Monthly Operating Repts for Dec 1998 for Browns Ferry Nuclear Plant.With 990115 Ltr
ML20199K895
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 12/31/1998
From: Abney T, Jay Wallace
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9901270060
Download: ML20199K895 (13)


Text

l l . s -

l -e.

,5 l l

i RIA \

Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 January 15, 1999 i

i l

l l

U.S. Nuclear Regulatory Commission i ATTN: Document Control Desk Washington, D.C. 20555 j Gentlemen:

I In the Matter of ) Docket Nos. 50-259  !

Tennessee Valley Authority ) 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - DECEMBER 1999 MONTHLY OPERATING REPORT l The enclosure provides the December 1998 Monthly operating Report as required by BFN Technical Specifications Section 5.6.4.

If you have any questions concerning this matter, please call me at (256) 729-2636. l Shcerely, /

( /

ne -

Manager of censing and Ind stry Affairs -h Enclosure cc: Seepagb 9901270060 981231 34 PDR ADOCK 05000259 R PM b

o- o p.S. Nuclear Regulatory Commission Page 2 ,

January 15, 1999 i

1 Enclosure j cc (Enclosure) :

Mr. Harold O. Christensen, Branch Chief i U.S. Nuclear Regulatory Commission j Region II 61 Forsyth Street, S.W.

Suite 23T85 Atlanta, Georgia 30303 Mr. Cecil O. Thrmas, Director' l Project Directorate 11-4 Division of Reactor Projects _.I-II Office of Nuclear Reactor  :

Regulation, Mail 13 H3 l Washington, D.C. 20555  ;

INPO Records Center I Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5957 Mr. James Lang, Manager Advanced Reactor Department .

Electric Power.Research Institute l 3340 Hillview Avenue Palo Alto, California 94304 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611 Regional Administrator U.S. Nuclear Regulatory Commission

-Region II 61 Forsyth Street, S.W.

Suite 23T85 Atlanta, Georgia 30303 Ms. Barbara Lewis McGraw-Hill Companies 1200 G Street, N.W.

Suite 1100 Washington, D.C. 20005-3802 I

l

a - a - -- - - - -~, -- - ..n - - . . . . .- , , -_ ,

l l . , . . . ENCLOSURE l.

l ',

L TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN) y

, MONTHLY OPERATING REPORT l

DECEMBER 1998 l

UNIT 1 DOCKET NUMBER 50-259 LICENSE NUMBER DPR-33 l-UNIT 2 i

DOCKET NUMBER 50-260 LICENSE NUMBER DPR-52 i

UNIT 3 DOCKET NUMBER 50-296 LICENSE NUMBER DPR-68 i

f

a .

c, OPERATIONAL SUl@iARY DECEMBER 1998  !

BROWNS FERRY NUCLEAR PLANT UNIT 1 Unit 1 remains shutdown on administrative hold to resolve various TVA and NRC concerns. Unit 1 has been on administrative hold since June 1, 1985. As a result, TVA considers that accrual of reporting hours is suspended since the unit has a maximum dependable capacity of zero MWe. Accordingly, TVA does not consider reporting cumulative hours for the period beginning June 1, 1985, when-calculating the operating status variables.

BROWNS FERRY NUCLEAR PLANT UNIT 2 For the month of December, Unit 2 generated 813,190 megawatt hours gross electrical power and operated at a net capacity factor of 100.2 percent. As of December 31, 1998, Unit 2 has operated continuously for 90 days.

BROWNS FERRY NUCLEAR PLANT UNIT 3 For the month of December, Unit 3 generated 868,130 megawatt hours gross electrical power with a net capacity factor of 102.1 percent. As of December 31, 1998, Unit 3 has operated continuously for 77 days.

E-1

..< .. e .

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-259 UNIT NO. ONE DATE: Jan. 6, 1999 COMPLETED BY: J. E. Wallace TELEPHONE 256-729-7874 MONTH' DECEMBER 1998 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net) DAY (MWe-Net)

1. 0 17. 0
2. 0 18. 0
3. 0 19. 0
4. 0 20. 0
5. 0 21. 0
6. 0 22. 0
7. 0 23. 0
8. 0 24. O c 9. 0 25. O i;
10. 0 26. 0
11. 0 27. 0 12 0 28. 0
13. - 0 29. 0
14. 0 30. 0
15. 0 31. 0
16. 0 E-2

l 1

AVERAGE DAILY UNIT POWER LEVEL  !

DOCKET NO. 50-260 UNIT NO. TWO DATE: Jan. 6, 1999  !

i l

COMPLETED BY: J. E. Wallace TELEPHONE 256-729-7874  :

l-MONTH DECEMBER 1998 j

l AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net) DAY (MWe-Net)  ;

1. 1079 17. 1070 I I
2. 1075 18. 1089  !

l

'3. 1077 19. 1080

4. 1083 20. 993
5. 1084 21. 1092 6 '. . 1088 22. 1086

)

7. 1087 2.3 . 1083
8. 1071 24. 1078
9. 1077 25. 1089
10. 1076 26, 1083
11. 1033 27. l'090 12 854 28. 1085
13. 1001 29. 1085 .

