Forwards Insp Repts 50-295/97-23 & 50-304/97-23 on 970908-1216 & Nov.Violation Involved Failure to Adhere to Scaffolding Procedure Requirements & Failure to Ensure That Proficiency & Qualifications Were Adequately Achieved
ML20199G194
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 01/27/1998
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML20199G198 List:
References
50-295-97-23, 50-304-97-23, EA-97-606, NUDOCS 9802040237
Download: ML20199G194 (6)


See also: IR 05000295/1997023

Text

{{#Wiki_filter:. o

                                              January 27, 1998
   EA 97 606
   Mr. Oliver D. Kingsley
   President, Nuclear Generation Group
   Commonwealth Edison Company
   ATTN: Regulatory Sen As
   Executive Towers West lil
   1400 Opus Place, Suite 500
   Downers Grove, IL 60515
   SUBJECT:        NRC INSPECTION REPORT 50 295/97023; 50-304/97023 AND
                   NOTICE OF VIOLATION
   Dear Mr. Kingsley:
   This refers to the inspection conducted on September 8 through December 16,1997, at the
   Zion Units 1 and 2 reactor facilities. The enclosed report presents the results of this i~ 'ction.
   The inspection involved examination of engineering activillas primarily related to the Unit 2
   restart with a focus on reviewing corrective actions taken to address engineering issues
   identified during the Engineering and Technical Support (E&TS) inspection in 1996. The
   inspectors evaluated the effectiveness of your engineering and support groups in identifying,
   assessing and resolving technicalissues. The inspectors also evaluated the effectiveness of
   your self assessment and corrective action processes.
   The NRC noted that engineering related improvements have occurred (mainly in the design
   enginecring organization) since the E&TS lnspection conducted in 1996. Various engineering .
                                                  _
   related improvement programs such as the design basis initiative, operating experience and the
   engineering assurance group have been initiated; however, it was too early to assess the long
   term effectiveness of these programs. Furthermore, the violations identified by the NRC and
   discussed in this report, represent continuing chelhnges that remain to be addressed.
   Based on the results of this inspection, the NRC has determined that five violations of NRC
   requirements occurred. These vlotations are cited in the enclosed Notice of Violation (Notice)
   and the circumstances surrounding them are described in detallin the s
   The subject violations irivolve failure to adhere to scaffoldirg procedure requirements;
   ineffective corrective actions, relating to out of tolerance and oil samples; failure to ensure that
                                                                                                        [
   proficiency and qualifications were adequately achieved and maintained for Raychem splice
   applications; failure to report identified discrepancies in the emergency core cooling system
   small break loss of coolant accident analysis; and a failure to report a condition outside the
   design basis in a timely manner.
                Nn013
 ggg20;ggg;;gagg
                                  ,
                                                    I,l ,l!. !.!!,[ !!( !!h ,!
                                                            ,
                                                                  >
                                                                                      )[[f
                                                 _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ - _ _
   .
 3
                                                                                                           2
     O. Kingsley                                                        2
                                                                                         ,lanuary 27, 1998
     Please note that you are required to respond to this letter and should follow the instructions
     specified in the enclosed Notice when preparing your response. The NRC will use your
     response, in part, to determine whether further enforcement action is necessary to ensure
     compliance with regulatory requirements.
     In addition, three apparent violations were identified and are being considered for escalated
     enforecment action in accordance with the " General Statement of Policy and Procedure for
     NRC Enforcement Actions"(Enforcement Policy), NUREG 1600. The apparent violations
     involve cross tying 125 Vdc buses from Unit 1 to Unit 2 with the battery and charger
     disconnected from the bus and the associated buses not being declared inoperable. This
     situation continued to occur ofter your staff Identified in September 1996 that the cross tying
     resulted in the plant being outside its design basis. Upon completion of this evaluation you
     failed to ensure that the design bases were correctly translated into appropriate procedures.
     Additionally, you failed to adhere to the requirements of T.S. 3.15.2.E when one 125 Vdc
     battery and/or distribution system for a unit was not operable. Although the NRC began
     questioning the practice in March 1997, cross-tying was not discontinued until August 1997.

