January 27, 1998
EA 97 606
Mr. Oliver D. Kingsley
President, Nuclear Generation Group
Commonwealth Edison Company
ATTN: Regulatory Sen As
Executive Towers West lil
1400 Opus Place, Suite 500
Downers Grove, IL 60515
SUBJECT: NRC INSPECTION REPORT 50 295/97023; 50-304/97023 AND
NOTICE OF VIOLATION
Dear Mr. Kingsley:
This refers to the inspection conducted on September 8 through December 16,1997, at the
Zion Units 1 and 2 reactor facilities. The enclosed report presents the results of this i~ 'ction.
The inspection involved examination of engineering activillas primarily related to the Unit 2
restart with a focus on reviewing corrective actions taken to address engineering issues
identified during the Engineering and Technical Support (E&TS) inspection in 1996. The
inspectors evaluated the effectiveness of your engineering and support groups in identifying,
assessing and resolving technicalissues. The inspectors also evaluated the effectiveness of
your self assessment and corrective action processes.
The NRC noted that engineering related improvements have occurred (mainly in the design
enginecring organization) since the E&TS lnspection conducted in 1996. Various engineering .
_
related improvement programs such as the design basis initiative, operating experience and the
engineering assurance group have been initiated; however, it was too early to assess the long
term effectiveness of these programs. Furthermore, the violations identified by the NRC and
discussed in this report, represent continuing chelhnges that remain to be addressed.
Based on the results of this inspection, the NRC has determined that five violations of NRC
requirements occurred. These vlotations are cited in the enclosed Notice of Violation (Notice)
and the circumstances surrounding them are described in detallin the s
The subject violations irivolve failure to adhere to scaffoldirg procedure requirements;
ineffective corrective actions, relating to out of tolerance and oil samples; failure to ensure that
[
proficiency and qualifications were adequately achieved and maintained for Raychem splice
applications; failure to report identified discrepancies in the emergency core cooling system
small break loss of coolant accident analysis; and a failure to report a condition outside the
design basis in a timely manner.
Nn013
ggg20;ggg;;gagg
,
I,l ,l!. !.!!,[ !!( !!h ,!
,
>
)[[f
_ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ - _ _
.
3
2
O. Kingsley 2
,lanuary 27, 1998
Please note that you are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response. The NRC will use your
response, in part, to determine whether further enforcement action is necessary to ensure
compliance with regulatory requirements.
In addition, three apparent violations were identified and are being considered for escalated
enforecment action in accordance with the " General Statement of Policy and Procedure for
NRC Enforcement Actions"(Enforcement Policy), NUREG 1600. The apparent violations
involve cross tying 125 Vdc buses from Unit 1 to Unit 2 with the battery and charger
disconnected from the bus and the associated buses not being declared inoperable. This
situation continued to occur ofter your staff Identified in September 1996 that the cross tying
resulted in the plant being outside its design basis. Upon completion of this evaluation you
failed to ensure that the design bases were correctly translated into appropriate procedures.
Additionally, you failed to adhere to the requirements of T.S. 3.15.2.E when one 125 Vdc
battery and/or distribution system for a unit was not operable. Although the NRC began
questioning the practice in March 1997, cross-tying was not discontinued until August 1997.
, While both units were shutdown during this period, your engineering staff did not complete its
evaluation to determine the acceptability of cross tying under shutdown conditions until
September 1997,
1 l No Notice of Violation is presently being issued for these three apparent violations. However,
we request that you respond within 30 days of the date of this letter to the apparent violations
discussed in the enclosed inspection report. Your response should be clearly marked as a
* Response to Apparent Violations in Inspection Report Nos. 50-295/97023; 50-304/97023 and
l should include for each apparent violation: (1) the reason for the apparent violation, or, if ! contested, the basis for disputing the apparent violation, (2) the corrective steps that have been
taken and the results achieved, (3) the corrective step = that will be taken to avoid further
violations, and (4) the date when full compliance will be achieved. Your response should be
submitted under oath os affirmation and may reference or include previous docketed
correspondence, if the correspondence adequately addresses the required response.