I

14. 1063 30. 1093

' 15 . 1068 31. 1093

16. 1082  !

1 E-3

1 l .

i AVERAGE DAILY UNIT POWER LEVEL l .  ;

1 DOCKET NO. 50-296 UNIT NO. THREE DATE: Jan. 6, 1999 l

COMPLETED BY: J. E. Wallace TELEPHONE 256-729-7874 MONTH DECEMBER 1998 i

l >

l  !

. AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL i

DAY (MWe-Net) DAY (MWe-Net)

1. 1149 17. 1143
2. 1144 18. 1151
3. 1146 19. 1151
4. 1147 20. 1135
5. 1145 21. 1123
6. 1147 22. 1160 .
7. 1149 23. 1151 ,
8. 1139 24. 1139 l
9. 1143 25. 1150 ,
10. 1140 26. 1137
11. 1142 27. 1144 12 1140~ 28. 1135
13. 1084 29. 1143  :

1

14. 1143 30. 1152 15, 1159 31. 1146

.16. 1114 I

E-4

. . l OPERATING DATA REPORT

~

Docket No. 50-259 l Date: Jan.6.1999 l Completed By: J. E. Wallace l l Telephone: (256)-729-7874 t

1. Unit Name: BFN Unit 1
2. Reporting Period: December 1998

! 3. Licensed Thermal Power (MWt): 3293 l

4. Nameplate Rating (Gross MWe): 1152
5. Design Electrical Rating (Net MWe): 1065
6. Maximum Dependable Capacity (Gross MWe): 2 t 7. Maximum Dependable Capacity (Net MWe): 2  ;
8. If changes Occur in Capacity Rating (Item Numbers 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If any (net MWe): 0
10. Reasons for Restrictions, If any: Administrative Hold This Month Yr-To-Date Cumulative *
11. Hours in Reporting Period 0 0 95743  ;
12. Number of Hours Reactor was Critical 0 0 59521
13. Reactor Reserve Shutdown Hours 0 0 6997
14. Hours Generator On-Line 0 0 58267
15. Unit Reserve Shutdown Hours 0 0 0 *
16. Gross Thermal Energy Generated (MWh) 0 0 168066787

! 17. Gross Electric Energy Generated (MWh) 0 0 55398130

18. Net Electrical Energy Generated (MWh) 0 0 53796427
19. Unit Service Factor 0 0 60.9
20. Unit Availability Factor 0 0 60.9
21. Unit Capacity Factor (Using MDC Net) 0 0 52.8
22. Unit Capacity Factor (Using DER Net) 0 0 52.8
23. Unit Forced Outage Rate 0 0 25.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A
' 25. If Shutdown at End of Report Period, Estimate Date ofStartup: To Be Determined
  • Excludes hours under Administrative Hold l (June 1,1985 to present) l E-5 l

-. - - - ~ . . _ - - .

I i

OPERATING DATA REPORT

.'. I.

Docket No. 50-260 Date: Jan.6.1999 Completed By: J. E. Wallace Telephone: (256)-729-7874 l 1. Unit Name: BFN Unit 2

2. Reponing Period: December 1998 l 3. Licensed Thermal Power (MWt): 3293 4; Nameplate Rating (Gross MWe): 1152
5. Design Electrical Rating (Net MWe): 1065
6. Maximum Dependable Capacity (Gross MWe): 1098.4
7. Maximum Dependable Capacity (Net MWe): 1065 h
8. If changes Occur in Capacity Rating (Item Numbers 3 Through 7) Since Last Repon, Give Reasons: N/A
9. Power Level To Which Restricted, If any (net MWe): N/A
10. R.easons for Restrictions, If any: N/A This Month Yr-To-Date Cumulatiyg*
11. Hours in Reporting Period 744.0 8760.0 15713!
12. Number of Hours Reactor was Critical 744.0 8735.0 115542
13. Reactor Reserve Shutdown Hours 0.0 0.0 14200
14. Hours Generator On-Line 744.0 8730.0 113143
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 1
16. Gross Thermal Energy Generated (MWh) 2414383.0 28540860 338576344 "7

Gross Electric Energy Generated (MWh) 813190.0 9520480 112522958 j i d. Net Electrical Energy Generated (MWh) 794079.0 9301037 109507128

19. Unit Service Factor 100.0 99.7 72.0
20. Unit Availability Factor 100.0 99.7 72.0
21. Unit Capacity Factor (Using MDC Net) 100.2 99.7 65.4 -
22. Unit Capacity Factor (Using DER Net) 100.2 99.7 65.4
23. Unit Forced Outage Rate 0.0 0.3 13.2
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): Unit 2, Cycle 10 refueling outage is scheduled to begin on April 11,1999, for a duration ,

of 25 days.  :

! 25. If Shutdown at End of Report Period, Estimate Date ,

of Startup: N/A

  • Excludes hours under Administrative Hold (June 1,1985 to May 24,1991)

E-6 1

- . . - . .. -, .- -- ~ . - . .- . . - _ -

t:. .