, While both units were shutdown during this period, your engineering staff did not complete its

     evaluation to determine the acceptability of cross tying under shutdown conditions until
     September 1997,

1 l No Notice of Violation is presently being issued for these three apparent violations. However,

     we request that you respond within 30 days of the date of this letter to the apparent violations
     discussed in the enclosed inspection report. Your response should be clearly marked as a
     * Response to Apparent Violations in Inspection Report Nos. 50-295/97023; 50-304/97023 and

l should include for each apparent violation: (1) the reason for the apparent violation, or, if ! contested, the basis for disputing the apparent violation, (2) the corrective steps that have been

     taken and the results achieved, (3) the corrective step = that will be taken to avoid further
     violations, and (4) the date when full compliance will be achieved. Your response should be
      submitted under oath os affirmation and may reference or include previous docketed
      correspondence, if the correspondence adequately addresses the required response.
     We Intend to review your response to the apparent violations described in the enclosed
      inspection report. Based on the results of this raview, we will determine whether a
      pre-decisional enforcement conference is necessary to enable the NRC to make an
      enforcement decision. You also have the right to request a conference if you deem it
      necessary. Please be advised that the number and characterization of apparent violations
      described in the enclosed inspection report may change as a result of further NRC review. You
      will be advised by separate correspondence of the results of our deliberations on this matter.
   .
 ,
     O. Kingsley                                                         3                                         January 27, 1998
     in accordance with 10 CFR 2.700 of the NRC's " Rules of Practice," a copy of this letter, its

<

     enclosures, and your response will be placed in the NRC Public Document Room (PDR).
                                                             Sincerely,
                                                               original signed by C. E. Grant
                                                              Geoffrey E. Grant, Director
                                                              Division of Reactor Projects
     Docket Nos: 50-295; 50 304
     License Nos: DPR 39; DPR-48
     Enclosures: 1. Notice of Violation
                           2. Inspection Report
                                  Nos, 50-295/97023; 50 304/97023
     cc w/encls:             M. Wallace, Senior Vice President,
                               Corporate Services
                             H. G. Stanley, Vice President,
                                PWR Operations
                            J. Perry, Vice President
                                BWR Operations
                             Liaison Officer, NOC-BOD
                             D. A. Sager, Vice President,
                               Generation Support
                             D. Farrar, Nuclear Regulatory
                               Services Manager
                             1. Johnson, Licensing Operations Manager
                             Document Control Desk - Licensing
                             R. Starkey, Plant General Manager
                             R. Godley, Regulatory Assurance
                               Supervisor
                             Richard Hubbard
                            Nathan Schloss, Economist,
                              Office of the Attorney General
                             Mayor, City of Zion
                             State Liaison Officer
                             State Liaison Officer, Wisconsin
                             Chairme.n, Illinois Commerce Commission
     See Attached Distribution
     DOCUMENT NAME: G:DRS\ZIO97023.DRS (See Previous Concurrence)
     1. ,.c.~. . ..,y .e in    co    oow.i. i. is. .., c . ceny -isoui .,i.com.~i,.ac,n.o,. v . cccy in .,,,cs, v.acin.o,. v . we cory
       OFFICE            Rlll/DRS               Rill /DRS                Rlll/DRP                  Rlil/ENF                 Rill /DRS   Rlli/DRP
       NAME              Guzman                 Lougheed                 Hills                     Clayton                  Grobe      Gran
                         Falevits:sd                                     Vegel                                                              Ak
       DATE              01/ /98        ~'
                                                01/ /98                  01/ /98                   01/ /98                  01/ /98    01tTftW
                                                         OFFICIAL RECORD COPY
              . - -     -.                        -        -       _          .. -        -.      - -     .      - - - - -
         .
'.
            J. Brons                                             3
  .
             In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
            enclosures, and your response will be placed in the NRC Public Document Room (PDR),
                                                        Sincerely,
                                                         Geoffrey E. Grant, Director
                                                         Division of Reactor Projects
            Docket Nos: 50 295;50 304
             License Nos: DPR 39; DPR-48
             Enclosures: 1. Notice of Violation
                            2. Inspection Report
                                   Nos. 50 295/97023; 50 304/07023
                                                                                                                           "
            cc w/encis:        O. Kingsley, Nuclear Generation Group
                                 President & Chief Nuclear Officer
                               M. Wallace, Senior Vice President;
                                 Corporate Services
                               H. G. Stanley, Vice President,
                                 PWR Operations
                               Liaison Officcc. NOC-BOD
                               D. A. Sager, Vice President,
                                Generation Support
                               D. Farrar, Nuclear Regulatory
                                Services Manager
                               1. Johnson, Licensing Operations Manager
                               Document Control Desk - Licensing
                               R. Starkey, Plant General Manager
                               R. Godity, Regulatory Assurance
                                Supervisor
                               Richard Hubbard
                               Nathan Schloss, Economist,
                                Office of the Attorney General
                               Mayor, City of Zion
                               State Liaison Officer
                               State Liaison Officer, Wisconsin
                               Chairman, Illinois Commerce Commission
            Distribution
            Docket File w/encls                Ril; PRR w/encls                       Rill Enf. Coordinator w/encls
            PUBLIC IE-01 w/ enc!s              SRI, Zion w/encls                      TSS w/encls
            LPM, NRR w/encls                  J. L. Caldwe'l, Rlli w/encls            R. A. Capra, NRR w/enets
            DRP w/encls                       A. B. Beach, Rlli w/ene!s               DOCDESK w/encls
            DRS w/encls                        G. E. Grant, Rlli w/encls              CAA1 w/encls

