find it extremely disturbing that, despite the number of times this has been brought up, your Staff continues to fall short of even elementary textbook-level awareness of this. If this is harsh, so be it.

The Comittee states that a core-melt probability of 10-3 per reactor-year is too large, independent of containment considerations. I do not believe the core-melt probability should be so arbitrarily separated from the other issues. It may be convenient for regulatory purposes, but it is not appropriate public policy.

I would also have made some coments about the importance of pressing the Staff to make realistic calculations for safety goal compliance.

The regulatory habit of erring on the conservative side is inappropriate

here, and people seem to have trouble shedding their regulatory customs.

In sumary, I recomend that the Commission continue the tedious process of learning how to deal with quantitative risk analysis, and with decision making in the face of uncertainty. The time is not yet ripe for the promulgation of quantitative safety goals other than on an arbitrary basis, as recomended above. Progress is "how safe is safe enough" question. Let it continue., being made on the Additional Coments by ACRS Member Forrest J. Remick I disagree very strongly with much of the Committee's letter on the Safety Goal Policy Statement. I see a number of the Comittee's com-ments as restatements of prior views which indirectly attack the Com-mission's promulgation of a safety goal policy statement, in contrast to a thorough evaluation of the Safety Goal Evaluation Report prepared by the Safety Goal Evaluation Steering Group at the end of a two-year evaluation period.

1 -

l l

Hoiorable Nunzio J. Palladino July 17, 1985

! I think that, based on the two-year evaluation and the generally excel-

~

lent Steering Group report, the Comission is ready to utilize its Safety Goal Policy Statement to augment its traditional safety review methods in making regulatory decisions. Like the Steering Group, I think such use will help add objectivity and predictability to the )

4 regulatory process and can be used as a regulatory yardstick against which a wide range of regulatory issues can be measured.

I do take exception to the Steering Group's proposed change to the l benefit-cost guideline from that defined in NUREG-0880, Revision 1. The basis for my exception is as follows:

The Comission's responsibility under the -Atomic Energy Act is to promote comon defense and security and to protect the health and safety of the public. The extent to which the health and safety of the public is to be protected is neither specified in the Act nor in the Com-mission's regulations.

l The Comission's Policy Statement on Safety Goals for the Operation of

] Nuclear Power Plants expresses the Comission's view on the acceptable

level of risk to public health and safety and on the safety-cost trade-offs in regulatory decision making. Therefore, the Comission has

, defined for the first time how safe is safe enough with respect to protecting the health and safety of the public from the risks of the operation of nuclear power plants. '

The Atomic Energy Act does not indicate that the Comission has the responsibility to protect licensees from the risk of potential economic i

loss of investment resulting from the operation of their nuclear power i plants. Therefore, the Comission's Policy Statement on Safety Goals

does not define acceptable levels of risk of such losses.

The Comission adopted a benefit-cost guideline in its Policy Statement to encourage the efficient allocation of resources in safety-cost tradeoff decisions related to Comission-imposed plant modifications.

i Consistent with the Atomic Energy Act, the benefit in the benefit-cost guideline is defined as a reduction in public risk (in tenns of a reduction in the collective population exposure measured in person-rems).- Averted economic risks to the licensee which hypothetically might result from a Commission-imposed modification, rightfully are not defined as a benefit in the benefit-cost guideline. Therefore, a Comission-imposed modification could not be justified on.the basis that it might reduce economic risk to the licensee.

l Earlier the Comission solicited and received public _ coments on this-i point. Most commenters were opposed to the proposed change in the benefit-cost guideline. The following partial quote from the coment by Duke Power Company sumarizes the views of _ the -twenty-four commenters opposed: "The benefit side of the benefit-cost analysis should repre-sent a measure of the - potential reduction in risk only in terms of public health and safety. The NRC is not charged with, and should not

Honorable Nunzio J. Palladino July 17, 1985 concern itself with, protecting the financial investment of a utility and its shareholders in a nuclear plant ...." (p. 74, NUREG-0880, Rev.

1).

Some proponents of including hypothetically averted economic costs to licensees as a benefit in the benefit-cost guideline are concerned that unless this is permitted, certain proposed plant modifications or backfits might not prove cost beneficial. That is, the cost of the

, modification would preclude its imposition because the modification

would not substantially reduce risk to the health and safety of the public.

Ti:e continued efforts to impose modifications regardless of their cost compared to their public health and safety benefit have contributed greatly to the loss of control of the regulatory process._ Further, they have contributed to making nuclear plants more complex and perhaps less safe than would be the case otherwise.

For these reasons, I strongly disagree with the proposed change in the benefit-cost guideline. Hypothetically averted economic risks to licensees are not justifiable bcnefits from the standpoint of protecting public health and safety. Therefore, they-should not be included as a benefit under the benefit-cost guideline of the Comission's Policy Statement on Safety Goals for the Operation of Nuclear Power Plants.

i

! Additional Comments by ACRS Member Max W. Carbon

! I share Forrest Remick's disagreement with the Steering Group's proposed change to- the benefit-cost guideline from that defined in NUREG-0880, Revision 1.

[ Additional Coments by ACRS Member Glenn A. Reed

I agree with most of the ACRS letter and particularly I agree with a safety gal for core-melt frequency of 10-4 Also, I agree with the additional comments of Forrest Remick. It is my considered opinion that the adoption of the core-melt frequency approach, rather than any use of 1

averted on-site benefit-cost analysis, is more likely to lead to safety

improvements since averted costs will involve many more uncertainties,
delay and confusion.

References:

1. NRC Safety Goal Evaluation Steering Group report dated April 1985,

" Safety Goal Evaluation Report " transmitted by memorandum from Thomas E. Murley, Chairman, Safety Goal Steering Group, to Raymond F. Fraley, Executive Director, ACRS, dated April- 18, 1985

2. ~ Letter from P. Shewmon, ACRS Chairman, to Nunzio J. Palladino, NRC Chairman,

Subject:

ACRS Report on the Draft Action Plan for Imple-menting the Consnission's Safety Goals for Nuclear Power Plants, dated September 15, 1982 l

- ~ _. _ _ _ - . . . _ . . - . , . - - ..-,,,_-.-,_-,..-_._-__,-.m,_,-- . . , - - , _ _ .

Honorable Nunzio J. Palladino July 17, 1985

3. Letter from P. Shewmon, ACRS Chairman, to Nunzio J. Palladino, NRC Chairman,

Subject:

Comments on Proposed Policy Statement on Safety Goals for Nuclear Power Plants (NUREG-0880, A Discussion Paper),

dated June 9, 1982

4. U. S. Nuclear Regulatory Commission, " Safety Goals for Nuclear Power Plant Operation," USNRC Report NUREG-0880, Revision 1, dated May 1983
5. Memorandum from Malcom L. Ernst, Deputy Director, Office of Nuclear Regulatory Research, to Thomas E. Murley, Regional Administrator, Region I,

Subject:

Emphasis on Defense-in-Depth and Accident Pre-vention in Safety Goals, dated May 10, 1985

6. Memorandum from Robert B. Minogue, Director, Office of Nuclear Regulatory Research, to William J. Dircks, Executive Director for Operations,

Subject:

Safety Goal Evaluation Report, dated May 21, 1985

7. Memorandum from Harold Denton, Director, Office of Nuclear Reactor Regulation, to William J. Dircks, Executive Director for Operations, S.ubject: Safety Goal Evaluation Report, dated June 12, 1985 G

.- . , . - - . . , . - -.