ML20199C009

From kanterella
Revision as of 01:52, 20 November 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Vols I & Ii,Revs 1 & 0 to Millstone Unit 2 ICAVP, Final Rept,Respectively.App 11.1 (Discrepancy Repts - Books 1 Through 8) Also Encl
ML20199C009
Person / Time
Site: Millstone 
Issue date: 01/12/1999
From: Curry D
External (Affiliation Not Assigned)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20199C015 List:
References
NUM2-PPNR-2248, NUDOCS 9901140184
Download: ML20199C009 (1)


Text

- _ - _ _ _ - - - _ - _ _ _ _ - - _ - _ _ - -

PARSONS

['Y Daniel L Curry, vice President. Nuclear servees t /' Parsons Energy & Chernicals Group loc.

V 2675 Morgantown Road

  • Reading, Pennsylvanta 19607 * (610) 855-2a66 = Fax- (610) 855-2602 January 12,1999 Docket No. 50-336 Parsons NUM2-PPNR-2248-L U.S. Nuclear Regulatonf Commission Attention: Document Control Center Washington, D.C. 20555 Millstone Nuclear Power Station Unit No. 2 Independent Corrective Action Verification Procram (ICAVP)

Gentlemen:

This letter transmits 3 copies of the Millstone Unit 2 Independent Corrective Action Verification Program Final Report - Volume 1, Revision 1; Volume 11, Revision 0 and Appendix i 1.1 (Discrepancy Reports - Books I through 8). The additional two of these copies are provided for I

fm distribution to the local public document rooms.

4

'Q' If you have any questions concerning the information provided, please contact me at (610) 855-2366.

1 Sincerely,

/

a 40 f

Daniel L. Curry Parsons ICAVP Project Director DLC:djv Attachments cc: E. Imbro (2)- USNRC R. Laudenat - NNECo J. Fougere - NNECo Rep. Terry Concannon - NEAC 0 0!

.i #. hf$ >#f

/N 9901140184 990112 0

['-)" PDR ADOCK 05000336 p PDR __

_ ,