We Intend to review your response to the apparent violations described in the enclosed
inspection report. Based on the results of this raview, we will determine whether a
pre-decisional enforcement conference is necessary to enable the NRC to make an
enforcement decision. You also have the right to request a conference if you deem it
necessary. Please be advised that the number and characterization of apparent violations
described in the enclosed inspection report may change as a result of further NRC review. You
will be advised by separate correspondence of the results of our deliberations on this matter.
.
,
O. Kingsley 3 January 27, 1998
in accordance with 10 CFR 2.700 of the NRC's " Rules of Practice," a copy of this letter, its
<
enclosures, and your response will be placed in the NRC Public Document Room (PDR).
Sincerely,
original signed by C. E. Grant
Geoffrey E. Grant, Director
Division of Reactor Projects
Docket Nos: 50-295; 50 304
License Nos: DPR 39; DPR-48
Enclosures: 1. Notice of Violation
2. Inspection Report
Nos, 50-295/97023; 50 304/97023
cc w/encls: M. Wallace, Senior Vice President,
Corporate Services
H. G. Stanley, Vice President,
PWR Operations
J. Perry, Vice President
BWR Operations
Liaison Officer, NOC-BOD
D. A. Sager, Vice President,
Generation Support
D. Farrar, Nuclear Regulatory
Services Manager
1. Johnson, Licensing Operations Manager
Document Control Desk - Licensing
R. Starkey, Plant General Manager
R. Godley, Regulatory Assurance
Supervisor
Richard Hubbard
Nathan Schloss, Economist,
Office of the Attorney General
Mayor, City of Zion
State Liaison Officer
State Liaison Officer, Wisconsin
Chairme.n, Illinois Commerce Commission
See Attached Distribution
DOCUMENT NAME: G:DRS\ZIO97023.DRS (See Previous Concurrence)
1. ,.c.~. . ..,y .e in co oow.i. i. is. .., c . ceny -isoui .,i.com.~i,.ac,n.o,. v . cccy in .,,,cs, v.acin.o,. v . we cory
OFFICE Rlll/DRS Rill /DRS Rlll/DRP Rlil/ENF Rill /DRS Rlli/DRP
NAME Guzman Lougheed Hills Clayton Grobe Gran
Falevits:sd Vegel Ak
DATE 01/ /98 ~'
01/ /98 01/ /98 01/ /98 01/ /98 01tTftW
OFFICIAL RECORD COPY
. - - -. - - _ .. - -. - - . - - - - -
.
'.
J. Brons 3
.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosures, and your response will be placed in the NRC Public Document Room (PDR),
Sincerely,
Geoffrey E. Grant, Director
Division of Reactor Projects
Docket Nos: 50 295;50 304
License Nos: DPR 39; DPR-48
Enclosures: 1. Notice of Violation
2. Inspection Report
Nos. 50 295/97023; 50 304/07023
"
cc w/encis: O. Kingsley, Nuclear Generation Group
President & Chief Nuclear Officer
M. Wallace, Senior Vice President;
Corporate Services
H. G. Stanley, Vice President,
PWR Operations
Liaison Officcc. NOC-BOD
D. A. Sager, Vice President,
Generation Support
D. Farrar, Nuclear Regulatory
Services Manager
1. Johnson, Licensing Operations Manager
Document Control Desk - Licensing
R. Starkey, Plant General Manager
R. Godity, Regulatory Assurance
Supervisor
Richard Hubbard
Nathan Schloss, Economist,
Office of the Attorney General
Mayor, City of Zion
State Liaison Officer
State Liaison Officer, Wisconsin
Chairman, Illinois Commerce Commission
Distribution
Docket File w/encls Ril; PRR w/encls Rill Enf. Coordinator w/encls
PUBLIC IE-01 w/ enc!s SRI, Zion w/encls TSS w/encls
LPM, NRR w/encls J. L. Caldwe'l, Rlli w/encls R. A. Capra, NRR w/enets
DRP w/encls A. B. Beach, Rlli w/ene!s DOCDESK w/encls
DRS w/encls G. E. Grant, Rlli w/encls CAA1 w/encls
DOCUMENT NAME: G:DRS\ZIO97023.DRS. 4<su mvous coecumeco v. .~..e m enein e.e m i.,se. mie w ca. c e m . w w . r . e m .+ .n. w ., e . ir . wo m
OFFICE Rill /DRS l Rlll/DRS Rill /DRP Rlll/ENF Rlll/DRS,l Pill /DRP
NAME Guzman g Loughded Hills * Clayton Gro Grant
Falevits:sd
4 Vegel4
DATE 01/ /98 01/ /98 01/ /08 01/ /98 01/lP98 01/ /98
OFFICIAL RECORD COPY
_
_ _ - _ . _ _ _ _ _ _ - _ - _ - - _
,
'.