DOCUMENT NAME: G:DRS\ZIO97023.DRS. 4<su mvous coecumeco v. .~..e m enein e.e m i.,se. mie w ca. c e m . w w . r . e m .+ .n. w ., e . ir . wo m

 OFFICE         Rill /DRS    l     Rlll/DRS         Rill /DRP           Rlll/ENF         Rlll/DRS,l      Pill /DRP
 NAME           Guzman        g    Loughded         Hills *             Clayton          Gro           Grant
                Falevits:sd
                                               4 Vegel4
 DATE           01/ /98            01/ /98          01/ /08            01/ /98           01/lP98       01/ /98
                                                     OFFICIAL RECORD COPY
                                                                                                _
                        _ _ - _ . _ _ _ _ _ _ - _ - _ - - _
         ,
 '.
                       '
            J. Brons                                                                         3
   .
            In accordance with 10 CFR 2.700 of the NRC's " Rules of Practice," a copy of this letter,its                                         ;
            enclosures, and your response will be placed in the NRC Public Document Room (PDR).
                                                                                    Sincerely,
                                                                                      Geoffrey E. Grant, Director
                                                                                      Division of Reactor Projects
            Docket Nos: 50 295;50-304
            License Nos: DPR 39; DPR-48
            Enclosures: 1. Notice of Violatloc
                                                2. Inspection Report
                                                                Nos. 50-295/97023; 50-304/97023
            cc w/encts:                                   O. Kingsley, Nuclear Generation Group
                                                               President & Chief Nuclear Officer
                                                           M. Wallace, Senior Vice President,
                                                               Corporate Services
                                                           H. G. Stanley, Vice President,

l PWR Operations !

                                                            Liaison Officer, NOC-BOD

l D. A. Sager, Vice President,

                                                              Generation Support

l l D. Farrar Nuclear Regulatory

                                                              Services Manager

, '

                                                            I. Johnson, Licensing Operationa Msnager
                                                            Document Control Desk - Licensing
                                                            R. Starkey, Plant General Mana0er
                                                            R. Godley, Regulatory Assurance
                                                              Supervisor
                                                            Richard Hubbard
                                                            Nathan Schloss, Economist,
                                                              Office of the Attomey General
                                                            Mayor, City of Zion
                                                            State Liaison Officer
                                                            State Liaison Officer, Wisconsin
                                                            Chairman, Illinois Commerce Commission
             Distribution
             Docket File w/encls                                            Rlli PRR w/encls                       Rlli Enf. Coordinator w/encls
             PUBLIC IE-01 w/encls                                           SRI, Zion w/encls                      TSS w/encls
             LPM, NRR w/encls                                               J. L. Caldwell, Rlll w/encls            R. A. Capra, NRR w/encls
             DRP w/encls                                                    A. B. Beach, Rlll w/encls               DOCDESK w/encls
             DRS w/encls                                                    G E. Grant, Rlli w/encls               CAA1 w/encls
  DOCUMENT NAME: G:DRS\ZIO97023.DRS
  tomo...m wmi.*e-au,*.                                       mm..m c em e . e t % . e.e w ..= ~ ~ . >c.wem
    OFFICE Rlll/DRS                                    lc Rlll/DRS b/ Rlll/DRP E Rlll/DRP                          6 Rill /DRP         Rlll/DRg
   ~$AME                                                         L9vgheed         Hills             Vogel              Grant        Grobe
               Guzmanf[
               Falevite:sd                                       @ *e                                      gM
    DATE       01/1/98                                           01/2/98          01/5/98            01/fl98           01/ /98      01/ /98
                                                                                  OFFICIAL RECORD COPY

.

    .                 .  . .  . -       . - - . . . . .   - - - . - . _ . . ~ . - . - . -                 . . - - _ - . - - - - .
                                                                                                                                    ,
      .                                                                                                                           r
  -
        - O. Kingsley                                   4                                         January 27, 1998

. 4

         Distribution
         Docket File w/encls      Rlli PRR w/encls                                        Rill Enf. Coordinator w/encls
         PUBLIC IE-01 w/encls     SRI, Zion w/ enc ls                                     TSS w/encls
         LPM, NRR w/encls         J L. Caldwell, Rlli w/encls                             R. A. Capra, NRR w/encls

, DRP w/encls A; B. Beach, Rlli w/encls DOCDESK w/encls ~

         DRS w/encls              G. E. Grant, Rlli w/encls                               CAA1 w/encls         J.
         Lieberman, OE            J. Goldberg, OGC                                        R. Zimmerman, NRR

i '

                                                                                                                                  i

Y i 4 5 5. 1- .- +

}}