, . j i

=

l .. =,

OPERATING DATA REPORT Docket No. 50-296  !

Date: Jan.6.1999 j Completed By: J. E. Wallace Telephone: (256)-729-7874

1. Unit Name: BFN Unit 3 'l
2. Reporting Period: December 1998
3. Licensed Thermal Power (MWt): 3458
4. Nameplate Rating (Gross MWe): 1190
5. Design Electrical Rating (Net MWe): 1120 L - 6. Maximum Dependable Capacity (Gross MWe): 1155
7. Maximum Dependable Capacity (Net MWe): 1118
8. If changes Occur in Capacity Rating (Item Numbers 3 Through 7) Since Last Report,  ;

l Give Reasons: N/A I

~9 Power Level To Which Restricted, If any (net MWe): N/A

10. Reasons for Restrictions, If any: N/A This Month Vr-To-Date Cumulative *
11. Hours in Reporting Period 744.0 8760.0 100357
12. Number of Hours Reactor was Critical 744.0 7907.0 70981
13. Reactor Reserve Shutdown Hours 0.0 0.0 7195
14. Hours Generator On-Line 744.0 7863.6 69585
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWh) 2571430.0 24477754.0 211912667
17. Gross Electric Energy Generated (MWh) 868130.0 8091860 70855270
18. Net Electrical Energy Generated (MWh) 849371.0 7885977 68091474
19. Unit Service Factor 100.0 89.8 69.3 20.' . Unit Availability Factor 100.0 89.8 69.3 ,

21.- Unit Capacity Factor (Using MDC Net) 102.1 83.5 63.6 l

22. Unit Capacity Factor (Using DER Net) 102.1 83.5 63.6
23. - Unit Forced Outage Rate 0.0 0.1 15.1 i

' 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and l Duration ofEach): N/A

25. If Shutdown at End ofRepon Period, Estimate Date of Startup:

N/A

  • Excludes hours under Administrative Hold

(- (June 1,1985 to November 19,1995)

E-7 I.

l

UNIT SIIUTDOWNS AND POWER REDUCTIONS +

REPORT MONTH: DECEMBER 1998 DOCKET NO: 50-259 UNIT NAME: BFN-1 ,,

DATE: January 6,1999 COMPLETED BY: J. E. Wallace TELEPHONE: (256) 729-7874 No. ' Date:

Type' Duration Reason

  • Method of? Licensee ; Systent - Component; .Cause and Corrective Action to Prevent t:1

'(Hours) Shutting 1 Event Report CodeY CodeV Recurrencet Down . No.-

Reactor' 1 06/01/85 S 744 F 4 N/A N/A N/A Administrative hold to resolve various TVA and NRC concerns.

2

' F: Forced Reason: ' Method

  • Instructions for Preparation of S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensec B-Maintenance or Test 2-Manual Scram Event Report (LER)

C-Refueling 3-Automatic Scram (NUREG - 1022)

D-Regulatoiy Restriction 4-Contimaation of Existing E-Operator Training and License Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)

H-Other (Explain)

E-8

UNIT SHUTDOWNS AND POWER REDUCTIONS .

REPORT MONTil: DECEMBER 1998 DOCKET NO: 50-260 UNIT NAME: BFN-2 .

DATE: January 6,1999 ' '

COMPLETED BY: J. E. Wallace TELEPHONE: (256) 729-7874 No.'  ;; Date8 Type'; Durationi : Reason 2

^ '

Method $1: .Licenseej ~

Systent Cosaponent; ;Cause and Corrective Action to Prevent?

(Hours) ~

, Shutting 0 Event Reports Code *5 Code *'^ :Recurrencel

.Dowat No.

Reactdr's N/A 8

F: Forced ' Reason:

  • Method
  • Instructions for Preparation of S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER)

C-Refueling 3-Automatic Scram (NUREG - 1022)

D-Regulatory Restriction 4-Continuation of Existing E-Operator Training and License Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)

H-Other (Explain)

E-9

UNIT SHUTDOWNS AND POWER REDUCFIONS .-

REPORT MONTH: DECEMBER 1998 DOCKET NO: 50-296 UNIT NAME: BFN-3 .,

DATE: January 6,1999 COMPLETED BY: J. E. Wallace TELEPHONE: (256) 729-7874 No. 1Date ? . Type' Duration l Reason *:- Method 'of -Licenseej Systen Counponent" Cause and Corrective Action to Preventl

.(Hours)4 Shatting[ Event' Report - Codey (Code *" LRacurrence s

-Down4 No. W

~ Reactor'J N/A 2 8

' F: Forced Reason: Method

  • Instructions for Preparation of S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee E-Maintenance or Test 2-Manual Scram Event Report (LER)

C-Refueling 3-Automatic Scram (NUREG - 1922)

D-Regulatory Restriction 4-Continuation of Existing E-Operator Training and License Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)

H-Other (Explain)

E-10 t