'
J. Brons 3
.
In accordance with 10 CFR 2.700 of the NRC's " Rules of Practice," a copy of this letter,its ;
enclosures, and your response will be placed in the NRC Public Document Room (PDR).
Sincerely,
Geoffrey E. Grant, Director
Division of Reactor Projects
Docket Nos: 50 295;50-304
License Nos: DPR 39; DPR-48
Enclosures: 1. Notice of Violatloc
2. Inspection Report
Nos. 50-295/97023; 50-304/97023
cc w/encts: O. Kingsley, Nuclear Generation Group
President & Chief Nuclear Officer
M. Wallace, Senior Vice President,
Corporate Services
H. G. Stanley, Vice President,
l PWR Operations !
Liaison Officer, NOC-BOD
l D. A. Sager, Vice President,
Generation Support
l l D. Farrar Nuclear Regulatory
Services Manager
, '
I. Johnson, Licensing Operationa Msnager
Document Control Desk - Licensing
R. Starkey, Plant General Mana0er
R. Godley, Regulatory Assurance
Supervisor
Richard Hubbard
Nathan Schloss, Economist,
Office of the Attomey General
Mayor, City of Zion
State Liaison Officer
State Liaison Officer, Wisconsin
Chairman, Illinois Commerce Commission
Distribution
Docket File w/encls Rlli PRR w/encls Rlli Enf. Coordinator w/encls
PUBLIC IE-01 w/encls SRI, Zion w/encls TSS w/encls
LPM, NRR w/encls J. L. Caldwell, Rlll w/encls R. A. Capra, NRR w/encls
DRP w/encls A. B. Beach, Rlll w/encls DOCDESK w/encls
DRS w/encls G E. Grant, Rlli w/encls CAA1 w/encls
DOCUMENT NAME: G:DRS\ZIO97023.DRS
tomo...m wmi.*e-au,*. mm..m c em e . e t % . e.e w ..= ~ ~ . >c.wem
OFFICE Rlll/DRS lc Rlll/DRS b/ Rlll/DRP E Rlll/DRP 6 Rill /DRP Rlll/DRg
~$AME L9vgheed Hills Vogel Grant Grobe
Guzmanf[
Falevite:sd @ *e gM
DATE 01/1/98 01/2/98 01/5/98 01/fl98 01/ /98 01/ /98
OFFICIAL RECORD COPY
.
. . . . . - . - - . . . . . - - - . - . _ . . ~ . - . - . - . . - - _ - . - - - - .
,
. r
-
- O. Kingsley 4 January 27, 1998
. 4
Distribution
Docket File w/encls Rlli PRR w/encls Rill Enf. Coordinator w/encls
PUBLIC IE-01 w/encls SRI, Zion w/ enc ls TSS w/encls
LPM, NRR w/encls J L. Caldwell, Rlli w/encls R. A. Capra, NRR w/encls
, DRP w/encls A; B. Beach, Rlli w/encls DOCDESK w/encls ~
DRS w/encls G. E. Grant, Rlli w/encls CAA1 w/encls J.
Lieberman, OE J. Goldberg, OGC R. Zimmerman, NRR
i '
i
Y i 4 5 5. 1- .- +
}}